Constrained resource project scheduling subject to material constraints
暂无分享,去创建一个
[1] J. D. Wiest,et al. A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .
[2] James H. Patterson,et al. Project scheduling: The effects of problem structure on heuristic performance , 1976 .
[3] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[4] Jerome D. Wiest. Some Properties of Schedules for Large Projects with Limited Resources , 1964 .
[5] Edward W. Davis. CPM Use in Top 400 Construction Firms , 1974 .
[6] James Herbert Patterson,et al. Alternate Methods of Project Scheduling with Limited Resources , 1973 .
[7] S. Lambourn,et al. Resource allocation and multi-project scheduling (RAMPS) - a new tool in planning and control , 1963, Computer/law journal.
[8] Edward W. Davis,et al. An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints , 1971 .
[9] James H. Patterson,et al. An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems , 1978 .
[10] J. D. Wiest,et al. Management Guide to PERT/CPM , 1969 .
[11] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[12] Dwight Edward Smith. A combined critical path method--material requirements planning model for project scheduling subject to resource constraints , 1980 .
[13] Rocco L. Martino. Project management and control , 1964 .
[14] James H. Patterson,et al. Scheduling a Project Under Multiple Resource Constraints: A Zero-One Programming Approach , 1976 .