A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the complexity of the above model and uncertainty involved in real-world scheduling problems, it is sometimes unrealistic or even impossible to acquire exact input data. Hence, we consider the parallel-machine scheduling problem with sequence-dependent set-up times under the hypothesis of fuzzy processing time's knowledge and two fuzzy objectives as the MIGP model. In addition, a quite effective and applicable methodology for solving the above fuzzy model are presented. At the end, the effectiveness of the proposed model and the denoted methodology is demonstrated through some test problems.

[1]  Rasaratnam Logendran,et al.  Scheduling unrelated parallel machines with sequence-dependent setups , 2007, Comput. Oper. Res..

[2]  José M. Valério de Carvalho,et al.  A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times , 2007, Eur. J. Oper. Res..

[3]  Marin Litoiu,et al.  Real-time task scheduling with fuzzy deadlines and processing times , 2001, Fuzzy Sets Syst..

[4]  Warren B. Powell,et al.  Solving Parallel Machine Scheduling Problems by Column Generation , 1999, INFORMS J. Comput..

[5]  R. Bulfin,et al.  Complexity of single machine, multi-criteria scheduling problems , 1993 .

[6]  M. Kuroda,et al.  Fuzzy Job Shop Scheduling , 1996 .

[7]  Maciej Hapke,et al.  Scheduling under Fuzziness , 2000 .

[8]  Mauro Dell'Amico,et al.  Annotated Bibliographies in Combinatorial Optimization , 1997 .

[9]  Roberto Musmanno,et al.  Robust scheduling of parallel machines with sequence-dependent set-up costs , 2005, Eur. J. Oper. Res..

[10]  Jose A. Ventura,et al.  Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times , 2000 .

[11]  Richard Bellman,et al.  Decision-making in fuzzy environment , 2012 .

[12]  Baoding Liu,et al.  Parallel machine scheduling models with fuzzy processing times , 2004, Inf. Sci..

[13]  Liu Min,et al.  Genetic algorithms for the optimal common due date assignment and the optimal scheduling policy in parallel machine earliness/tardiness scheduling problems , 2006 .

[14]  Didier Dubois,et al.  Possibility Theory - An Approach to Computerized Processing of Uncertainty , 1988 .

[15]  F. Frank Chen,et al.  Unrelated parallel machine scheduling with setup times and a total weighted tardiness objective , 2003 .

[16]  H. Prade Using fuzzy set theory in a scheduling problem: A case study , 1979 .

[17]  P. Brucker,et al.  Scheduling Algorithms, Second Revised and Enlarged Edition. , 1999 .

[18]  C. Hwang,et al.  Fuzzy Mathematical Programming: Methods and Applications , 1995 .

[19]  Svetlana A. Kravchenko,et al.  Parallel machine scheduling problems with a single server , 1997 .

[20]  H. Ishii,et al.  Single machine scheduling problem with fuzzy precedence relation , 1995 .

[21]  He-Yau Kang,et al.  Multicriteria scheduling using fuzzy theory and tabu search , 2002 .

[22]  H. Edwin Romeijn,et al.  Parallel machine scheduling: A probabilistic analysis , 1996 .

[23]  Hiroaki Ishii,et al.  One machine scheduling problem with fuzzy duedates , 1994 .

[24]  T.C.E. Cheng,et al.  A state-of-the-art review of parallel-machine scheduling research , 1990 .

[25]  D. Petrovic,et al.  Multicriteria ranking of inventory replenishment policies in the presence of uncertainty in customer demand , 2001 .

[26]  Tzung-Pei Hong,et al.  A new triangular fuzzy Johnson algorithm , 1999 .

[27]  Jan Karel Lenstra,et al.  Sequencing and scheduling : an annotated bibliography , 1997 .

[28]  R Tavakoli Moghadam,et al.  A FUZZY GOAL PROGRAMMING APPROACH FOR A SINGLE MACHINE SCHEDULING PROBLEM , 2006 .

[29]  H. Ishii,et al.  Fuzzy due-date scheduling problem with fuzzy processing time , 1999 .

[30]  D. Petrovic,et al.  A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions , 2006, Fuzzy Sets Syst..

[31]  H. Zimmermann DESCRIPTION AND OPTIMIZATION OF FUZZY SYSTEMS , 1975 .

[32]  Warren B. Powell,et al.  Exact algorithms for scheduling multiple families of jobs on parallel machines , 2003 .

[33]  Warren B. Powell,et al.  A column generation based decomposition algorithm for a parallel machine just-in-time scheduling problem , 1999, Eur. J. Oper. Res..

[34]  Ping-Teng Chang,et al.  Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach , 2001, Int. J. Comput. Integr. Manuf..

[35]  Panos M. Pardalos,et al.  Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times , 2008, Comput. Oper. Res..

[36]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[37]  Hiroaki Ishii,et al.  An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint , 2000, Fuzzy Sets Syst..

[38]  Peter Brucker,et al.  Scheduling Algorithms , 1995 .

[39]  Chris N. Potts,et al.  Scheduling with batching: A review , 2000, Eur. J. Oper. Res..

[40]  Ignacio E. Grossmann,et al.  Scheduling optimization under uncertainty - an alternative approach , 2003, Comput. Chem. Eng..

[41]  Zhi-Long Chen,et al.  Parallel machine scheduling with a common due window , 2002, Eur. J. Oper. Res..

[42]  Taïcir Loukil,et al.  Solving multi-objective production scheduling problems using metaheuristics , 2005, Eur. J. Oper. Res..

[43]  Masatoshi Sakawa,et al.  Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..

[44]  H. Ishibuchi,et al.  Multi-objective scheduling with fuzzy due-date , 1998 .

[45]  Wai Keung Wong,et al.  Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory , 2007, Eur. J. Oper. Res..