Delay Management Including Capacities of Stations

The question of delay management is whether passenger trains should wait for delayed feeder trains or should depart on time. Solutions to this problem strongly depend on the available capacity of the railway infrastructure. Although the limited capacity of the tracks has been considered in delay management models, the limited capacity of the stations has been neglected so far. In this paper, we develop a model for the delay management problem that includes the capacities of the stations. This model allows rescheduling the platform track assignment. Furthermore, we propose an iterative heuristic in which we first solve the delay management model with a fixed platform track assignment, and then improve this platform track assignment in each step. We show that the latter problem can be solved in polynomial time by describing it as a minimum cost flow model. Finally, we present an extension of the model that balances the delay of the passengers on one hand and the number of changes in the platform track assignment on the other. All models are evaluated on real-world instances from Netherlands Railways.

[1]  Esther M. Arkin,et al.  Scheduling jobs with fixed start and end times , 1987, Discret. Appl. Math..

[2]  Erhan Kozan,et al.  A disjunctive graph model and framework for constructing new train schedules , 2010, Eur. J. Oper. Res..

[3]  Dennis Huisman,et al.  Fast heuristics for delay management with passenger rerouting , 2011, Public Transp..

[4]  Matthias Ehrgott,et al.  Railway track allocation: models and methods , 2011, OR Spectr..

[5]  Dario Pacciarelli,et al.  Discrete Optimization A branch and bound algorithm for scheduling trains in a railway network , 2007 .

[6]  Ralf Borndörfer,et al.  Discrete Optimization in Public Transportation , 2009 .

[7]  Anita Schöbel,et al.  Optimization in Public Transportation - Stop Location, Delay Management and Tariff Zone Design in a Public Transportation Network , 2006, Optimization and its applications.

[8]  Sebastian Stiller,et al.  Online railway delay management: Hardness, simulation and computation , 2011, Simul..

[9]  Michael Gatto,et al.  On the Impact of Uncertainty on some Optimization Problems: Combinatorial Aspects of Delay Management and Robust Online Scheduling , 2007 .

[10]  Marco Lüthi,et al.  Improving the efficiency of heavily used railway networks through integrated real-time rescheduling , 2009 .

[11]  Marco Laumanns,et al.  A New Resource-Constrained Multicommodity Flow Model for Conflict-Free Train Routing and Scheduling , 2011, Transp. Sci..

[12]  Leon Peeters,et al.  The Computational Complexity of Delay Management , 2005, WG.

[13]  Anita Schöbel,et al.  To Wait or Not to Wait - And Who Goes First? Delay Management with Priority Decisions , 2010, Transp. Sci..

[14]  Dario Pacciarelli,et al.  A tabu search algorithm for rerouting trains during rail operations , 2007 .

[15]  Anita Schöbel,et al.  To Wait or Not to Wait? The Bicriteria Delay Management Problem in Public Transportation , 2007, Transp. Sci..

[16]  Martine Labbé,et al.  Optimization models for the single delay management problem in public transportation , 2008, Eur. J. Oper. Res..

[17]  Twan Dollevoet,et al.  Delay Management Including Capacities of Stations , 2012, Transp. Sci..

[18]  Peter Widmayer,et al.  Online Delay Management on a Single Train Line , 2004, ATMOS.

[19]  Leena Suhl,et al.  A note on the online nature of the railway delay management problem , 2011, Networks.

[20]  Leo Kroon,et al.  Routing trains through railway stations: complexity issues , 1997 .

[21]  A. Kuckelberg,et al.  Real-Time Asynchronous Conflict Solving Algorithms for Computer Aided Train Dispatching Assistance Systems , 2008 .

[22]  Anita Schöbel,et al.  Integer Programming Approaches for Solving the Delay Management Problem , 2004, ATMOS.

[23]  Sven Oliver Krumke,et al.  Extensions to online delay management on a single train line: new bounds for delay minimization and profit maximization , 2011, Math. Methods Oper. Res..

[24]  Leo G. Kroon,et al.  Routing trains through a railway station based on a node packing model , 2001, Eur. J. Oper. Res..

[25]  Matthias Ehrgott,et al.  Routing Trains Through Railway Junctions: A New Set-Packing Approach , 2011, Transp. Sci..

[26]  Anita Schöbel,et al.  Capacity constraints in delay management , 2009, Public Transp..

[27]  Paolo Toth,et al.  Solution of the Train Platforming Problem , 2011, Transp. Sci..

[28]  Dennis Huisman,et al.  Delay Management with Rerouting of Passengers , 2012, Transp. Sci..

[29]  Michael Schachtebeck,et al.  Delay Management in Public Transportation: Capacities, Robustness, and Integration , 2010 .

[30]  Anita Schöbel,et al.  A Model for the Delay Management Problem based on Mixed-Integer-Programming , 2001, ATMOS.

[31]  C. Conte,et al.  Identifying dependencies among delays , 2008 .

[32]  Matthias Ehrgott,et al.  Multicriteria Optimization , 2005 .

[33]  Paolo Toth,et al.  Delay-Robust Event Scheduling , 2014, Oper. Res..

[34]  Dennis Huisman,et al.  An iterative optimization framework for delay management and train scheduling , 2012 .

[35]  Dario Pacciarelli,et al.  Bi-objective conflict detection and resolution in railway traffic management , 2012 .

[36]  Leo Kroon,et al.  On the computational complexity of (maximum) class scheduling , 1991 .

[37]  Leo G. Kroon,et al.  The Optimal Cost Chromatic Partition Problem for Trees and Interval Graphs , 1996, WG.

[38]  Dario Pacciarelli,et al.  Job-shop scheduling with blocking and no-wait constraints , 2002, Eur. J. Oper. Res..