A multilevel multilayer framework for manufacturing control
暂无分享,去创建一个
[1] U. Karmarkar,et al. Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems , 1984 .
[2] Sven Axsäter,et al. Aggregation of Product Data for Hierarchical Production Planning , 1981, Oper. Res..
[3] Madan G. Singh,et al. Systems: Decomposition, optimisation, and control , 1978 .
[4] I. Lefkowitz,et al. Multilevel Approach Applied to Control System Design , 1966 .
[5] Xi-Ren Cao,et al. Perturbation analysis of discrete event dynamic systems , 1991 .
[6] E. Toczylowski,et al. Aggregate lot-size scheduling for a class of two-stage batch manufacturing systems , 1986 .
[7] R. Bellman. Dynamic programming. , 1957, Science.
[8] Madan G. Singh,et al. Dynamical Hierarchical Control , 1977 .
[9] Joe H. Chow,et al. Time scale modeling of sparse dynamic networks , 1985 .
[10] Gabriel R. Bitran,et al. ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .
[11] M. Aoki. Some approximation methods for estimation and control of large scale systems , 1978 .
[12] E. Toczylowski,et al. Multi-level production scheduling for a class of flexible machining and assembly systems , 1989 .
[13] J. F. Coales,et al. A hierarchical strategy for the temperature control of a hot strip roughing process , 1973 .
[14] E. Toczylowski,et al. Aggregation and disaggregation of end items in a class of multistage production systems , 1988 .
[15] S. Gershwin,et al. A control perspective on recent trends in manufacturing systems , 1986, IEEE Control Systems Magazine.
[16] Arnoldo C. Hax,et al. Hierarchical integration of production planning and scheduling , 1973 .
[17] Magdi S. Mahmoud,et al. Large scale systems modelling , 1981 .
[18] M. Aoki. Control of large-scale dynamic systems by aggregation , 1968 .
[19] Khalil S. Hindi,et al. Hybrid Knowledge-Based Systems for Industrial Scheduling , 1989 .
[20] R. Anthony,et al. Planning and Control Systems: A Framework for Analysis , 1965 .
[21] P. Varaiya,et al. Multilayer control of large Markov chains , 1978 .
[22] M. Mesarovic,et al. Theory of Hierarchical, Multilevel, Systems , 1970 .
[23] K. Preston White,et al. A recent survey of production scheduling , 1988, IEEE Trans. Syst. Man Cybern..
[24] Mohamed F. Hassan,et al. Closed loop hierarchical control for river pollution , 1976, Autom..
[25] Madan G. Singh,et al. Modelling and hierarchical optimization for oversaturated urban road traffic networks , 1974 .
[26] S. Graves. Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems , 1982 .