Joint assignment of buffer sizes and inspection points in unreliable transfer lines with scrapping of defective parts

An unreliable single part type transfer line with fixed inter machine buffer sizes is considered. In general, imperfect machines operating on imperfect raw material, or partially processed raw material, will result in the production of a mix of conforming and non conforming parts. The problem of optimal joint assignment of buffer sizes and inspection station positions is considered. The performance measure to be optimized is a combination of work in process storage, finished parts shortage, and parts inspection costs. A simplified quality aware machine Markovian model is proposed, and an approximate decomposition scheme for the analysis of the resulting transfer line model is developed, and then validated against detailed Monte Carlo simulations. The decomposition scheme lends to a dynamic programming based buffer size optimization scheme. The latter is implemented; joint buffer and inspections station positioning optimization results are reported.

[1]  Roland P. Malhamé,et al.  Unreliable Transfer Lines: Decomposition/Aggregation and Optimization , 2004, Ann. Oper. Res..

[2]  Robert Pellerin,et al.  Production control of unreliable manufacturing systems producing defective items , 2011 .

[3]  Semyon M. Meerkov,et al.  Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design , 2010 .

[4]  Fred Spiring,et al.  Introduction to Statistical Quality Control , 2007, Technometrics.

[5]  Stanley B. Gershwin,et al.  Analysis of long flow lines with quality and operational failures , 2008 .

[6]  Marcello Colledani Joint Design of Quality and Production Control in Multi-Stage Asynchronous Manufacturing Systems , 2011 .

[7]  Tullio Tolio,et al.  PERFORMANCE EVALUATION OF PRODUCTION SYSTEMS MONITORED BY STATISTICAL PROCESS CONTROL AND OFF-LINE INSPECTIONS , 2006 .

[8]  Semyon M. Meerkov,et al.  Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks , 2011, Ann. Oper. Res..

[9]  Jian-Qiang Hu Production rate control for failure-prone production systems with no backlog permitted , 1995 .

[10]  Stanley B. Gershwin,et al.  Integrated quality and quantity modeling of a production line , 2005, OR Spectr..

[11]  Dennis E. Blumenfeld,et al.  Survey of recent advances on the interface between production system design and quality , 2013 .

[12]  Tullio Tolio,et al.  Impact of Quality Control on Production System Performance , 2006 .

[13]  Robert Pellerin,et al.  A stochastic hybrid state model for optimizing hedging policies in manufacturing systems with randomly occurring defects , 2010, 49th IEEE Conference on Decision and Control (CDC).

[14]  Panganamala Ramana Kumar,et al.  Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems , 1988, Oper. Res..

[15]  Tullio Tolio,et al.  Integrated analysis of quality and production logistics performance in manufacturing lines , 2011 .

[16]  Stanley B. Gershwin HOW DO QUANTITY AND QUALITY REALLY INTERACT? PRECISE MODELS INSTEAD OF STRONG OPINIONS , 2006 .