Discussion of "Waste-based management in residential construction" by Jing Zhang, Danelle L. Eastham, and Leonhard E. Bernold
暂无分享,去创建一个
Andrew N. Baldwin | Zhen Chen | Heng Li | Heng Li | A. Baldwin | Zhen Chen
[1] Leonhard E. Bernold,et al. Design-Integrated Process Planner for Rebar Placement , 1995 .
[2] Andrew N. Baldwin,et al. Improving building design through integrated planning and control , 2002 .
[3] Zhen Chen. An integrated analytical approach to environmental management in construction , 2003 .
[4] Norbert Wiener,et al. Cybernetics: Control and Communication in the Animal and the Machine. , 1949 .