A Fuzzy Genetic Algorithm for Single-Machine Scheduling and Flexible Maintenance Planning Integration under Human Resource Constraints
暂无分享,去创建一个
Fatima Benbouzid-Si Tayeb | Sabrina Bouzidi-Hassini | Belaid Benhamou | Meriem Touat | B. Benhamou | F. B. Tayeb | M. Touat | S. Bouzidi-Hassini
[1] Yeong-Dae Kim,et al. Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance , 2012, Comput. Oper. Res..
[2] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[3] Mostafa Zandieh,et al. Incorporating periodic preventive maintenance into flexible flowshop scheduling problems , 2011, Appl. Soft Comput..
[4] Christophe Varnier,et al. Single-machine scheduling with periodic and flexible periodic maintenance to minimize maximum tardiness , 2008, Comput. Ind. Eng..
[5] Chung-Yee Lee,et al. Single machine flow-time scheduling with scheduled maintenance , 1992, Acta Informatica.
[6] Reha Uzsoy,et al. Planning Production and Inventories in the Extended Enterprise , 2011 .
[7] Jen-Shiang Chen,et al. Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan , 2008, Eur. J. Oper. Res..
[8] Ghasem Moslehi,et al. Minimising the total completion time in a single machine scheduling problem under bimodal flexible periodic availability constraints , 2016, Int. J. Comput. Integr. Manuf..
[9] Sanja Petrovic,et al. Fuzzy Logic-Based Production Scheduling and Rescheduling in the Presence of Uncertainty , 2011 .
[10] Florica Luban,et al. Membership functions, some mathematical programming models and production scheduling , 1982 .
[11] Adam Kasperski,et al. On two single machine scheduling problems with fuzzy processing times and fuzzy due dates , 2003, Eur. J. Oper. Res..
[12] Shyi-Ming Chen. FUZZY SYSTEM RELIABILITY-ANALYSIS USING FUZZY NUMBER ARITHMETIC OPERATIONS (VOL 64, PG 31, 1994) , 1994 .
[13] Min Ji,et al. Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance , 2010 .
[14] Fatima Benbouzid-Si Tayeb,et al. Considering human resource constraints for real joint production and maintenance schedules , 2015, Comput. Ind. Eng..
[15] Rubén Ruiz,et al. TWO NEW ROBUST GENETIC ALGORITHMS FOR THE FLOWSHOP SCHEDULING PROBLEM , 2006 .
[16] Hideo Tanaka,et al. Genetic algorithms for flowshop scheduling problems , 1996 .
[17] Subrata Mitra,et al. Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times , 2014, Comput. Ind. Eng..
[18] Dehua Xu,et al. A note on "scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan" , 2009, Eur. J. Oper. Res..
[19] Marcello Braglia,et al. Harmony search algorithm for single-machine scheduling problem with planned maintenance , 2014, Comput. Ind. Eng..