ELECTROMAGNETISM-LIKE ALGORITHM FOR FUZZY FLOW SHOP BATCH PROCESSING MACHINES SCHEDULING TO MINIMIZE TOTAL WEIGHTED EARLINESS AND TARDINESS
暂无分享,去创建一个
R Tavakkoli Moghaddam | F. Hosseinzadeh Lotfi | S Molla Alizadeh Zavardehi | F. Lotfi | R. Moghaddam | S. M. Zavardehi
[1] Frank Werner,et al. A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size , 1999 .
[2] R. Saneifard. A METHOD FOR DEFUZZIFICATION BY WEIGHTED DISTANCE , 2009 .
[3] Kai Li,et al. SCHEDULING A SINGLE BATCH-PROCESSING MACHINE WITH NON-IDENTICAL JOB SIZES IN FUZZY ENVIRONMENT USING AN IMPROVED ANT COLONY OPTIMIZATION , 2010 .
[4] R. Saneifard,et al. A new parametric method for ranking fuzzy numbers based on positive and negative ideal solutions , 2013 .
[5] Paolo Toth,et al. An electromagnetism metaheuristic for the unicost set covering problem , 2010, Eur. J. Oper. Res..
[6] Tao Wang,et al. An effective neighborhood search algorithm for scheduling a flow shop of batch processing machines , 2011, Comput. Ind. Eng..
[7] Kudret Demirli,et al. Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines , 2009, Int. J. Approx. Reason..
[8] Reza Tavakkoli-Moghaddam,et al. A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total weighted tardiness , 2009, Soft Comput..
[9] Hiroaki Ishii,et al. Single Machine Batch Scheduling Problem with Resource Dependent Setup and Processing Time in the Presence of Fuzzy Due Date , 2005, Fuzzy Optim. Decis. Mak..
[10] R. Saneifard. RANKING L-R FUZZY NUMBERS WITH WEIGHTED AVERAGING BASED ON LEVELS , 2009 .
[11] A. Jafarian,et al. Utilizing a new feed-back fuzzy neural network for solving a system of fuzzy equations , 2013 .
[12] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[13] Ali Husseinzadeh Kashan,et al. An improved mixed integer linear formulation and lower bounds for minimizing makespan on a flow shop with batch processing machines , 2008 .
[14] Jozef Kratica,et al. An electromagnetism-like metaheuristic for the uncapacitated multiple allocation p-hub median problem , 2013, Comput. Ind. Eng..
[15] Chao-Ton Su,et al. Applying electromagnetism-like mechanism for feature selection , 2011, Inf. Sci..
[16] Fariborz Jolai,et al. Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm , 2012, Appl. Soft Comput..
[17] Chris N. Potts,et al. Scheduling with batching: A review , 2000, Eur. J. Oper. Res..
[18] M R Amin Naseri,et al. HYBRID FLOW SHOP SCHEDULING WITH PARALLEL BATCHING , 2009 .
[19] M. Mosleh,et al. Numerical solution of fuzzy differential equations under generalized differentiability by fuzzy neural network , 2013 .
[20] Hiroaki Ishii,et al. Two scheduling problems with fuzzy due-dates , 1992 .
[21] Deming Lei,et al. Variable neighbourhood search for minimising tardiness objectives on flow shop with batch processing machines , 2011 .
[22] R Saneifard. DEFUZZIFICATION METHOD FOR SOLVING FUZZY LINEAR SYSTEMS , 2009 .
[23] Purushothaman Damodaran,et al. Particle swarm optimization for scheduling batch processing machines in a permutation flowshop , 2013 .
[24] Juite Wang,et al. A fuzzy robust scheduling approach for product development projects , 2004, Eur. J. Oper. Res..
[25] Reza Tavakkoli-Moghaddam,et al. A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness , 2007, Inf. Sci..
[26] Reza Tavakkoli-Moghaddam,et al. A multi-objective electromagnetism algorithm for a bi-objective flowshop scheduling problem , 2012 .
[27] Chien-Wen Chao,et al. A discrete electromagnetism-like mechanism for single machine total weighted tardiness problem with sequence-dependent setup times , 2012, Appl. Soft Comput..
[28] Young Hwan Kim,et al. A problem reduction and decomposition approach for scheduling for a flowshop of batch processing machines , 2000, Eur. J. Oper. Res..
[29] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[30] K. Parand,et al. Solving nonlinear Lane-Emden type equations with unsupervised combined artificial neural networks , 2013 .
[31] M. Mathirajan,et al. A literature review, classification and simple meta-analysis on scheduling of batch processors in semiconductor , 2006 .
[32] Shu-Cherng Fang,et al. On the Convergence of a Population-Based Global Optimization Algorithm , 2004, J. Glob. Optim..