Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2

Underground subways are constructed in major cities across China to overcome the transportation problems in the urbanization process. The aim is to develop a comprehensive risk checklist associated with subway projects and a methodology to assess the risks at the early stage of a project. Based on the analysis of accidents that have happened in previous projects, a review of current literature and the results of interviews, a comprehensive risk checklist was developed, followed by proposing a risk analysis methodology using fuzzy analytical hierarchy process (AHP). Then the Nanjing Subway Line 2 project was analysed using the proposed risk checklist and fuzzy AHP method. The data were obtained through interviews and two rounds of questionnaire surveys with the personnel directly involved in the Nanjing Subway Line 2 project. The results of risk identification and assessment are presented and their managerial implications are discussed. The information presented here should be relevant to both academics and practitioners in the field of subway project management.

[1]  Hu Guang-yun The Risk Management in Subway Construction , 2012 .

[2]  Huang Hong Risk Assessment on Shanghai Yangtze River Tunnel , 2009 .

[3]  Zhongsheng Hua,et al.  On the extent analysis method for fuzzy AHP and its applications , 2008, Eur. J. Oper. Res..

[4]  Huang Hong-wei Safe Evacuation during Fire in Big and Long Tunnel Based on Risk Analysis , 2008 .

[5]  Huang Hong-wei,et al.  Analysis on the Current Situation of Risk Management on Metro Operation Safety , 2008 .

[6]  Jongwon Seo,et al.  Risk-Based Safety Impact Assessment Methodology for Underground Construction Projects in Korea , 2008 .

[7]  Patrick X.W. Zou,et al.  Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China , 2007 .

[8]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .

[9]  Sunan Huang,et al.  Railway risk assessment - the fuzzy reasoning approach and fuzzy analytic hierarchy process approaches: A case study of shunting at Waterloo depot , 2007 .

[10]  Zhongsheng Hua,et al.  A modified fuzzy logarithmic least squares method for fuzzy analytic hierarchy process , 2006, Fuzzy Sets Syst..

[11]  Huang Hong-wei State-of-the-Art of the Research on Risk Management in Construction of Tunnel and Underground Works , 2006 .

[12]  Huang Hong-wei Risk Management in the Construction of Deep Excavation Engineering , 2005 .

[13]  Sid Ghosh,et al.  Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach , 2004 .

[14]  J Brown,et al.  Management and control of cost and risk for tunneling and infrastructure projects , 2004 .

[15]  Per Tengborg,et al.  Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2 , 2004 .

[16]  Hyo-Nam Cho,et al.  Risk Assessment Methodology for Underground Construction Projects , 2004 .

[17]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[18]  Standards New Zealand.,et al.  Risk management guidelines: companion to AS/NZS 4360:2004 , 2004 .

[19]  R. Gorur,et al.  The application of analytical hierarchy process to analyze the impact of hidden failures in special protection schemes , 2003 .

[20]  Ray Sterling,et al.  RISK BUDGET MANAGEMENT IN PROGRESSING UNDERGROUND WORKS. INTERNATIONAL SOCIETY FOR TRENCHLESS TECHNOLOGY (ISTT) AND INTERNATIONAL TUNNELLING ASSOCIATION (ITA) JOINT WORKING GROUP REPORT , 2003 .

[21]  Gd Wood,et al.  Risk management practices of leading UK cost consultants , 2003 .

[22]  王 午正,et al.  铁道与城市轨道交通工程 = Reilway and urban rail transit engineering , 2003 .

[23]  Felix Schmid,et al.  An introduction to China's rail transport Part 2: Urban rail transit systems, highway transport and the reform of China's railways , 2002 .

[24]  Hepu Deng,et al.  Multicriteria analysis with fuzzy pairwise comparison , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[25]  J. Buckley,et al.  Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[26]  Nigel J. Smith,et al.  Managing Risk in Construction Projects , 1998 .

[27]  D. Chang Applications of the extent analysis method on fuzzy AHP , 1996 .

[28]  Terry Williams,et al.  The two-dimensionality of project risk , 1996 .

[29]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[30]  Hebert H Einstein,et al.  RISK ANALYSIS FOR THE ADLER TUNNEL , 1994 .

[31]  Caroline M. Eastman,et al.  Review: Introduction to fuzzy arithmetic: Theory and applications : Arnold Kaufmann and Madan M. Gupta, Van Nostrand Reinhold, New York, 1985 , 1987, Int. J. Approx. Reason..

[32]  Y. Ku,et al.  Introduction to fuzzy arithmetic—theory and applications : Arnold Kaufmann and Madan M. Gupta. 351 pages, diagrams, figures. Van Nostrand Reinhold Company, New York, 1985. , 1986 .

[33]  S. Chanas The use of parametric programming in fuzzy linear programming , 1983 .

[34]  W. Pedrycz,et al.  A fuzzy extension of Saaty's priority theory , 1983 .

[35]  Salazar Ledezma,et al.  Stochastic and economic evaluation of adaptability in tunneling design and construction , 1983 .

[36]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[37]  F. R. G. Heaf,et al.  Management and Control , 1951 .