Hybrid Models for the Control and Optimization of Manufacturing Systems
暂无分享,去创建一个
[1] Laurence A. Wolsey,et al. bc -- prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems , 2000 .
[2] Christos G. Cassandras,et al. Perturbation analysis for online control and optimization of stochastic fluid models , 2002, IEEE Trans. Autom. Control..
[3] Youngho Lee,et al. Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum , 2010, Comput. Oper. Res..
[4] Rui Yu,et al. A 'surrogate problem' approach for lot size optimization in manufacturing systems , 2000, Proceedings of the 2000 American Control Conference. ACC (IEEE Cat. No.00CH36334).
[5] Horst Tempelmeier,et al. Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic , 2009, Comput. Oper. Res..
[6] Debasis Mitra,et al. Analysis and design of rate-based congestion control of high speed networks, I: stochastic fluid models, access regulation , 1991, Queueing Syst. Theory Appl..
[7] Christos G. Cassandras,et al. Perturbation analysis of communication networks with feedback control using stochastic hybrid models , 2006 .
[8] Yorai Wardi,et al. A Unified Approach to Infinitesimal Perturbation Analysis in Stochastic Flow Models: The Single-Stage Case , 2010, IEEE Transactions on Automatic Control.
[9] Christos G. Cassandras,et al. Optimal control for steel annealing processes as hybrid systems , 2004 .
[10] Uday S. Karmarkar,et al. Lot-Sizing and Lead-time Performance in a Manufacturing Cell , 1985 .
[11] Heinz Häfner. Lot sizing and throughput times in a job shop , 1991 .
[12] Felisa J. Vázquez-Abad,et al. Centralized and decentralized asynchronous optimization of stochastic discrete-event systems , 1998 .
[13] D. Mitra,et al. Stochastic theory of a data-handling system with multiple sources , 1982, The Bell System Technical Journal.
[14] Soundar R. T. Kumara,et al. Resource-Sharing Queueing Systems with Fluid-Flow Traffic , 2008, Oper. Res..
[15] Christos G. Cassandras,et al. Perturbation Analysis and Optimization of Stochastic Hybrid Systems , 2010, Eur. J. Control.
[16] Christos G. Cassandras,et al. Perturbation analysis and optimization of stochastic flow networks , 2004, IEEE Transactions on Automatic Control.
[17] Christos G. Cassandras,et al. Perturbation analysis of feedback-controlled stochastic flow systems , 2004, IEEE Transactions on Automatic Control.
[18] Uday S. Karmarkar,et al. Lot Sizes, Lead Times and In-Process Inventories , 1987 .
[19] G. Tinarelli. Inventory control: Models and problems , 1983 .
[20] S. Selcuk Erenguc,et al. Modeling multiple stage manufacturing systems with generalized costs and capacity issues , 2005 .
[21] J. K. Lenstra,et al. Deterministic Production Planning: Algorithms and Complexity , 1980 .
[22] Safia Kedad-Sidhoum,et al. MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs , 2007, RAIRO Oper. Res..
[23] John M. Wilson,et al. A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over , 2006, J. Oper. Res. Soc..
[24] Christos G. Cassandras,et al. Resource contention games in multiclass stochastic flow models , 2011 .
[25] K. R. Baker,et al. An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints , 1978 .
[26] Wei-Bo Gong,et al. Time-driven fluid simulation for high-speed networks , 1999, IEEE Trans. Inf. Theory.
[27] U. Karmarkar,et al. Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems , 1984 .
[28] Donald F. Towsley,et al. Fluid Simulation of Large Scale Networks: Issues and Tradeoffs , 1999, PDPTA.
[29] Christos G. Cassandras,et al. A Solution to the Optimal Lot-Sizing Problem as a Stochastic Resource Contention Game , 2012, IEEE Transactions on Automation Science and Engineering.
[30] Horst Tempelmeier,et al. A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures , 2009, OR Spectr..
[31] Christos G. Cassandras,et al. Perturbation analysis of stochastic hybrid systems and applications to resource contention games , 2011 .
[32] David D. Yao,et al. Scheduling semiconductor lines using a fluid network model , 1994, IEEE Trans. Robotics Autom..
[33] Christos G. Cassandras,et al. Perturbation Analysis and Optimization of Multiclass Multiobjective Stochastic Flow Models , 2011, Discret. Event Dyn. Syst..
[34] Christos G. Cassandras,et al. Perturbation Analysis and Resource Contention Games in Multiclass Stochastic Flow Models , 2009, ADHS.
[35] Xi-Ren Cao,et al. Perturbation analysis of discrete event dynamic systems , 1991 .
[36] Yves Pochet,et al. Uncapacitated lot sizing with backlogging: the convex hull , 2007, Math. Program..
[37] Kerem Akartunali,et al. A heuristic approach for big bucket multi-level production planning problems , 2009, Eur. J. Oper. Res..
[38] Hartmut Stadtler,et al. Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows , 2003, Oper. Res..
[39] Christos G. Cassandras,et al. Using infinitesimal perturbation analysis of stochastic flow models to recover performance sensitivity estimates of discrete event systems , 2012, Discret. Event Dyn. Syst..
[40] Awi Federgruen,et al. Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems , 2007, Oper. Res..
[41] C.G. Cassandras,et al. Optimal control of hybrid systems in manufacturing , 2000, Proceedings of the IEEE.