Hybrid Models for the Control and Optimization of Manufacturing Systems

[1]  Laurence A. Wolsey,et al.  bc -- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems , 2000 .

[2]  Christos G. Cassandras,et al.  Perturbation analysis for online control and optimization of stochastic fluid models , 2002, IEEE Trans. Autom. Control..

[3]  Youngho Lee,et al.  Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum , 2010, Comput. Oper. Res..

[4]  Rui Yu,et al.  A 'surrogate problem' approach for lot size optimization in manufacturing systems , 2000, Proceedings of the 2000 American Control Conference. ACC (IEEE Cat. No.00CH36334).

[5]  Horst Tempelmeier,et al.  Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic , 2009, Comput. Oper. Res..

[6]  Debasis Mitra,et al.  Analysis and design of rate-based congestion control of high speed networks, I: stochastic fluid models, access regulation , 1991, Queueing Syst. Theory Appl..

[7]  Christos G. Cassandras,et al.  Perturbation analysis of communication networks with feedback control using stochastic hybrid models , 2006 .

[8]  Yorai Wardi,et al.  A Unified Approach to Infinitesimal Perturbation Analysis in Stochastic Flow Models: The Single-Stage Case , 2010, IEEE Transactions on Automatic Control.

[9]  Christos G. Cassandras,et al.  Optimal control for steel annealing processes as hybrid systems , 2004 .

[10]  Uday S. Karmarkar,et al.  Lot-Sizing and Lead-time Performance in a Manufacturing Cell , 1985 .

[11]  Heinz Häfner Lot sizing and throughput times in a job shop , 1991 .

[12]  Felisa J. Vázquez-Abad,et al.  Centralized and decentralized asynchronous optimization of stochastic discrete-event systems , 1998 .

[13]  D. Mitra,et al.  Stochastic theory of a data-handling system with multiple sources , 1982, The Bell System Technical Journal.

[14]  Soundar R. T. Kumara,et al.  Resource-Sharing Queueing Systems with Fluid-Flow Traffic , 2008, Oper. Res..

[15]  Christos G. Cassandras,et al.  Perturbation Analysis and Optimization of Stochastic Hybrid Systems , 2010, Eur. J. Control.

[16]  Christos G. Cassandras,et al.  Perturbation analysis and optimization of stochastic flow networks , 2004, IEEE Transactions on Automatic Control.

[17]  Christos G. Cassandras,et al.  Perturbation analysis of feedback-controlled stochastic flow systems , 2004, IEEE Transactions on Automatic Control.

[18]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[19]  G. Tinarelli Inventory control: Models and problems , 1983 .

[20]  S. Selcuk Erenguc,et al.  Modeling multiple stage manufacturing systems with generalized costs and capacity issues , 2005 .

[21]  J. K. Lenstra,et al.  Deterministic Production Planning: Algorithms and Complexity , 1980 .

[22]  Safia Kedad-Sidhoum,et al.  MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs , 2007, RAIRO Oper. Res..

[23]  John M. Wilson,et al.  A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over , 2006, J. Oper. Res. Soc..

[24]  Christos G. Cassandras,et al.  Resource contention games in multiclass stochastic flow models , 2011 .

[25]  K. R. Baker,et al.  An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints , 1978 .

[26]  Wei-Bo Gong,et al.  Time-driven fluid simulation for high-speed networks , 1999, IEEE Trans. Inf. Theory.

[27]  U. Karmarkar,et al.  Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems , 1984 .

[28]  Donald F. Towsley,et al.  Fluid Simulation of Large Scale Networks: Issues and Tradeoffs , 1999, PDPTA.

[29]  Christos G. Cassandras,et al.  A Solution to the Optimal Lot-Sizing Problem as a Stochastic Resource Contention Game , 2012, IEEE Transactions on Automation Science and Engineering.

[30]  Horst Tempelmeier,et al.  A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures , 2009, OR Spectr..

[31]  Christos G. Cassandras,et al.  Perturbation analysis of stochastic hybrid systems and applications to resource contention games , 2011 .

[32]  David D. Yao,et al.  Scheduling semiconductor lines using a fluid network model , 1994, IEEE Trans. Robotics Autom..

[33]  Christos G. Cassandras,et al.  Perturbation Analysis and Optimization of Multiclass Multiobjective Stochastic Flow Models , 2011, Discret. Event Dyn. Syst..

[34]  Christos G. Cassandras,et al.  Perturbation Analysis and Resource Contention Games in Multiclass Stochastic Flow Models , 2009, ADHS.

[35]  Xi-Ren Cao,et al.  Perturbation analysis of discrete event dynamic systems , 1991 .

[36]  Yves Pochet,et al.  Uncapacitated lot sizing with backlogging: the convex hull , 2007, Math. Program..

[37]  Kerem Akartunali,et al.  A heuristic approach for big bucket multi-level production planning problems , 2009, Eur. J. Oper. Res..

[38]  Hartmut Stadtler,et al.  Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows , 2003, Oper. Res..

[39]  Christos G. Cassandras,et al.  Using infinitesimal perturbation analysis of stochastic flow models to recover performance sensitivity estimates of discrete event systems , 2012, Discret. Event Dyn. Syst..

[40]  Awi Federgruen,et al.  Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems , 2007, Oper. Res..

[41]  C.G. Cassandras,et al.  Optimal control of hybrid systems in manufacturing , 2000, Proceedings of the IEEE.