Robust Corrective Topology Control for System Reliability

Corrective transmission switching schemes are an essential part of grid operations and are used to improve the reliability of the grid as well as the operational efficiency. Today, the transmission switching schemes are established based on the operator's past knowledge of the system as well as other ad-hoc methods. In this paper, three topology control (corrective transmission switching) methodologies are presented along with the detailed formulation of robust corrective switching. By incorporating robust optimization into the corrective switching framework, the switching solution is guaranteed to be feasible for a range of system operating states. The robust model can be solved offline to suggest switching actions that can be used in a dynamic security assessment tool in real-time. The proposed robust topology control algorithm can also generate multiple corrective switching actions for a particular contingency. The robust topology control formulation is tested on an IEEE 118-bus test case with different uncertainty sets.

[1]  R. Baldick,et al.  Dispatchable transmission in RTO markets , 2005, IEEE Transactions on Power Systems.

[2]  M. Ferris,et al.  Optimal Transmission Switching , 2008, IEEE Transactions on Power Systems.

[3]  Xu Andy Sun,et al.  Adaptive Robust Optimization for the Security Constrained Unit Commitment Problem , 2013, IEEE Transactions on Power Systems.

[4]  Laurent El Ghaoui,et al.  Robust Solutions to Uncertain Semidefinite Programs , 1998, SIAM J. Optim..

[5]  Mario Montagna,et al.  Optimal network reconfiguration for congestion management by deterministic and genetic algorithms , 2006 .

[6]  Kory W Hedman,et al.  Co-Optimization of Generation Unit Commitment and Transmission Switching With N-1 Reliability , 2010, IEEE Transactions on Power Systems.

[7]  R. Bacher,et al.  Loss reduction by network switching , 1988 .

[8]  Xiaochuan Luo,et al.  Corrective Line Switching With Security Constraints for the Base and Contingency Cases , 2013, IEEE Transactions on Power Systems.

[9]  Kory Hedman,et al.  Optimal transmission switching — Sensitivity analysis and extensions , 2009, 2009 IEEE Power & Energy Society General Meeting.

[10]  Minghai Liu,et al.  Generalized Line Outage Distribution Factors , 2007, IEEE Transactions on Power Systems.

[11]  R.P. O'Neill,et al.  Optimal Transmission Switching With Contingency Analysis , 2010, IEEE Transactions on Power Systems.

[12]  Aleksandr Rudkevich,et al.  Reduced MIP formulation for transmission topology control , 2012, 2012 50th Annual Allerton Conference on Communication, Control, and Computing (Allerton).

[13]  R. Bacher,et al.  Network Topology Optimization with Security Constraints , 1986, IEEE Power Engineering Review.

[14]  A. Cha,et al.  Fast Heuristics for Transmission-Line Switching , 2012, IEEE Transactions on Power Systems.

[15]  V. Vittal,et al.  Corrective switching algorithm for relieving overloads and voltage violations , 2005, IEEE Transactions on Power Systems.

[16]  A. G. Bakirtzis,et al.  Incorporation of Switching Operations in Power System Corrective Control Computations , 1987, IEEE Transactions on Power Systems.

[17]  H. Glavitsch,et al.  Security enhancement using an optimal switching power flow , 1989, Conference Papers Power Industry Computer Application Conference.

[18]  S. Oren,et al.  Smart Flexible Just-in-Time Transmission and Flowgate Bidding , 2011, IEEE Transactions on Power Systems.

[19]  Yongpei Guan,et al.  Two-Stage Robust Power Grid Optimization Problem , 2011 .

[20]  H. Glavitsch,et al.  Integrated security control using an optimal power flow and switching concepts , 1988 .

[21]  Aleksandr Rudkevich,et al.  On fast transmission topology control heuristics , 2011, 2011 IEEE Power and Energy Society General Meeting.

[22]  Kory W. Hedman,et al.  A review of transmission switching and network topology optimization , 2011, 2011 IEEE Power and Energy Society General Meeting.

[23]  Michael Ferris,et al.  Co-optimization of generation unit commitment and transmission switching with N-1 reliability , 2010, IEEE PES General Meeting.

[24]  S. Fliscounakis,et al.  Topology Influence on Loss Reduction as a Mixed Integer Linear Programming Problem , 2007, 2007 IEEE Lausanne Power Tech.

[25]  B. F. Wollenberg,et al.  Corrective Control of Power System Flows by Line and Bus-Bar Switching , 1986, IEEE Transactions on Power Systems.

[26]  Aleksandr Rudkevich,et al.  Economic and corrective applications of tractable transmission topology control , 2011, 2011 49th Annual Allerton Conference on Communication, Control, and Computing (Allerton).

[27]  Vijay Vittal,et al.  BIP-Based OPF for Line and Bus-bar Switching to Relieve Overloads and Voltage Violations , 2006, 2006 IEEE PES Power Systems Conference and Exposition.

[28]  Arkadi Nemirovski,et al.  Robust solutions of Linear Programming problems contaminated with uncertain data , 2000, Math. Program..