Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown

The optimal replenishment policy for an economic production quantity (EPQ)-based inventory model with nonconforming items and breakdown is presented. A real-life production system inevitably generates nonconforming items and has equipment breakdowns owing to process deterioration or other uncontrollable factors. This study addressed these issues in an EPQ-based system to optimize a replenishment policy that minimizes the long-run average cost for the proposed system. Whenever a breakdown occurs, the machine is assumed to immediately be under repair, and an abort/resume inventory control policy is adopted. Under this control policy production of the interrupted lot resumes immediately after the machine is fixed and restored. A mathematical model and a recursive algorithm were used to derive the optimal replenishment policy. A numerical example was used to demonstrate the practical application and better cost efficiency of the proposed policy compared to a breakdown that occurs under a no-resumption policy.

[1]  James C. Chen,et al.  Supply chain management with lean production and RFID application: A case study , 2013, Expert Syst. Appl..

[2]  Kamran Moinzadeh,et al.  Analysis of a production/inventory system subject to random disruptions , 1997 .

[3]  Helmut Schneider,et al.  The service level in inventory control systems , 1979 .

[4]  Manoj Kumar Tiwari,et al.  Addressing lot sizing and warehousing scheduling problem in manufacturing environment , 2011, Expert Syst. Appl..

[5]  Hong-Dar Lin,et al.  Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown , 2011, Comput. Ind. Eng..

[6]  A. G. de Kok Approximations for a Lost-Sales Production/Inventory Control Model with Service Level Constraints , 1985 .

[7]  Singa Wang Chiu,et al.  Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..

[8]  M A Rahim,et al.  Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products , 2001, J. Oper. Res. Soc..

[9]  Yuan-Shyi Peter Chiu,et al.  Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments , 2011, Math. Comput. Model..

[10]  Samarjit Kar,et al.  A volume flexible economic production lot-sizing problem with imperfect quality and random machine failure in fuzzy-stochastic environment , 2011, Comput. Math. Appl..

[11]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[12]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[13]  Ford W. Harris,et al.  How Many Parts to Make at Once , 1990, Oper. Res..

[14]  Singa Wang Chiu,et al.  Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework , 2012, Expert Syst. Appl..

[15]  Yuan-Shyi Peter Chiu,et al.  Replenishment run time problem with machine breakdown and failure in rework , 2012, Expert Syst. Appl..

[16]  Bibhas C. Giri,et al.  Production lot sizing with process deterioration and machine breakdown under inspection schedule , 2009 .

[17]  Morton J. M. Posner,et al.  Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..

[18]  Moawia Alghalith The interaction among production, hedging and investment decisions , 2013 .

[19]  S. Bylka Competitive and cooperative policies for the vendor–buyer system , 2003 .

[20]  Gregory A. DeCroix,et al.  Inventory management under random supply disruptions and partial backorders , 1998 .

[21]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[22]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[23]  N. E. Abboud A discrete-time Markov production-inventory model with machine breakdowns , 2001 .

[24]  Rajeev Kohli,et al.  Coordinating buyer-seller transactions across multiple products , 1994 .

[25]  Mohamed Ben-Daya,et al.  Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .

[26]  Yuan-Shyi Peter Chiu,et al.  Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..

[27]  Gour Chandra Mahata,et al.  An EPQ-based inventory model for exponentially deteriorating items under retailer partial trade credit policy in supply chain , 2012, Expert Syst. Appl..

[28]  S. Sana A collaborating inventory model in a supply chain , 2012 .

[29]  Viliam Makis,et al.  An EMQ model with inspections and random machine failures , 1998, J. Oper. Res. Soc..

[30]  B. Sarkar,et al.  An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand , 2013 .

[31]  Jason C. H. Chen,et al.  Location and allocation decisions for multi-echelon supply chain network - A multi-objective evolutionary approach , 2013, Expert Syst. Appl..

[32]  Tadashi Dohi,et al.  Exact formulation of stochastic EMQ model for an unreliable production system , 2004, J. Oper. Res. Soc..

[33]  Shib Sankar Sana,et al.  A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption , 2012 .