A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction

PurposeThe research introduces means for improving premanufacturing processes (design, procurement and bidding) by leveraging digitalisation in offsite construction. Specifically, this paper proposes a framework that provides measures for the planning and implementation of digitalisation in offsite construction by positioning building information modelling (BIM) as the key technology and lean principles to add value and reduce waste.Design/methodology/approachThe paper follows the design science research approach to develop the proposed framework and attain the aforementioned objective. The developed framework includes data collection, value-stream mapping and simulation to assess current processes, develop and propose improvements. An empirical implementation is employed to demonstrate the applicability of both the framework and the measures used to evaluate the outcomes.FindingsThe application of the proposed three-stage framework resulted in 9.45%–23.33%-time reduction per year for the various improvement categories in premanufacturing phases. Employing simulation and applying the developed measures provide incentive for upper management to adopt the suggested improvements. Additionally, while the empirical implementation was tested on a modular construction company, the methods used indicate that the framework, with its generic guidelines, could be applied and customized to any offsite company.Originality/valueWhile several studies propose that BIM-Lean integration offers an advantage in the context of production systems, this paper focuses on the initial design and planning phases, which are mostly overlooked in the literature. Moreover, the present study provides quantitative evidence of the benefits of data integration through BIM technology.

[1]  Mohamed Al-Hussein,et al.  Building information modelling for off-site construction: Review and future directions , 2019, Automation in Construction.

[2]  Antonio Grilo,et al.  Bibliometric analysis and review of Building Information Modelling literature published between 2005 and 2015 , 2017 .

[3]  Charles J. Kibert,et al.  Perceptions of offsite construction in the United States: An investigation of current practices , 2020 .

[4]  John Tookey,et al.  Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges , 2017 .

[5]  Charles J. Kibert,et al.  Outcomes of the State-of-the-art Symposium: status, challenges and future directions of offsite construction , 2018 .

[6]  Yang Miang Goh,et al.  Lean production theory-based simulation of modular construction processes , 2019, Automation in Construction.

[7]  Seung-Hyun Lee,et al.  Identifying Waste: Applications of Construction Process Analysis , 1999 .

[8]  Lukumon O. Oyedele,et al.  Offsite construction: Developing a BIM-Based optimizer for assembly , 2019, Journal of Cleaner Production.

[9]  Carlos Torres Formoso,et al.  Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM , 2020 .

[10]  Geoffrey Qiping Shen,et al.  RBL-PHP: Simulation of Lean Construction and Information Technologies for Prefabrication Housing Production , 2018 .

[11]  Geoffrey Qiping Shen,et al.  A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong , 2018, Journal of Cleaner Production.

[12]  Na Lu,et al.  Implementation of Building Information Modeling (BIM) in Modular Construction: Benefits and Challenges , 2010 .

[13]  Samir Chatterjee,et al.  A Design Science Research Methodology for Information Systems Research , 2008 .

[14]  E. Zavadskas,et al.  Critical evaluation of off-site construction research: a scientometric analysis , 2018 .

[15]  Glenn Ballard,et al.  Implementing Lean Construction: Understanding and Action , 1998 .

[16]  Yu Bai,et al.  Lean Methodologies and Techniques for Modular Construction: Chronological and Critical Review , 2019 .

[17]  Osama Moselhi,et al.  A BIM-based Supply Chain Integration for Prefabrication and Modularization , 2018 .

[18]  Farook Hamzeh,et al.  Simulating the dynamics of social agents and information flows in BIM-based design , 2018, Automation in Construction.

[19]  Mohamed Al-Hussein,et al.  Automated verification of 3D manufacturability for steel frame assemblies , 2020 .

[20]  Xiaolong Xue,et al.  Exploring a body of knowledge for promoting the sustainable transition to prefabricated construction , 2020 .

[21]  Azharul Karim,et al.  A methodology for effective implementation of lean strategies and its performance evaluation in manufacturing organizations , 2013, Bus. Process. Manag. J..

[22]  Simaan M. AbouRizk,et al.  Generic Implementation of Lean Concepts in Simulation Models , 2004 .

[23]  Nicholas Chileshe,et al.  Lean and agile integration within offsite construction using discrete event simulation : A systematic literature review , 2016 .

[24]  Alan R. Hevner,et al.  Design Science in Information Systems Research , 2004, MIS Q..

[25]  Shang Gao,et al.  A holistic review of off-site construction literature published between 2008 and 2018 , 2018, Journal of Cleaner Production.

[26]  Farook Hamzeh,et al.  A Process-Social Perspective for Understanding Design Information Flow , 2017 .

[27]  Mohamed Al-Hussein,et al.  Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing Performance , 2020 .

[28]  Les Gasser,et al.  Methodology for the Integration of Project Documents in Model-Based Information Systems , 2005 .