An exploratory assessment of project duration in multiple-project schedules where resources are allocated by the Theory of Constraints method

The theory of constraints (TOC) method for managing multiple projects provides a relatively new and simple heuristic for allocating constrained resources to projects. While this method is increasingly being used, there is little information about its merit and it has not yet been subjected to extensive testing. In this paper literature relevant to the allocation of resources to multiple projects is first reviewed. Thereafter the TOC method for allocating resources to multiple projects is explained. Finally the paper reports on an exploratory study to evaluate the effect that the TOC method for assigning resources has on project duration. OPSOMMING Die “Theory of Constraints” (TOC)-metode vir die bestuur van veelvuldige projekte bied ’n relatief nuwe en eenvoudige heuristiek om beperkte hulpbronne aan projekte toe te ken. In die praktyk raak hierdie metode toenemend gewild maar daar is weinig inligting beskikbaar oor die meriete daarvan. Die metode is ook nog nie aan uitgebreide toetsing onderwerp nie. In hierdie artikel word ’n oorsig gegee oor die literatuur van hulpbrontoedeling. Tweedens word die TOC metode vir hulpbrontoedeling bespreek. Daarna word verslag gedoen oor ’n eksploratiewe ondersoek na die effek wat die TOC metode op die tydsduur van projekte het.

[1]  Oliver Holthaus Design of efficient job shop scheduling rules , 1997 .

[2]  Christopher Aitken Critical Chain Project Management: An Overview , 2012 .

[3]  Pilar Tormos,et al.  The Evolution of Software Quality in Project Scheduling , 1999 .

[4]  Willy Herroelen,et al.  On the merits and pitfalls of critical chain scheduling , 2000 .

[5]  Samir I. G. Allam,et al.  Multi-project scheduling: a new categorization for heuristic scheduling rules in construction scheduling problems , 1988 .

[6]  Avraham Shtub,et al.  Multi-Project Scheduling and Control: A Process-Based Comparative Study of the Critical Chain Methodology and Some Alternatives , 2004 .

[7]  Herman Steyn Project management applications of the theory of constraints beyond critical chain scheduling , 2002 .

[8]  Mats Engwall,et al.  The resource allocation syndrome: the prime challenge of multi-project management? , 2003 .

[9]  Scott E. Fricke,et al.  Managing multiple engineering projects in a manufacturing support environment , 2000, IEEE Trans. Engineering Management.

[10]  T. Raz,et al.  A Critical Look at Critical Chain Project Management , 2003, IEEE Engineering Management Review.

[11]  Lawrence P. Leach,et al.  Critical Chain Project Management , 2000 .

[12]  Chiu-Chi Wei,et al.  Resource-constrained project management using enhanced theory of constraint , 2002 .

[13]  J. Davidson Frame,et al.  Project management: A managerial approach, seventh edition , 2009 .

[14]  Egon Balas,et al.  The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .

[15]  I. Kurtulus,et al.  Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .

[16]  María Pilar Tormos,et al.  A multicriteria heuristic method to improve resource allocation in multiproject scheduling , 2000, Eur. J. Oper. Res..

[17]  Richard B. Chase,et al.  Operations Management , 2019, CCSP (ISC)2 Certified Cloud Security Professional Official Study Guide, 2nd Edition.

[18]  Ibrahim S. Kurtulus,et al.  Multiproject scheduling: Analysis of scheduling strategies under unequal delay penalties , 1985 .

[19]  Janet K. Yates,et al.  Construction Total Project Management Planning Issues , 2002 .

[20]  Huan Neng Chiu,et al.  Two heuristics for scheduling multiple projects with resource constraints , 1996 .

[21]  Thomas E. Morton,et al.  Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics , 1993 .

[22]  Robert C. Newbold,et al.  Project Management in the Fast Lane: Applying the Theory of Constraints , 1998 .

[23]  Paul S. Adler,et al.  From project to process management: an empirically-based framework for analyzing product development time , 1995 .

[24]  Herman Steyn An investigation into the fundamentals of critical chain project scheduling , 2001 .

[25]  J. Rodney Turner,et al.  THE HANDBOOK OF PROJECT-BASED MANAGEMENT , 2008 .

[26]  Saad H.S. Al-Jibouri Effects of resource management regimes on project schedule , 2002 .

[27]  Lawrence P. Leach,et al.  Critical Chain Project Management Improves Project Performance , 1999 .

[28]  S. S. Panwalkar,et al.  A Survey of Scheduling Rules , 1977, Oper. Res..

[29]  Subhash C. Narula,et al.  Multi-Project Scheduling: Analysis of Project Performance , 1985 .

[30]  Boaz Golany,et al.  Managing multi-project environments through constant work-in-process , 2003 .

[31]  William G. Ferrell,et al.  Evaluating simple scheduling rules in a mixed shop environment , 2000 .

[32]  Eliyahu M. Goldratt,et al.  What is this thing called theory of constraints and how should it be implemented , 1990 .

[33]  David Greenwood,et al.  An efficient method for scheduling construction projects with resource constraints , 2001 .

[34]  Dennis Sherwood,et al.  Seeing the Forest for the Trees: A Manager's Guide to Applying Systems Thinking , 2011 .

[35]  Vincent A. Mabert,et al.  Evaluating project scheduling and due date assignment procedures: an experimental analysis , 1988 .

[36]  F. F. Boctor,et al.  Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .