Capacity acquisition for the single-item lot sizing problem under energy constraints
暂无分享,去创建一个
Bernard Penz | Céline Gicquel | Christophe Rapine | Ayse Akbalik | B. Penz | A. Akbalik | C. Gicquel | Christophe Rapine
[1] Frieder Borggrefe,et al. The potential of demand-side management in energy-intensive industries for electricity markets in Germany , 2011 .
[2] Ignacio E. Grossmann,et al. Optimal production planning under time-sensitive electricity prices for continuous power-intensive processes , 2012, Comput. Chem. Eng..
[3] Iiro Harjunkoski,et al. Resource–Task Network Formulations for Industrial Demand Side Management of a Steel Plant , 2013 .
[4] Markus Heck,et al. Lot-Size Planning with Non-Linear Cost Functions Supporting Environmental Sustainability , 2010, Int. J. Green Comput..
[5] Monique Guignard-Spielberg,et al. Dynamic Production Scheduling for a Process Industry , 1994, Oper. Res..
[6] Helene Lidestam,et al. Including energy in supply chain planning at a pulp company , 2013 .
[7] Tadeusz Sawik,et al. Coordinated supply chain scheduling , 2009 .
[8] Raf Jans,et al. An industrial extension of the discrete lot-sizing and scheduling problem , 2004 .
[9] Lixin Tang,et al. A stochastic production planning problem with nonlinear cost , 2012, Comput. Oper. Res..
[10] Hongyan Li,et al. Capacitated dynamic lot sizing with capacity acquisition , 2011 .
[11] Zeger Degraeve,et al. Modeling industrial lot sizing problems: a review , 2008 .
[12] Pierluigi Siano,et al. A survey of industrial applications of Demand Response , 2016 .
[13] Linet Özdamar,et al. A hierarchical planning system for energy intensive production environments , 1999 .
[14] A. Yalaoui,et al. Lot-sizing in a multi-stage flow line production system with energy consideration , 2017, Int. J. Prod. Res..
[15] Axel Tuma,et al. Energy-efficient scheduling in manufacturing companies: A review and research framework , 2016, Eur. J. Oper. Res..
[16] Harvey M. Wagner,et al. Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..
[17] Konstantinos Salonitis,et al. Forty Sixth CIRP Conference on Manufacturing Systems 2013 Energy efficient manufacturing from machine tools to manufacturing systems , 2013 .
[18] Pierre Lopez,et al. The energy scheduling problem: Industrial case-study and constraint propagation techniques , 2013 .
[19] Rakesh Nagi,et al. Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs , 2005, Comput. Oper. Res..
[20] Alper Atamtürk,et al. Capacity Acquisition, Subcontracting, and Lot Sizing , 2001, Manag. Sci..
[21] Waldemar Kaczmarczyk. Proportional lot-sizing and scheduling problem with identical parallel machines , 2011 .
[22] Fabrizio Marinelli,et al. Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company , 2007, Ann. Oper. Res..
[23] Gunther Reinhart,et al. An Approach for Energy-oriented Production Control Using Energy Flexibility , 2015 .
[24] Albert Corominas,et al. A review of mathematical programming models for strategic capacity planning in manufacturing , 2014 .
[25] Gang Rong,et al. Production planning optimization of an ethylene plant considering process operation and energy utilization , 2016, Comput. Chem. Eng..
[26] Laurence A. Wolsey,et al. Production Planning by Mixed Integer Programming , 2010 .
[27] Stéphane Dauzère-Pérès,et al. Single item lot sizing problems , 2006, Eur. J. Oper. Res..
[28] Bernardo Almada-Lobo,et al. Integrated pulp and paper mill planning and scheduling , 2012, Comput. Ind. Eng..
[29] Leon S. Lasdon,et al. An Efficient Algorithm for Multi-Item Scheduling , 1971, Oper. Res..
[30] Konstantin Biel,et al. Systematic literature review of decision support models for energy-efficient production planning , 2016, Comput. Ind. Eng..
[31] Massimo Paolucci,et al. Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops , 2012 .
[32] J. K. Lenstra,et al. Deterministic Production Planning: Algorithms and Complexity , 1980 .
[33] G. Bitran,et al. Computational Complexity of the Capacitated Lot Size Problem , 1982 .
[34] Anand Sivasubramaniam,et al. Managing server energy and operational costs in hosting centers , 2005, SIGMETRICS '05.
[35] Diego Klabjan,et al. Multiple machine continuous setup lotsizing with sequence-dependent setups , 2010, Comput. Optim. Appl..
[36] Uday S. Karmarkar,et al. The Deterministic Dynamic Product Cycling Problem , 1985, Oper. Res..
[37] Isi Mitrani. Managing performance and power consumption in a server farm , 2013, Ann. Oper. Res..