조선 블록 조립 공장의 생산계획 검증을 위한 입력 정보 체계 방법 제안

Recently the shipbuilding industry, shipping industry due to the sudden downturn, is facing difficulties such as order reduction or cancellation. Ships are not built in a short period of time. Therefore, the delay or cancellation of ship orders when unexpected situations to reflect the new production plans are scheduled. But current production plan system is not automation and established by the experience of scheduler. As a result, production plans and performance in the field have caused a lot of difference. The nature of the shipbuilding industry is large and complicated process, because it is difficult to plan a sophisticated production. In this paper, the proposed input information structure is to verify the production plan. It proposed method consists of using simulation technology. And use simulation to validate the production plan. Using this System, shipbuilding industry enables precise production plan.