A hierarchical cost estimation tool
暂无分享,去创建一个
David A. Koonce | Robert P. Judd | Dusan N. Sormaz | Dale T. Masel | R. Judd | D. Sormaz | D. Koonce
[1] Rajiv D. Banker,et al. An empirical analysis of manufacturing overhead cost drivers , 1995 .
[2] Angela Locascio,et al. Manufacturing Cost Modeling for Product Design , 2000 .
[3] Chan S. Park,et al. An economic evaluation model for advanced manufacturing systems using activity-based costing , 1988 .
[4] J. M. Castelain,et al. Cost Estimation During Design Step: Parametric Method versus Case Based Reasoning Method , 1999 .
[5] 김규태. An Economic Evaluation Model for Advanced manufacturing Systems Using Activity-Based Costing , 1995 .
[6] Arnick Boons,et al. Product costing for complex manufacturing systems , 1998 .
[7] Jeremy Busby,et al. The limited informativeness of resource discrepancy feedback to designers , 1997 .
[8] Michael W. Bailey,et al. Integrated Multidisciplinary Design , 1999 .