Cost-benefit analysis of power system reliability: two utility case studies
暂无分享,去创建一个
Roy Billinton | E. G. Neudorf | G. A. Hamoud | M. P. Bhavaraju | B. Porretta | D. L. Kiguel | W. M. Stephenson | R. W. Sparks | D. M. Logan | D. Garrison
[1] A. Merlin,et al. Recent improvements of the Mexico model for probabilistic planning studies , 1979 .
[2] J. Endrenyi,et al. Reliability Evaluation of Transmission Systems with Switching After Faults Approximations and a Computer Program , 1973 .
[3] Roy Billinton,et al. Utilization of interrupted energy assessment rates in generation and transmission system planning , 1991 .
[4] Roy Billinton,et al. A procedure for evaluating interrupted energy assessment rates in an overall electric power system , 1991 .
[5] Roy Billinton,et al. Probability distribution approach to describe customer costs due to electric supply interruptions , 1994 .
[6] L. Salvaderi,et al. Monte Carlo approach in planning studies: an application to IEEE RTS , 1988 .
[7] Roy Billinton,et al. Applied reliability assessment in electric power systems , 1991 .
[8] P.R.S. Kuruganty,et al. A reliability cost-benefit analysis for HVDC transmission expansion planning , 1988 .
[9] A. Merlin,et al. New Probabilistic Approach Taking into Account Reliability and Operation Security in EHV Power System Planning at EDF , 1986, IEEE Transactions on Power Systems.
[10] Roy Billinton,et al. BULK SYSTEM RELIABILITY - PREDICTIVE INDICES , 1990 .
[11] Roy Billinton,et al. A minimum cost assessment method for composite generation and transmission system expansion planning , 1993 .
[12] W.J. Lannes. Cost-Effectiveness Analysis of Substation Arrangements , 1982, IEEE Transactions on Reliability.
[13] J. M. David,et al. COMPUTING FUEL SAVINGS RESULTING FROM A REINFORCEMENT OF THE POWER TRANSMISSION SYSTEM , 1984 .
[14] Probability Subcommittee,et al. IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.