Simultaneous scheduling of machines and automated guided vehicles in flexible manufacturing systems using genetic algorithms
暂无分享,去创建一个
[1] Mohamed F. Hassan,et al. A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles , 2004 .
[2] Gündüz Ulusoy,et al. A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles , 1997, Comput. Oper. Res..
[3] Gündüz Ulusoy,et al. Simultaneous scheduling of machines and automated guided vehicles , 1993 .
[4] Jiyin Liu,et al. The classification of FMS scheduling problems , 1996 .
[5] Yash P. Gupta,et al. Minimizing flow time variance in a single machine system using genetic algorithms , 1993 .
[6] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[7] Yoshiakira Akimoto,et al. Genetic algorithms approach to voltage optimization , 1991, Proceedings of the First International Forum on Applications of Neural Networks to Power Systems.
[8] Sai On Cheung,et al. Site pre-cast yard layout arrangement through genetic algorithms , 2002 .
[9] Murayama Noboru,et al. Job-shop Scheduling Considering Material Handling by Multiple-load AGVs , 2005 .
[10] A. Sadegheih,et al. Sequence optimization and design of allocation using GA and SA , 2007, Appl. Math. Comput..
[11] Seok Jin Lim,et al. Hybrid approach to production scheduling using genetic algorithm and simulation , 2006 .
[12] Nostrand Reinhold,et al. the utility of using the genetic algorithm approach on the problem of Davis, L. (1991), Handbook of Genetic Algorithms. Van Nostrand Reinhold, New York. , 1991 .
[13] Angappa Gunasekaran,et al. Flexible manufacturing systems: An investigation for research and applications , 1993 .
[14] Tarek Hegazy,et al. Simplified Spreadsheet Solutions. II: Overall Schedule Optimization , 2001 .
[15] Kathryn E. Stecke,et al. Planning and scheduling approaches to operate a particular FMS , 1992 .
[16] Paul R. Drake,et al. Minimizing flow-time variance in a single-machine system using genetic algorithms , 2008 .
[17] Lawrence Davis,et al. Job Shop Scheduling with Genetic Algorithms , 1985, ICGA.
[18] Andrew Wirth,et al. Genetic Algorithms and Machine Scheduling With Class Setups , 1997 .
[19] J. A. Buzacott,et al. Flexible manufacturing systems: a review of analytical models , 1986 .
[20] Weiguo Fan,et al. Decision Support System induced guidance for model formulation and solution , 2005, Decis. Support Syst..
[21] Paul R. Drake,et al. Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms , 2009 .
[22] C.S.P. Rao,et al. A hybrid multi-objective GA for simultaneous scheduling of machines and AGVs in FMS , 2006 .
[23] Khaled Nassar,et al. Evolutionary Optimization of Resource Allocation in Repetitive Construction Schedules , 2005, J. Inf. Technol. Constr..
[24] Tarek Hegazy,et al. Resource Optimization Using Combined Simulation and Genetic Algorithms , 2003 .
[25] Kathryn E. Stecke,et al. Design, planning, scheduling, and control problems of flexible manufacturing systems , 1985 .
[26] Nikolay Tchernev,et al. A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles , 2008 .
[27] Dah-Chuan Gong,et al. The application of genetic algorithm in the development of preventive maintenance analytic model , 2007 .
[28] Andrew Kusiak,et al. Application of operational research models and techniques in flexible manufacturing systems , 1986 .
[29] Mikell P. Groover,et al. Automation, Production Systems, and Computer-Integrated Manufacturing , 1987 .
[30] H. Van Dyke Parunak,et al. Characterizing the manufacturing scheduling problem , 1991 .
[31] Darrell Whitley,et al. Genitor: a different genetic algorithm , 1988 .
[32] Haritha Saranga,et al. “Optimization of aircraft maintenance/support infrastructure using genetic algorithms—level of repair analysis” , 2006, Ann. Oper. Res..
[33] R. Saravanan,et al. Simultaneous scheduling of parts and automated guided vehicles in an FMS environment using adaptive genetic algorithm , 2006 .
[34] Jiyin Liu,et al. A new classification scheme for flexible manufacturing systems , 1993 .
[35] Seiichi Kawata,et al. A Genetic Algorithm Approach to Simultaneous Scheduling of Processing Machines and Multiple-load Automated Guided Vehicles , 2005 .
[36] Imran Ali Chaudhry,et al. Minimizing flow time for the worker assignment problem in identical parallel machine models using GA , 2010 .
[37] David He,et al. Construction of double sampling s‐control charts for agile manufacturing , 2002 .
[38] John J. Grefenstette,et al. Proceedings of the 1st International Conference on Genetic Algorithms , 1985 .
[39] Ruey-Shiang Guh,et al. Learning-based multi-pass adaptive scheduling for a dynamic manufacturing cell environment , 2006 .
[40] Gündüz Ulusoy,et al. A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS , 1995, Oper. Res..
[41] Seiichi Kawata,et al. Simulated Annealing Method for Simultaneous Scheduling of Machines and Multiple-load AGVs , 2006 .