Periodic replacement policies with shortage and excess costs
暂无分享,去创建一个
[1] Nizar Mannai,et al. Optimal design of k-out-of-n system under first and last replacement in reliability theory , 2020, Oper. Res..
[2] Shey-Huei Sheu,et al. Extended optimal preventive replacement policies with random working cycle , 2019, Reliab. Eng. Syst. Saf..
[3] Toshio Nakagawa,et al. Replacement policies with general models , 2019, Ann. Oper. Res..
[4] Yu-Hung Chien,et al. Optimal periodic replacement policy for a GPP repairable product under the free-repair warranty , 2019 .
[5] Yen-Luan Chen. Optimal scheduling replacement policies for a system with multiple random works , 2019 .
[6] Chin-Chih Chang,et al. Optimization of continuous and discrete scheduled times for a cumulative damage system with age-dependent maintenance , 2018, Communications in Statistics - Theory and Methods.
[7] Joachim Arts,et al. Design of multi-component periodic maintenance programs with single-component models , 2018 .
[8] Toshio Nakagawa,et al. Advanced Maintenance Policies for Shock and Damage Models , 2017 .
[9] Toshio Nakagawa,et al. Age replacement models: A summary with new perspectives and methods , 2017, Reliab. Eng. Syst. Saf..
[10] Toshio Nakagawa,et al. Replacement policies for age and working numbers with random life cycle , 2017 .
[11] T. Dohi,et al. Moment-based approach for some age-based replacement problems , 2017 .
[12] Ferenc Szidarovszky,et al. New one cycle criteria for optimizing preventive replacement policies , 2016, Reliab. Eng. Syst. Saf..
[13] Minjae Park,et al. Cost models for age replacement policies and block replacement policies under warranty , 2016 .
[14] Toshio Nakagawa,et al. First and Last Triggering Event Approaches for Replacement With Minimal Repairs , 2016, IEEE Transactions on Reliability.
[15] Toshio Nakagawa,et al. Where does "whichever occurs first" hold for preventive maintenance modelings? , 2015, Reliab. Eng. Syst. Saf..
[16] Dong Ho Park,et al. Optimal maintenance level for second-hand product with periodic inspection schedule , 2015 .
[17] Mingchih Chen,et al. A Failure-rate-reduction Periodic Preventive Maintenance Model with Delayed Initial Time in a Finite Time Period , 2014 .
[18] Toshio Nakagawa,et al. Replacement policies for a parallel system with shortage and excess costs , 2013, Reliab. Eng. Syst. Saf..
[19] Toshio Nakagawa,et al. Optimization problems of replacement first or last in reliability theory , 2012, Eur. J. Oper. Res..
[20] Toshio Nakagawa,et al. OPTIMAL AGE REPLACEMENT AND INSPECTION POLICIES WITH RANDOM FAILURE AND REPLACEMENT TIMES , 2011 .
[21] Michael Pinedo. Scheduling: Theory, Algorithms, and Systems , 1994 .
[22] Z. A. Lomnicki,et al. Mathematical Theory of Reliability , 1966 .
[23] Shey-Huei Sheu,et al. The generalized age maintenance policies with random working times , 2018, Reliab. Eng. Syst. Saf..
[24] Toshio Nakagawa,et al. Maintenance Overtime Policies in Reliability Theory , 2015 .
[25] 中川 覃夫,et al. Advanced reliability models and maintenance policies , 2008 .
[26] A. Blanc,et al. Total Productive Maintenance , 1993, International Symposium on Semiconductor Manufacturing.