Application of value stream mapping (VSM) for lean and cycle time reduction in complex production environments: a case study

Abstract The application of VSM is a proven approach for lean-based improvements. Typically, this becomes challenging, when applied for complex production environments. The purpose of this research is to demonstrate, how with some approximations and simplifications in VSM application, lean can be successfully achieved in these environments. The research follows case study method and systematically guides about the segregation and treatment of non-value-adding(NVA) and value-adding (VA) activities of heavy-duty industrial power transformer making process. The focal company operates in engineer to order (ETO) and high-mix low-volume (HMLV) environments. With a research team using gemba walks and systematic questioning technique, relevant data were collected for mapping. Taguchi method was also applied for one of the critical steps, which was influencing cycle time and energy requirements. The generalisable findings endorse the strengths of approach for lean by addressing wastes and cycle time reduction. The study establishes that VSM application-based lean messages remain same for both simple and complex environments. It also exposes that non-compliance of ‘VSM assumptions’ and ‘micro-concepts’ are the root causes for application complexities. The study also offers useful insights and practical guidelines to facilitate lean in ETO, construction and HMLV production environments.

[1]  Dinesh Seth,et al.  Critical success factors for Lean Six Sigma in SMEs (small and medium enterprises) , 2016 .

[2]  Nick Rich,et al.  The seven value stream mapping tools , 1997 .

[3]  John K. Gershenson,et al.  Classification scheme for lean manufacturing tools , 2003 .

[4]  Madhan Shridhar Phadke,et al.  Quality Engineering Using Robust Design , 1989 .

[5]  Paolo Trucco,et al.  Understanding dynamism and complexity factors in engineer-to-order and their influence on lean implementation strategy , 2016 .

[6]  Tomaso Poggio,et al.  Learning to see , 1996 .

[7]  Rambabu Kodali,et al.  Lean production: literature review and trends , 2015 .

[8]  新郷 重夫,et al.  A study of the Toyota production system from an industrial engineering viewpoint , 1989 .

[9]  Suresh Garg,et al.  Value stream mapping: literature review and implications for Indian industry , 2011 .

[10]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[11]  A. Bernard,et al.  Value network modelling and simulation for strategic analysis: a discrete event simulation approach , 2014 .

[12]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[13]  Computer Staff,et al.  The Machine That Changed the World , 1992 .

[14]  D. Tripathi,et al.  A critical study of TQM and TPM approaches on business performance of Indian manufacturing industry , 2006 .

[15]  Jim Todd,et al.  World-Class Manufacturing , 1996 .

[16]  Juan Manuel Araya Value Stream Mapping Adapted to High-Mix, Low-Volume Manufacturing Environments , 2012 .

[17]  Mikell P. Groover,et al.  Work systems and the methods, measurement, and management of work , 2006 .

[18]  Marcello Braglia,et al.  Uncertainty in value stream mapping analysis , 2009 .

[19]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[20]  William Faulkner,et al.  Sustainable Value Stream Mapping (Sus-VSM): methodology to visualize and assess manufacturing sustainability performance , 2014 .

[21]  Dinesh Seth,et al.  Application and evaluation of packaging postponement strategy to boost supply chain responsiveness: a case study , 2015 .

[22]  Subhash C. Rastogi,et al.  Global Management Solutions - Demystified , 2009 .

[23]  Nitin Seth,et al.  Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context , 2008 .

[24]  Svetan Ratchev,et al.  Development of a multi-product cost and value stream modelling methodology , 2012 .

[25]  Sylwia Męcfal Recenzja książki. Robert K. yin, Case Study Research. Design and Methods (fourth Edition), thousand Oaks, CA: Sage Publications, 2009 , 2012 .

[26]  R. M. Chitturi,et al.  VALUE STREAM MAPPING IN A JOBSHOP , 2007 .

[27]  John K. Gershenson,et al.  The Application of Value Stream Mapping to Lean Engineering , 2004 .

[28]  Jirachai Buddhakulsomsiri,et al.  Production efficiency improvement in batch production system using value stream mapping and simulation: a case study of the roasted and ground coffee industry , 2014 .

[29]  Li-Ren Yang Key practices, manufacturing capability and attainment of manufacturing goals: The perspective of project/engineer-to-order manufacturing , 2013 .

[30]  Luis Felipe Romero Dessens,et al.  Use of Value Mapping Tools for Manufacturing Systems Redesign , 2012 .

[31]  Hugh McManus Product Development Value Stream Mapping (PDVSM) Manual Release 1.0 , 2005 .

[32]  A. Deifa,et al.  Assessing Lean Systems Using Variability Mapping , 2012 .

[33]  C Peter,et al.  Value Stream Management , 2011 .

[34]  Marcello Braglia,et al.  A new value stream mapping approach for complex production systems , 2006 .

[35]  Christoph Herrmann,et al.  Economic and environmental value stream map (E2VSM) simulation for multi-product manufacturing systems , 2016 .

[36]  Kwabena Agyapong-Kodua,et al.  Multi-product cost and value stream modelling: in support of business process analysis , 2010 .

[37]  Erlend Alfnes,et al.  A New Value Stream Mapping Approach for Engineer-to-Order Production Systems , 2015, APMS.

[38]  L. Ellram THE USE OF THE CASE STUDY METHOD IN LOGISTICS RESEARCH , 1996 .

[39]  Pranav Phadtare Lean Production: Literature Review , 2014 .

[40]  Iris D. Tommelein,et al.  Value stream analysis of a re-engineered construction supply chain , 2003 .

[41]  Abdulsalam A. Al-Sudairi Evaluating the effect of construction process characteristics to the applicability of lean principles , 2007 .

[42]  Rui M. Sousa,et al.  Waste identification diagrams , 2014 .

[43]  Chris Butterworth,et al.  Value Stream Management , 1998 .

[44]  Antonio Freitas Rentes,et al.  A new value stream mapping approach for healthcare environments , 2016 .

[45]  A. Woodside Building Theory from Case Study Research , 2016 .

[46]  Iris D. Tommelein,et al.  Value Stream Mapping for Make-to-Order Products in a Job Shop Environment , 2005 .

[47]  Marcello Braglia,et al.  Extending value stream mapping: the synchro-MRP case , 2013 .

[48]  D. Seth,et al.  A multiple-item inventory model for a non-stationary demand , 2009 .

[49]  Jan Olhager,et al.  Strategic positioning of the order penetration point , 2003 .

[50]  Christopher A. Voss,et al.  Case research in operations management , 2002 .

[51]  Sue Newell,et al.  Critical Success Factors , 2005, ICEIS.

[52]  P. Hines,et al.  Learning to evolve: A review of contemporary lean thinking , 2004 .

[53]  Sanjay Bhasin Lean Management Beyond Manufacturing , 2015 .

[54]  D. Schmidtke,et al.  A simulation-enhanced value stream mapping approach for optimisation of complex production environments , 2014 .

[55]  Joshua Prakash,et al.  Comparison between production controls in multi-stage multi-product manufacturing environments: two case studies , 2014 .

[56]  Joseph G. Voelkel,et al.  Value stream mapping , 2020, BASICS: Be Always Sure Inputs Create Success.

[57]  Shahrukh A. Irani,et al.  Value Network Mapping (VNM): Visualization and Analysis of Multiple Flows in Value Stream Maps , 2001 .

[58]  D. T. Matt,et al.  Adaptation of the value stream mapping approach to the design of lean engineer-to-order production systems: A case study , 2014 .

[59]  A. Posner Learning to see. , 1955, Eye, ear, nose & throat monthly.

[60]  A. F. Rentes,et al.  Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application , 2002 .

[61]  Jay Jina,et al.  Applying lean principles for high product variety and low volumes: some issues and propositions , 1997 .

[62]  Rodolfo de Castro,et al.  Evaluation of value stream mapping in manufacturing system redesign , 2008 .

[63]  M. Naim,et al.  Engineer-to-order supply chain management: A literature review and research agenda , 2009 .

[64]  R. L. Shrivastava,et al.  Impact of green manufacturing practices on organisational performance in Indian context: An empirical study , 2016 .

[65]  Rachna Shah,et al.  Defining and developing measures of lean production , 2007 .

[66]  R. P. Mohanty,et al.  Quality Dimensions of E-Commerce and their Implications , 2007 .

[67]  S. Vinodh,et al.  Implementing lean sigma in an Indian rotary switches manufacturing organisation , 2014 .

[68]  Fernando Antonio Forcellini,et al.  Value Stream Mapping: a study about the problems and challenges found in the literature from the past 15 years about application of Lean tools , 2014, The International Journal of Advanced Manufacturing Technology.

[69]  Kevin J. Duggan,et al.  Creating Mixed Model Value Streams: Practical Lean Techniques for Building to Demand, Second Edition , 2012 .

[70]  Richard Craig Van Nostrand,et al.  Design of Experiments Using the Taguchi Approach: 16 Steps to Product and Process Improvement , 2002, Technometrics.

[71]  Vaibhav Gupta,et al.  Application of value stream mapping for lean operations and cycle time reduction: an Indian case study , 2005 .

[72]  Christine Nadel,et al.  Case Study Research Design And Methods , 2016 .

[73]  Xianming Cai,et al.  Value stream mapping to reduce the lead-time of a product development process , 2015 .