Periodic replacement policies with shortage and excess costs

[1]  Nizar Mannai,et al.  Optimal design of k-out-of-n system under first and last replacement in reliability theory , 2020, Oper. Res..

[2]  Shey-Huei Sheu,et al.  Extended optimal preventive replacement policies with random working cycle , 2019, Reliab. Eng. Syst. Saf..

[3]  Toshio Nakagawa,et al.  Replacement policies with general models , 2019, Ann. Oper. Res..

[4]  Yu-Hung Chien,et al.  Optimal periodic replacement policy for a GPP repairable product under the free-repair warranty , 2019 .

[5]  Yen-Luan Chen Optimal scheduling replacement policies for a system with multiple random works , 2019 .

[6]  Chin-Chih Chang,et al.  Optimization of continuous and discrete scheduled times for a cumulative damage system with age-dependent maintenance , 2018, Communications in Statistics - Theory and Methods.

[7]  Joachim Arts,et al.  Design of multi-component periodic maintenance programs with single-component models , 2018 .

[8]  Toshio Nakagawa,et al.  Advanced Maintenance Policies for Shock and Damage Models , 2017 .

[9]  Toshio Nakagawa,et al.  Age replacement models: A summary with new perspectives and methods , 2017, Reliab. Eng. Syst. Saf..

[10]  Toshio Nakagawa,et al.  Replacement policies for age and working numbers with random life cycle , 2017 .

[11]  T. Dohi,et al.  Moment-based approach for some age-based replacement problems , 2017 .

[12]  Ferenc Szidarovszky,et al.  New one cycle criteria for optimizing preventive replacement policies , 2016, Reliab. Eng. Syst. Saf..

[13]  Minjae Park,et al.  Cost models for age replacement policies and block replacement policies under warranty , 2016 .

[14]  Toshio Nakagawa,et al.  First and Last Triggering Event Approaches for Replacement With Minimal Repairs , 2016, IEEE Transactions on Reliability.

[15]  Toshio Nakagawa,et al.  Where does "whichever occurs first" hold for preventive maintenance modelings? , 2015, Reliab. Eng. Syst. Saf..

[16]  Dong Ho Park,et al.  Optimal maintenance level for second-hand product with periodic inspection schedule , 2015 .

[17]  Mingchih Chen,et al.  A Failure-rate-reduction Periodic Preventive Maintenance Model with Delayed Initial Time in a Finite Time Period , 2014 .

[18]  Toshio Nakagawa,et al.  Replacement policies for a parallel system with shortage and excess costs , 2013, Reliab. Eng. Syst. Saf..

[19]  Toshio Nakagawa,et al.  Optimization problems of replacement first or last in reliability theory , 2012, Eur. J. Oper. Res..

[20]  Toshio Nakagawa,et al.  OPTIMAL AGE REPLACEMENT AND INSPECTION POLICIES WITH RANDOM FAILURE AND REPLACEMENT TIMES , 2011 .

[21]  Michael Pinedo Scheduling: Theory, Algorithms, and Systems , 1994 .

[22]  Z. A. Lomnicki,et al.  Mathematical Theory of Reliability , 1966 .

[23]  Shey-Huei Sheu,et al.  The generalized age maintenance policies with random working times , 2018, Reliab. Eng. Syst. Saf..

[24]  Toshio Nakagawa,et al.  Maintenance Overtime Policies in Reliability Theory , 2015 .

[25]  中川 覃夫,et al.  Advanced reliability models and maintenance policies , 2008 .

[26]  A. Blanc,et al.  Total Productive Maintenance , 1993, International Symposium on Semiconductor Manufacturing.