A head-to-head comparative study of the conditional performance of control charts based on estimated parameters

ABSTRACT Implementation of the Shewhart, CUSUM, and EWMA charts requires estimates of the in-control process parameters. Many researchers have shown that estimation error strongly influences the performance of these charts. However, a given amount of estimation error may differ in effect across charts. Therefore, we perform a pairwise comparison of the effect of estimation error across these charts. We conclude that the Shewhart chart is more strongly affected by estimation error than the CUSUM and EWMA charts. Furthermore, we show that the general belief that the CUSUM and EWMA charts have similar performance no longer holds under estimated parameters.

[1]  William H. Woodall,et al.  Performance Metrics for Surveillance Schemes , 2008 .

[2]  Ronald J. M. M. Does,et al.  A Robust Estimator for Location in Phase I Based on an EWMA Chart , 2014 .

[3]  R. F.,et al.  Statistical Method from the Viewpoint of Quality Control , 1940, Nature.

[4]  Eugenio K. Epprecht,et al.  Estimating the Standard Deviation in Quality-Control Applications , 2010 .

[5]  Philippe Castagliola,et al.  Some Recent Developments on the Effects of Parameter Estimation on Control Charts , 2014, Qual. Reliab. Eng. Int..

[6]  Fred Spiring,et al.  Introduction to Statistical Quality Control , 2007, Technometrics.

[7]  Axel Gandy,et al.  Guaranteed Conditional Performance of Control Charts via Bootstrap Methods , 2011, 1111.4180.

[8]  Ronald J. M. M. Does,et al.  Guaranteed In-Control Performance for the Shewhart X and X Control Charts , 2017 .

[9]  William H. Woodall,et al.  Bridging the gap between theory and practice in basic statistical process monitoring , 2016 .

[10]  Marianne Frisén,et al.  Statistical Surveillance. Optimality and Methods , 2003 .

[11]  Charles W. Champ,et al.  Effects of Parameter Estimation on Control Chart Properties: A Literature Review , 2006 .

[12]  William H. Woodall,et al.  Another Look at the EWMA Control Chart with Estimated Parameters , 2015 .

[13]  James M. Lucas,et al.  Exponentially weighted moving average control schemes: Properties and enhancements , 1990 .

[14]  Ron S. Kenett,et al.  On Assessing the Performance of Sequential Procedures for Detecting a Change , 2012, Qual. Reliab. Eng. Int..

[15]  Douglas M. Hawkins,et al.  The CUSUM and the EWMA Head-to-Head , 2014 .

[16]  William H. Woodall,et al.  CUSUM charts with controlled conditional performance under estimated parameters , 2016 .

[17]  Stefan H. Steiner Exponentially Weighted Moving Average Control Charts with Time-Varying Control Limits and Fast Initial Response , 1998 .

[18]  Charles W. Champ,et al.  The Performance of Exponentially Weighted Moving Average Charts With Estimated Parameters , 2001, Technometrics.

[19]  Muhammad Riaz,et al.  Robust CUSUM Control Charting , 2013 .

[20]  William H. Woodall,et al.  The Difficulty in Designing Shewhart X̄ and X Control Charts with Estimated Parameters , 2015 .

[21]  Stefan H. Steiner,et al.  An Overview of Phase I Analysis for Process Improvement and Monitoring , 2014 .

[22]  Muhammad Riaz,et al.  Robust Location Estimators for the Ū Control Chart , 2011 .

[23]  S. Steiner EWMA Control Charts with Time-Varying Control Limits and Fast Initial Response , 1999 .