Incorporating multi-area reliability concepts to the evaluation of the Brazilian power system capacity to supply the peak load
暂无分享,去创建一个
[1] Chanan Singh,et al. Improved Algorithms for Multi-Area Reliability Evaluation Using the Decomposition-Simulation Approach , 1989, IEEE Power Engineering Review.
[2] W. G. Watson,et al. Reliability Modeling in Electric Power Systems , 1979 .
[3] M.E.P. Maceira,et al. TEN YEARS OF APPLICATION OF STOCHASTIC DUAL DYNAMIC PROGRAMMING IN OFFICIAL AND AGENT STUDIES IN BRAZIL - DESCRIPTION OF THE NEWAVE PROGRAM , 2008 .
[4] C. Singh. Forced Frequency-Balancing Technique for Discrete Capacity Systems , 1983, IEEE Transactions on Reliability.
[5] Roy Jensen,et al. Reliability Modeling in Electric Power Systems , 1979 .
[6] J. M. Damázio,et al. Chain of Optimization Models for Setting the Energy Dispatch and Spot Price in the Brazilian System , 2001 .
[7] F. N. Lee. Multi-area Reliability Evaluation via a Demand–Supply Feasibility Theorem , 1987 .
[8] A. M. Leite da Silva,et al. Frequency and duration method for reliability evaluation of large-scale hydrothermal generating systems , 1991 .
[9] Carmen L. T. Borges,et al. Multi-area reliability evaluation including frequency and duration indices with multiple time varying load curves , 2012 .
[10] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[11] T. C. Justino,et al. A multi-area approach to evaluate the Brazilian power system capacity to supply the peak load demand using detailed simulation model of power plants operation , 2014, 2014 Power Systems Computation Conference.
[12] Mario V. F. Pereira,et al. A Direct Method for Multi-Area Reliability Evaluation , 1987 .