Effective Criteria for Seismic Rehabilitation Planning of Road Transportation Infrastructures

While seismic rehabilitation process for road infrastructures has been traditionally based on seismic factors, consideration of non-seismic factors is necessary for reliable project ranking. Non-seismic factors include socioeconomic criteria, determining the value of a project to its users’ community. Based on the information obtained from a questionnaire survey and literature review, this paper identifies a set of effective rehabilitation criteria (ERC) for seismic rehabilitation decision-making to develop a priority index that is applied to determine the rehabilitation priority. The identified RC will then be weighted for four types of road structures including bridges, tunnels, retaining walls, and buildings. The results can be generalized to provide valuable insights for policy makers concerned with transportation infrastructure planning, especially in developing countries where project prioritization is often an issue. To underline the value of the study, the weighted RC are applied in ranking road rehabilitation projects in an illustrative example.

[1]  Igal M. Shohet,et al.  Decision Support Model for the Allocation of Resources in Rehabilitation Projects , 2004 .

[2]  Wen-Chih Huang,et al.  Systematic budget allocation for transportation construction projects: a case in Taiwan , 2010 .

[3]  Dan M. Frangopol,et al.  RELIABILITY-BASED LIFE-CYCLE MANAGEMENT OF HIGHWAY BRIDGES , 2001 .

[4]  O. Holsti Content Analysis for the Social Sciences and Humanities , 1969 .

[5]  Tomas Hellström,et al.  Critical infrastructure and systemic vulnerability: Towards a planning framework , 2007 .

[6]  Roman Słowiński,et al.  Dominance-Based Rough Set Approach to Budget Allocation in Highway Maintenance Activities , 2011 .

[7]  Nurul Wahida Binti Mohamed Road maintenance management system : a case study at public work department , 2010 .

[8]  Liyin Shen,et al.  Key assessment indicators for the sustainability of infrastructure projects , 2011 .

[9]  Issam E. Harik,et al.  Bridge Embankments. I: Seismic Risk Assessment and Ranking , 2008 .

[10]  Wen-Chih Huang,et al.  THE BUDGET ALLOCATION MODEL OF PUBLIC INFRASTRUCTURE PROJECTS , 2010 .

[11]  Pernille Rattleff The reliability of content analysis of computer conference communication , 2007, Comput. Educ..

[12]  Satoshi Tanaka,et al.  System Risk Curves: Probabilistic Performance Scenarios for Highway Networks Subject to Earthquake Damage , 2007 .

[13]  Mohiuddin A Khan,et al.  Bridge and Highway Structure Rehabilitation and Repair , 2010 .

[14]  Christopher Mackey,et al.  Development of a prioritization methodology for maintaining Virginia's bridge infrastructure systems , 2009, 2009 Systems and Information Engineering Design Symposium.

[15]  J Brown,et al.  Management and control of cost and risk for tunneling and infrastructure projects , 2004 .

[16]  Silvana V. Croope Working with HAZUS-MH , 2009 .

[17]  Claudio Modena,et al.  A simplified management procedure for bridge network maintenance , 2011 .

[18]  Mohammadreza Yadollahi,et al.  Multi-strategy budget allocation decision support system for seismic rehabilitation of road infrastructure , 2014 .

[19]  Patrick X.W. Zou,et al.  Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China , 2007 .

[20]  A. Sharma,et al.  Critical evaluation of road infrastructure in India: a cross‐country view , 2009 .

[21]  Ying-Ming Wang,et al.  Risk Assessment for Bridge Maintenance Projects: Neural Networks versus Regression Techniques , 2007 .

[22]  Jamie E. Padgett,et al.  Risk-based seismic life-cycle cost–benefit (LCC-B) analysis for bridge retrofit assessment , 2010 .

[23]  David R. Riley,et al.  Sustainable performance criteria for construction method selection in concrete buildings , 2010 .

[24]  Chandra Bahadur Shrestha DEVELOPING A COMPUTER-AIDED METHODOLOGY FOR DISTRICT ROAD NETWORK PLANNING AND PRIORITIZATION IN NEPAL , 2003 .

[25]  Nils Rosmuller,et al.  Group decision making in infrastructure safety planning , 2004 .

[26]  Hongxia Guo Reform and Pilot Study of Survey Methodology for Road Freight Transport , 2010 .

[27]  Yeng-Horng Perng,et al.  Genetic algorithm-based decision support for the restoration budget allocation of historical buildings , 2007 .

[28]  Pablo Luis Durango-Cohen,et al.  Maintenance and repair decision making for infrastructure facilities without a deterioration model , 2004 .

[29]  Tarek Zayed,et al.  Budget Allocation for Steel Bridge Paint Maintenance , 2004 .

[30]  Yi-Chang Chiu,et al.  Decision Methodology for Allocating Funds across Transportation Infrastructure Assets , 2006 .

[31]  Alcira Kreimer,et al.  Building safer cities : the future of disaster risk , 2003 .

[32]  Thalia Anagnos,et al.  Rapid Visual Screening of Buildings for Potential Seismic Hazards , 1989 .

[33]  Reinhard Mechler,et al.  Natural disaster risk and cost-benefit analysis , 2003 .

[34]  Samuel T. Ariaratnam,et al.  RISK-BASED LIFE-CYCLE COSTING OF INFRASTRUCTURE REHABILITATION AND CONSTRUCTION ALTERNATIVES , 2003 .

[35]  Junn-Yuan Teng,et al.  THE BUDGET ALLOCATION OF TRANSPORTATION CONSTRUCTION PROJECTS BY FUZZY MULTICRITERIA GRADE CLASSIFICATION MODEL , 2007 .

[36]  Howard H. M. Hwang,et al.  Seismic Vulnerability Assessment of Highway Systems , 1995 .

[37]  Suzanne Wilkinson,et al.  Challenges to successful seismic retrofit implementation: a socio-behavioural perspective , 2011 .