Active feedback control of unstable wells at the brage field
暂无分享,去创建一个
[1] S. V. Larsen,et al. Brage Field, Lessons Learned After 5 Years of Production , 1998 .
[2] Kjetil Havre,et al. Automatic Control of Unstable Gas Lifted Wells , 1999 .
[3] Pierre Lemetayer,et al. New Field Methods for a Maximum Lift Gas Efficiency Through Stability , 1996 .
[4] P. Lemetayer,et al. Tool of the 90's To Optimize Gas-Lift Efficiency in the Gonelle Field, Gabon , 1991 .
[5] Kietil Havre,et al. Taming slug flow in pipelines , 2000 .
[6] Kjetil Havre,et al. Active Feedback Control as the Solution to Severe Slugging , 2001 .
[7] T. Sælensminde,et al. Water Management in a Closed Loop - Problems and Solutions at Brage Field , 2000 .
[8] Eric Heintze,et al. Simulation of Process to Control Severe Slugging: Application to the Dunbar Pipeline , 1999 .
[9] A. Courbot. Prevention of Severe Slugging in the Dunbar 16' Multiphase Pipeline , 1996 .