Mathematical modeling for production system with backlogging and failure in repair

This paper employs mathematical modeling to derive the optimal lot size for economic production quantity model with random defective rate, imperfect rework process, and backlogging. In real life manufacturing process, the generation of defective items is inevitable. In this study, random defective rate is assumed and all defective items are reworked when regular production ends. During the rework process, a random portion of reworked items fails and becomes scrap. Disposal and repair costs are included in the proposed mathematical modeling and analysis. The optimal production lot size and backordering level that minimize overall production costs are derived. Numerical example is provided to demonstrate its practical usage.

[1]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[2]  R L Schwaller EOQ UNDER INSPECTION COSTS , 1988 .

[3]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[4]  Y. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .

[5]  Ronald L. Rardin,et al.  Optimization in operations research , 1997 .

[6]  R. J. Tersine Principles of inventory and materials management , 1982 .

[7]  Singa Wang Chiu,et al.  A finite production model with random defective rate and shortages allowed and backordered , 2003 .

[8]  T.C.E. Cheng,et al.  An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .

[9]  P. A. Hayek,et al.  Production lot sizing with the reworking of imperfect quality items produced , 2001 .

[10]  Mohamed Ben-Daya,et al.  The economic production lot-sizing problem with imperfect production processes and imperfect maintenance , 2002 .

[11]  Xin Zhang,et al.  Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .

[12]  Ping Yang,et al.  Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs , 1996 .

[13]  M. K. Salameh,et al.  Economic production quantity model for items with imperfect quality , 2000 .

[14]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[15]  Kun-Jen Chung Bounds for production lot sizing with machine breakdowns , 1997 .