Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation
暂无分享,去创建一个
[1] Tae-Eog Lee,et al. Feedback Control of Cluster Tools for Regulating Wafer Delays , 2016, IEEE Transactions on Automation Science and Engineering.
[2] MengChu Zhou,et al. Scheduling of Dual-Arm Cluster Tools With Wafer Revisiting and Residency Time Constraints , 2014, IEEE Transactions on Industrial Informatics.
[3] Tae-Eog Lee,et al. Scheduling analysis of time-constrained dual-armed cluster tools , 2003 .
[4] Jun-Ho Lee,et al. Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots , 2013, IEEE Transactions on Automation Science and Engineering.
[5] Tae-Eog Lee,et al. An extended event graph with negative places and tokens for time window constraints , 2005, IEEE Transactions on Automation Science and Engineering.
[6] Tae-Eog Lee,et al. Schedulability Analysis of Time-Constrained Cluster Tools With Bounded Time Variation by an Extended Petri Net , 2008, IEEE Transactions on Automation Science and Engineering.
[7] Chengbin Chu,et al. Robust optimization for the cyclic hoist scheduling problem , 2015, Eur. J. Oper. Res..
[8] Jaehwan Yang,et al. Hybrid Flow Shop with Parallel Machines at the First Stage and Dedicated Machines at the Second Stage , 2015 .
[9] Chompoonoot Kasemset. Application of Adaptive Particle Swarm Optimization to Bi-level Job-Shop Scheduling Problem , 2014 .
[10] Jun-Ho Lee,et al. Scheduling In-Line Multiple Cluster Tools , 2015, IEEE Transactions on Semiconductor Manufacturing.
[11] Jun-Ho Lee,et al. Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets , 2015, IEEE Transactions on Automation Science and Engineering.
[12] Jun-Ho Lee,et al. Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm , 2015, IEEE Transactions on Automation Science and Engineering.
[13] MengChu Zhou,et al. Modeling, Analysis and Control of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation Based on Petri Nets , 2012, IEEE Transactions on Automation Science and Engineering.
[14] MengChu Zhou,et al. A Closed-Form Solution for Schedulability and Optimal Scheduling of Dual-Arm Cluster Tools With Wafer Residency Time Constraint Based on Steady Schedule Analysis , 2010, IEEE Transactions on Automation Science and Engineering.
[15] Tadao Murata,et al. Petri nets: Properties, analysis and applications , 1989, Proc. IEEE.
[16] MengChu Zhou,et al. Petri Net Modeling and Wafer Sojourn Time Analysis of Single-Arm Cluster Tools With Residency Time Constraints and Activity Time Variation , 2012, IEEE Transactions on Semiconductor Manufacturing.
[17] Yan Qiao,et al. Scheduling and Analysis of Start-Up Transient Processes for Dual-Arm Cluster Tools With Wafer Revisiting , 2015, IEEE Transactions on Semiconductor Manufacturing.
[18] Jun-Ho Lee,et al. Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types , 2014, IEEE Transactions on Automation Science and Engineering.
[19] Pengyu Yan,et al. Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance , 2014, Comput. Oper. Res..
[20] Babak Hamidzadeh,et al. An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints , 2001, IEEE Trans. Robotics Autom..
[21] Feng Chu,et al. A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.
[22] Tae-Eog Lee,et al. Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation , 2012 .
[23] MengChu Zhou,et al. Real-Time Scheduling of Single-Arm Cluster Tools Subject to Residency Time Constraints and Bounded Activity Time Variation , 2012, IEEE Transactions on Automation Science and Engineering.
[24] MengChu Zhou,et al. Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation , 2012, IEEE Transactions on Automation Science and Engineering.
[25] Jun-Ho Lee,et al. Scheduling Lot Switching Operations for Cluster Tools , 2013, IEEE Transactions on Semiconductor Manufacturing.
[26] Jun-Ho Lee,et al. Non-Cyclic Scheduling of a Wet Station , 2014, IEEE Transactions on Automation Science and Engineering.
[27] MengChu Zhou,et al. Scheduling of Single-Arm Multi-cluster Tools With Wafer Residency Time Constraints in Semiconductor Manufacturing , 2015, IEEE Transactions on Semiconductor Manufacturing.
[28] Philippe Lacomme,et al. Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP) , 2001 .
[29] Philippe Lacomme,et al. META-HEURISTICS FOR THE STOCHASTIC HOIST SCHEDULING PROBLEM , 2001 .
[30] MengChu Zhou,et al. Analysis of Wafer Sojourn Time in Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation , 2010, IEEE Transactions on Semiconductor Manufacturing.