A modified fuzzy approach to prioritize project activities

Project management is an important task in business although project is not just confined to business. Due to the uncertainty of the various variables involved in a project, over several past decades research is going on in the search for an efficient project management model. Although numerous crisp models are easily implementable, the potential of fuzzy models are huge. In the case of software development, the variables involved are highly dynamic. In this paper, we propose a ranking based fuzzy model that can prioritize various activities. We use a popular crisp model to test the effectiveness of the fuzzy model proposed. Simulation is done through Java Server Pages (JSP). There is considerable computational and managerial advantage in implementing the fuzzy model.

[1]  Terry Cooke-Davies,et al.  The “real” success factors on projects , 2002 .

[2]  Muhittin Oral,et al.  A methodology for collective evaluation and selection of industrial R&D projects , 1991 .

[3]  Jeffrey K. Pinto,et al.  Critical factors in successful project implementation , 1987, IEEE Transactions on Engineering Management.

[4]  Athar Kharal,et al.  On Fuzzy Soft Sets , 2009, Adv. Fuzzy Syst..

[5]  Vittal S. Anantatmula,et al.  Project Manager Leadership Role in Improving Project Performance , 2010 .

[6]  Angela Clarke,et al.  A practical use of key success factors to improve the effectiveness of project management , 1999 .

[7]  Luciana Hazin Alencar,et al.  A multiple criteria decision model for assigning priorities to activities in project management , 2009 .

[8]  Joseph C. Paradi,et al.  Information systems project prioritization using data envelopment analysis , 2005, Math. Comput. Model..

[9]  W. Cook,et al.  Preference voting and project ranking using DEA and cross-evaluation , 1996 .

[10]  Y H Chen Fuzzy Ratings in Mechanical Engineering Design—Application to Bearing Selection , 1996 .

[11]  Oscar H. IBARm Information and Control , 1957, Nature.

[12]  Joyce Fortune,et al.  Current practice in project management — an empirical study , 2002 .

[13]  Seftya Eka Fahyan Project management : a systems approach to planning, scheduling, and controlling / Harold Kerzner , 1996 .

[14]  Marina Bosch,et al.  Fuzzy Multiple Attribute Decision Making Methods And Applications , 2016 .

[15]  George Mavrotas,et al.  Project prioritization under policy restrictions. A combination of MCDA with 0-1 programming , 2006, Eur. J. Oper. Res..

[16]  Shyi-Ming Chen,et al.  A NEW METHOD FOR HANDLING MULTICRITERIA FUZZY DECISION-MAKING PROBLEMS USING FN-IOWA OPERATORS , 2003, Cybern. Syst..

[17]  Luis C. Dias,et al.  IRIS: a DSS for multiple criteria sorting problems , 2003 .

[18]  Jing-Shing Yao,et al.  Ranking fuzzy numbers based on decomposition principle and signed distance , 2000, Fuzzy Sets Syst..

[19]  C. William Ibbs,et al.  Priority ranking—a fuzzy expert system for priority decision making in building construction resource scheduling , 1990 .

[20]  Yonghua Chen,et al.  Determining parting direction based on minimum bounding box and fuzzy logics , 1997 .

[21]  Sudhir Misra,et al.  Ranking and classification of construction coordination activities in Indian projects , 2007 .

[22]  Raimir Holanda Filho,et al.  Ranking Projects Using Multivariate Statistics , 2008 .

[23]  D. Molodtsov Soft set theory—First results , 1999 .

[24]  Wade D. Cook,et al.  Project prioritization: a resource-constrained data envelopment analysis approach , 2000 .

[25]  C. S Lim,et al.  Criteria of project success: an exploratory re-examination , 1999 .

[26]  Albert P.C. Chan,et al.  Determinants of Successful Design-Build Projects , 2008 .