A Fuzzy Genetic Algorithm for Single-Machine Scheduling and Flexible Maintenance Planning Integration under Human Resource Constraints

This research focuses on the problem of scheduling jobs on a single machine that requires flexible maintenance under human resource constraints. A fuzzy genetic algorithm that integrates production, maintenance, human resource availability and competence constraints is developed. This algorithm uses fuzzy logic to deal with uncertainties. Experiments show that the consideration of human resource constraints and uncertainties in the integrated and proactive scheduling allows proposing more realistic and applicable solutions.

[1]  Yeong-Dae Kim,et al.  Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance , 2012, Comput. Oper. Res..

[2]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[3]  Mostafa Zandieh,et al.  Incorporating periodic preventive maintenance into flexible flowshop scheduling problems , 2011, Appl. Soft Comput..

[4]  Christophe Varnier,et al.  Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness , 2008, Comput. Ind. Eng..

[5]  Chung-Yee Lee,et al.  Single machine flow-time scheduling with scheduled maintenance , 1992, Acta Informatica.

[6]  Reha Uzsoy,et al.  Planning Production and Inventories in the Extended Enterprise , 2011 .

[7]  Jen-Shiang Chen,et al.  Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan , 2008, Eur. J. Oper. Res..

[8]  Ghasem Moslehi,et al.  Minimising the total completion time in a single machine scheduling problem under bimodal flexible periodic availability constraints , 2016, Int. J. Comput. Integr. Manuf..

[9]  Sanja Petrovic,et al.  Fuzzy Logic-Based Production Scheduling and Rescheduling in the Presence of Uncertainty , 2011 .

[10]  Florica Luban,et al.  Membership functions, some mathematical programming models and production scheduling , 1982 .

[11]  Adam Kasperski,et al.  On two single machine scheduling problems with fuzzy processing times and fuzzy due dates , 2003, Eur. J. Oper. Res..

[12]  Shyi-Ming Chen FUZZY SYSTEM RELIABILITY-ANALYSIS USING FUZZY NUMBER ARITHMETIC OPERATIONS (VOL 64, PG 31, 1994) , 1994 .

[13]  Min Ji,et al.  Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance , 2010 .

[14]  Fatima Benbouzid-Si Tayeb,et al.  Considering human resource constraints for real joint production and maintenance schedules , 2015, Comput. Ind. Eng..

[15]  Rubén Ruiz,et al.  TWO NEW ROBUST GENETIC ALGORITHMS FOR THE FLOWSHOP SCHEDULING PROBLEM , 2006 .

[16]  Hideo Tanaka,et al.  Genetic algorithms for flowshop scheduling problems , 1996 .

[17]  Subrata Mitra,et al.  Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times , 2014, Comput. Ind. Eng..

[18]  Dehua Xu,et al.  A note on "scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan" , 2009, Eur. J. Oper. Res..

[19]  Marcello Braglia,et al.  Harmony search algorithm for single-machine scheduling problem with planned maintenance , 2014, Comput. Ind. Eng..