Factors affecting the accuracy of cost estimate during various design stages
暂无分享,去创建一个
[1] Suzanne Wilkinson,et al. Risk impact assessments in project budget development: architects’ perspectives , 2016 .
[2] H. Murat Gunaydin,et al. A neural network approach for early cost estimation of structural systems of buildings , 2004 .
[3] Yean Yng Ling,et al. Improving the accuracy estimates of building of approximate projects , 2001 .
[4] Li Liu,et al. Improving Cost Estimates of Construction Projects Using Phased Cost Factors , 2007 .
[5] A. H. Boussabaine,et al. Critical determinants of construction tendering costs: Quantity surveyors’ standpoint , 2005 .
[6] Suzanne Wilkinson,et al. Why do the design stage elemental cost plan and final tender sum differ in New Zealand , 2015 .
[7] Novel Multi-shell Membrane Reactor for Efficient Dehydrogenation of Ethylbenzene , 2005 .
[8] John A. Gambatese,et al. Designer, Contractor, and Owner Views on the Topic of Design for Construction Worker Safety , 2012 .
[9] Dino Bouchlaghem. Architectural Engineering and Design Management: Sustainability Themed Issue , 2012 .
[10] Garold D. Oberlender,et al. Predicting accuracy of early cost estimates based on estimate quality , 2001 .
[11] Alfredo Serpell,et al. Towards a knowledge-based assessment of conceptual cost estimates , 2004 .
[12] Martin Skitmore,et al. Comparative analysis of pre-bid forecasting of building prices based on Singapore data , 1999 .
[13] Søren L. Buhl,et al. Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.
[14] Víctor Yepes,et al. Model for Systematic Innovation in Construction Companies , 2014 .
[15] Omar M. Shehatto. Cost Estimation for Building Construction Projects in Gaza Strip Using Artificial Neural Network (ANN) , 2013 .
[16] Patrick X.W. Zou,et al. Case Studies on Risk and Opportunity at Design Stage of Building Projects in Australia: Focus on Safety , 2008 .
[17] Farrukh Arif,et al. Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality , 2015 .
[18] Nicholas Chileshe,et al. An evaluation of risk factors impacting construction projects in Ghana , 2012 .
[19] Garold D. Oberlender,et al. Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .
[20] Munther Ahmed Ibraheem Abdal-hadi. Factors Affecting Accuracy of Pre-tender Cost Estimate in Gaza Strip , 2010 .
[21] Chung C. Fu,et al. Contingency estimation using a real options approach , 2009 .
[22] Akintola Akintoye,et al. Analysis of factors influencing project cost estimating practice , 2000 .
[23] Yu-Ren Wang,et al. Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models , 2012 .