Identifying key risks in infrastructure projects – Case study of Cairo Festival City project in Egypt
暂无分享,去创建一个
[1] Ahmed H. Ibrahim,et al. Management of construction cost contingency covering upside and downside risks , 2014 .
[2] Mostafa Khalifa,et al. Factors influencing sub-contractors selection in construction projects , 2013 .
[3] M. Badawy,et al. A Model for Evaluation of Delays in Construction Projects , 2016 .
[4] Mladen Radujković,et al. Risk Breakdown Structure for Construction Projects on Existing Buildings , 2014 .
[5] Albert P.C. Chan,et al. Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach , 2010 .
[6] Irem Dikmen,et al. Using fuzzy risk assessment to rate cost overrun risk in international construction projects , 2007 .
[7] Kumar Neeraj Jha,et al. Identification and evaluation of success factors for public construction projects , 2011 .
[8] Makarand Hastak,et al. Risk Factors Affecting Management and Maintenance Cost of Urban Infrastructure , 2001 .
[9] Ahmed N. Bdour,et al. Perspectives on sustainable wastewater treatment technologies and reuse options in the urban areas of the Mediterranean region , 2007 .
[10] J. P. Davies,et al. Factors influencing the structural deterioration and collapse of rigid sewer pipes , 2001 .
[11] Contribution of Risk Factors for Infrastructure Development of Nepal , 2017 .
[12] Bruce Cohen,et al. Productivity and efficiency in the water industry , 2009 .
[13] A. M. El-Kholy,et al. Predicting Cost Overrun in Construction Projects , 2015 .