A Nordic heavy haul experience and best practices
暂无分享,去创建一个
[1] Wolfgang Schoch,et al. CONTACT GEOMETRY AND SURFACE FATIGUE: MINIMIZING THE RISK OF HEAD- CHECK FORMATION.. , 2002 .
[2] M Ph Papaelias,et al. A review on non-destructive evaluation of rails: State-of-the-art and future development , 2008 .
[3] Per-Olof Larsson-Kråik. Managing the wheel–rail interface: Railway infrastructure maintenance in a severe environment: The Swedish experience , 2009 .
[4] Matthias Asplund,et al. Reliability and measurement accuracy of a condition monitoring system in an extreme climate: A case study of automatic laser scanning of wheel profiles , 2014 .
[5] R. D. Fröhling,et al. Wheel/rail interface management in heavy haul railway operations—applying science and technology , 2007 .
[6] Matthias Asplund,et al. Towards perfected rail maintenance : combining routine and long-term research activities , 2015 .
[7] Stefan Björklund,et al. Wheel–rail contact mechanics , 2009 .
[8] Aditya Parida,et al. Reliability Analysis for Degradation of Locomotive Wheels using Parametric Bayesian Approach , 2014, Qual. Reliab. Eng. Int..
[9] Jing Lin,et al. Reliability analysis for preventive maintenance based on classical and Bayesian semi-parametric degradation approaches using locomotive wheel-sets as a case study , 2015, Reliab. Eng. Syst. Saf..