Impact of Personnel Flexibility on Job Shop Scheduling

Considering the lack of the research on the relationship between HR flexibility and scheduling effect, a resource-competency matrix-based method was proposed in order to reveal the quantitative relationship between them. Meanwhile, a job shop scheduling model with HR flexibility was established and the improved genetic algorithm was used to solve the model. A case analysis demonstrated significant impact of HR flexibility on the scheduling effect, which provided valuable guidance for building flexible manufacturing systems.

[1]  Yao Hao Multi-objective Dynamic Job-shop Scheduling Based on the Optimal Disposition of Man-machine Coordination , 2010 .

[2]  Masahiro Inuiguchi,et al.  Lagrangian relaxation with cut generation for hybrid flowshop scheduling problems to minimize the total weighted tardiness , 2010, Comput. Oper. Res..

[3]  Patrick De Causmaecker,et al.  Polynomially solvable personnel rostering problems , 2016, Eur. J. Oper. Res..

[4]  Li Cong-bo Mixed-skill worker assignment optimization model for assembly line , 2010 .

[5]  Quan-Ke Pan,et al.  Solving manpower scheduling problem in manufacturing using mixed-integer programming with a two-stage heuristic algorithm , 2010 .

[6]  Rubén Ruiz,et al.  The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..

[7]  Jiang Zeng-qiang Optimization configuration model of manufacturing plant operators based on competence index , 2011 .

[8]  Paola Zuddas,et al.  An optimization model for the short-term manpower planning problem in transhipment container terminals , 2016, Comput. Ind. Eng..

[9]  Albert Corominas,et al.  Balancing assembly line with skilled and unskilled workers , 2008 .

[10]  Zhang Zhiqiang Multi-mode Optimal Scheduling of Product Design Project Based on Person-task-resource Matching Degree , 2012 .

[11]  Zhao Ya-lin Personnel scheduling of flexible job-shop problem based on person-task matching degree , 2015 .

[12]  Colin N. Jones,et al.  A two-stage stochastic programming approach to employee scheduling in retail outlets with uncertain demand , 2015 .

[13]  Sun Yu,Xu Ke-lin,Qin Wei Risk Assessment of Project Contractors Based on Generalized Regression Neural Network , 2011 .

[14]  Carlos Andrés,et al.  Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled , 2008, Discret. Appl. Math..

[15]  Zhang Bi-xi,Zhang Wan-li,Song Jing Ant Colony-Based Labor Allocation Method for Small-and-Medium-Size Manufacturing Workshops , 2011 .