Identifying the critical success factors for target cost contracts in the construction industry
暂无分享,去创建一个
Patrick T.I. Lam | Albert P.C. Chan | Daniel W.M. Chan | James M.W. Wong | P. Lam | A. Chan | Daniel W. M. Chan | J. Wong
[1] M. J. Norušis,et al. SPSS 13.0 Guide to Data Analysis , 2000 .
[2] Said Boukendour,et al. The guaranteed maximum price contract as call option , 2001 .
[3] Andy K. D. Wong. The application of a computerized financial control system for the decision support of target cost contracts , 2006, J. Inf. Technol. Constr..
[4] Apc Chan,et al. An analysis of project partnering in Hong Kong , 2002 .
[5] M. Barnes,et al. Target cost contracts: an analysis of the interplay between fee, target, share and price , 2000 .
[6] Robert D. Gilbreath. Managing construction contracts: Operational controls for commercial risks , 1983 .
[7] T. Ma,et al. Guaranteed maximum price contracting – A Qualitative study in South Australia , 2011 .
[8] Derek Osbourn,et al. Introduction to Building , 1985 .
[9] J. Ramalho-Santos,et al. Cronbach's alpha: a tool for assessing the reliability of scales , 1999 .
[10] Davide Nicolini,et al. Integrating project activities: the theory and practice of managing the supply chain through clusters , 2001 .
[11] Patrick T.I. Lam,et al. Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry , 2007 .
[12] John Cantirino,et al. Construction delivery systems in the United States , 1999 .
[13] Derek H.T. Walker,et al. Choosing an appropriate research methodology , 1997 .
[14] Keith D. Hampson,et al. Relationship Based Procurement Strategies for the 21st Century , 2000 .
[15] A. Chan,et al. An investigation of guaranteed maximum price (GMP) and target cost contracting (TCC) procurement strategies in Hong Kong construction industry , 2007 .
[16] D. S. Sivia,et al. Data Analysis , 1996, Encyclopedia of Evolutionary Psychological Science.
[17] M. Ferreira,et al. The quality management role of the owner in different types of construction contract for process plant , 1999 .
[18] Keith D. Hampson,et al. Project alliancing vs project partnering: a case study of the Australian National Museum Project , 2002 .
[19] S. Christian Albright,et al. Data Analysis and Decision Making , 2004 .
[20] S. Christian Albright,et al. Data Analysis and Decision Making with Microsoft Excel , 1999 .
[21] Apc Chan,et al. A comparative study of project partnering practices in Hong Kong , 2004 .
[22] Albert P.C. Chan,et al. Partnering in Construction: Critical Study of Problems for Implementation , 2003 .
[23] W. W. Daniel. Applied Nonparametric Statistics , 1979 .
[24] Albert P.C. Chan,et al. Exploring the key risks and risk mitigation measures for guaranteed maximum price and target cost contracts in construction , 2010 .
[25] C. Tomkins,et al. Can Target Costing and Whole Life Costing be Applied in the Construction Industry?: Evidence from Two Case Studies , 2000 .
[26] John G. Perry,et al. Experiences of the use of the New Engineering Contract , 1995 .
[27] C S Poon,et al. Cultural shift towards sustainability in the construction industry of Hong Kong , 2009, Journal of Environmental Management.
[28] D. Greenwood,et al. Guaranteed Maximum Price for the Project , 2004 .
[29] J. Masterman. An Introduction to Building Procurement Systems , 1990 .