Production scheduling: a generic building block for enterprise integration

In this paper we investigate production scheduling as a generic building block for enterprise integration. We suggest an object-oriented representation of this module, determine its elements and define the interfaces to other areas of decision making. Relating the model to PERA its focus is the definition phase. We will give an answer to the question how to integrate problem desrciption and problem solution. The building block can be used as a reference for production management within enterprise integration.

[1]  Jacek Blazewicz,et al.  Scheduling under resource constraints - deterministic models , 1986 .

[2]  Ralph E. Johnson,et al.  Surveying current research in object-oriented design , 1990, CACM.

[3]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[4]  Jan Karel Lenstra,et al.  Sequencing by enumerative methods , 1977 .

[5]  Herbert S. Wilf,et al.  Algorithms and Complexity , 1994, Lecture Notes in Computer Science.

[6]  Theodore J. Williams,et al.  The Purdue Enterprise Reference Architecture , 1992, DIISM.

[7]  Wei-Tek Tsai,et al.  Object-Oriented Analysis: Criteria and Case Study , 1993, Int. J. Softw. Eng. Knowl. Eng..

[8]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[9]  Werner Geiger,et al.  PPS Produktionsplanung und -steuerung , 1991 .

[10]  Günter Schmidt,et al.  A Decision Support System for Production Scheduling , 1992 .

[11]  Kai Mertins,et al.  Object-oriented modelling and analysis of business processes , 1995 .

[12]  Günter Schmidt CAM: Algorithmen und Decision Support für die Fertigungssteuerung , 1989 .

[13]  Jan Karel Lenstra,et al.  Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..

[14]  G. Rand Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .

[15]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[16]  Guus Wolf,et al.  Schedule management: An object oriented approach , 1994, Decis. Support Syst..

[17]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[18]  Edward Yourdon,et al.  Object-oriented analysis , 2012 .

[19]  Eugene L. Lawler,et al.  Sequencing and scheduling: algorithms and complexity , 1989 .