Multi-Criteria Multi-Modal Fuzzy Project Scheduling in Construction Industry
暂无分享,去创建一个
[1] Kevin F. R. Liu,et al. Decision-support for environmental impact assessment: A hybrid approach using fuzzy logic and fuzzy analytic network process , 2009, Expert Syst. Appl..
[2] Yimin Zhu,et al. An LCA-based environmental impact assessment model for construction processes , 2010 .
[3] Abbas Afshar,et al. Fuzzy-based MOGA approach to stochastic time-cost trade-off problem , 2009 .
[4] Jiuping Xu,et al. Fuzzy-Like Multiple Objective Decision Making , 2011, Studies in Fuzziness and Soft Computing.
[5] M. Ammar. Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows , 2011 .
[6] Heinz Schelle,et al. Dimensions of Project Management , 1990 .
[7] Jiuping Xu,et al. Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project , 2012 .
[8] Zbigniew Michalewicz,et al. Genetic Algorithms + Data Structures = Evolution Programs , 1996, Springer Berlin Heidelberg.
[9] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[10] Didier Dubois,et al. Possibility Theory - An Approach to Computerized Processing of Uncertainty , 1988 .
[11] Jan Węglarz,et al. Project scheduling : recent models, algorithms, and applications , 1999 .
[12] Prabuddha De,et al. The discrete time-cost tradeoff problem revisited , 1995 .
[13] Sou-Sen Leu,et al. A GA-based fuzzy optimal model for construction time-cost trade-off , 2001 .
[14] Jiuping Xu,et al. A discrete time optimal control model with uncertainty for dynamic machine allocation problem and its application to manufacturing and construction industries , 2012 .
[15] Eleni Hadjiconstantinou,et al. A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations , 2010, Comput. Oper. Res..
[16] Tien-Fu Liang,et al. Applying fuzzy goal programming to project management decisions with multiple goals in uncertain environments , 2010, Expert Syst. Appl..
[17] Mitsuo Gen,et al. Network Models and Optimization: Multiobjective Genetic Algorithm Approach , 2008 .
[18] John F. Muth,et al. A Dynamic Programming Algorithm for Decision CPM Networks , 1979, Oper. Res..
[19] A. Brismar,et al. Attention to impact pathways in EISs of large dam projects , 2004 .
[20] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[21] Ario Ohsato,et al. Fuzzy critical chain method for project scheduling under resource constraints and uncertainty , 2008 .
[22] S. Selçuk Erengüç,et al. The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure , 1998, Eur. J. Oper. Res..
[23] Wang Cheng-en,et al. A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution , 2009 .
[24] Bin Chen,et al. The cumulative effects of dam project on river ecosystem based on multi-scale ecological network analysis , 2011 .
[25] Jairo R. Montoya-Torres,et al. Project scheduling with limited resources using a genetic algorithm , 2010 .
[26] Roberto Peche,et al. Environmental impact assessment procedure: A new approach based on fuzzy logic , 2009 .
[27] Mohamed Haouari,et al. A bi-objective model for robust resource-constrained project scheduling , 2005 .
[28] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[29] Hamed R. Tareghian,et al. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search , 2007, Appl. Math. Comput..
[30] Can Akkan,et al. Network decomposition-based benchmark results for the discrete time-cost tradeoff problem , 2005, Eur. J. Oper. Res..
[31] Chung-Wei Feng,et al. Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method , 1995 .
[32] Che-Ming Chiang,et al. A study on the comprehensive indicator of indoor environment assessment for occupants’ health in Taiwan , 2002 .
[33] Anastasia Pagnoni,et al. Project Engineering: Computer-Oriented Planning and Operational Decision Making , 1990 .
[34] Gerhard J. Woeginger,et al. Hardness of approximation of the discrete time-cost tradeoff problem , 2001, Oper. Res. Lett..
[35] Grace K C Ding,et al. Sustainable construction--the role of environmental assessment tools. , 2008, Journal of environmental management.
[36] Low Sui Pheng,et al. Environmental factors and work performance of project managers in the construction industry , 2006 .
[37] Jiuping Xu,et al. A review on Ecological Engineering based Engineering Management , 2012 .
[38] Erik Demeulemeester,et al. Optimal procedures for the discrete time/cost trade-off problem in project networks , 1996 .
[39] Prabuddha De,et al. Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks , 1997, Oper. Res..
[40] Lotfi A. Zadeh,et al. Fuzzy Sets , 1996, Inf. Control..
[41] Nuria Forcada,et al. A methodology for predicting the severity of environmental impacts related to the construction process of residential buildings , 2009 .
[42] Erik Demeulemeester,et al. Project scheduling : a research handbook , 2002 .