Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems

In all papers on capacity load smoothing today, the production situation is always studied in isolation, i.e. not considering it as part of a manufacturing chain. If we do not study it in isolation the materials aspect will play an important role. As well the availability of components for the next production phase as the availability of materials might influence the structure of the load-based work-order release rule used. In this research we have investigated this by not only retarding the release of work-orders but also advancing work orders, which in general is possible due to a surplus of material. We called this proactive load-based work-order release. Furthermore, we distinghuished two types of components, critical and non-critical components, leading to what we called selective load-based work-order release. The effects on the delivery performance and the inventory holding costs have been investigated by a simulation study. It turns out that proactive release is better than conventional load-based work-order release but still worse than immediate release. Selective load-based work-order release might lead to a positive effect on the inventory holding costs, however this depends on the ratio of the inventory holding costs for the critical and non-critical components.

[1]  David R. Cox,et al.  THE SUPERPOSITION OF SEVERAL STRICTLY PERIODIC SEQUENCES OF EVENTS , 1953 .

[2]  Samuel Eilon,et al.  Due dates in job shop scheduling , 1976 .

[3]  Jwm Will Bertrand,et al.  Production control and information systems for component-manufacturing shops , 1981 .

[4]  D. Clay Whybark,et al.  MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .

[5]  Vincent A. Mabert,et al.  AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .

[6]  W. Whitt,et al.  Open and closed models for networks of queues , 1984, AT&T Bell Laboratories Technical Journal.

[7]  K. R. Baker,et al.  An investigation of due-date assignment rules with constrained tightness , 1981 .

[8]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[9]  J. Bertrand The effect of workload control on order flow times , 1981 .

[10]  J. Bertrand The Effect of Workload Dependent Due-Dates on Job Shop Performance , 1983 .

[11]  Gary L. Ragatz An evaluation of order release mechanisms for job shops , 1985 .

[12]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[13]  P. M. Bobrowski,et al.  Work release strategies in a dual resource constrained job shop , 1989 .

[14]  Jwm Will Bertrand Multiproduct Optimal Batch Sizes with In-Process Inventories and Multi Work Centers , 1985 .

[15]  S. Wittevrongel,et al.  Queueing Systems , 2019, Introduction to Stochastic Processes and Simulation.

[16]  Steven A. Melnyk,et al.  ORDER REVIEW/RELEASE AND ITS IMPACT ON THE SHOP FLOOR. , 1988 .

[17]  Kenneth R. Baker,et al.  The effects of input control in a simple scheduling model , 1984 .

[18]  P. S. Park,et al.  Load smoothing with feedback in a bottleneck job shop , 1995 .

[19]  James J. Solberg,et al.  Capacity Planning with a Stochastic Workflow Model , 1981 .

[20]  Lawrence M. Wein,et al.  A broader view of the job-shop scheduling problem , 1992 .

[21]  Uday S. Karmarkar,et al.  Multi-item Batching and Minimization of Queueing Delays , 1983 .

[22]  Jwm Will Bertrand,et al.  The use of workload information to control job lateness in controlled and uncontrolled release production systems , 1983 .

[23]  J. J. Kanet Load-limited order release in job shop scheduling systems , 1988 .