Underground mine scheduling under uncertainty

Abstract Underground mine schedules seek to determine start dates for activities related to the extraction of ore, often with an objective of maximizing net present value; constraints enforce geotechnical precedence between activities, and restrict resource consumption on a per-time-period basis, e.g., development footage and extracted tons. Strategic schedules address these start dates at a coarse level, whereas tactical schedules must account for the day-to-day variability of underground mine operations, such as unanticipated equipment breakdowns and ground conditions, both of which might slow production. At the time of this writing, the underground mine scheduling literature is dominated by a deterministic treatment of the problem, usually modeled as a Resource Constrained Project Scheduling Problem (RCPSP), which precludes mine operators from reacting to unforeseen circumstances. Therefore, we propose a stochastic integer programming framework that: (i) characterizes uncertainty in duration and economic value for each underground mining activity; (ii) formulates a new stochastic variant of the RCPSP; (iii) suggests an optimization-based heuristic; and, (iv) produces implementable, tactical schedules in a practical amount of time and provides corresponding managerial insights.

[1]  Erkan Topal,et al.  Dynamic short term production scheduling and machine allocation in underground mining using mathematical programming , 2010 .

[2]  Alexandra M. Newman,et al.  Optimizing the open pit-to-underground mining transition , 2017, Eur. J. Oper. Res..

[3]  Maarten H. van der Vlerk,et al.  Stochastic integer programming:General models and algorithms , 1999, Ann. Oper. Res..

[4]  Clayton V. Deutsch,et al.  Mineral Resource Estimation , 2013 .

[5]  P. Guttorp,et al.  Studies in the history of probability and statistics XLIX On the Matérn correlation family , 2006 .

[6]  Erik Demeulemeester,et al.  Robust Project Scheduling , 2011, Found. Trends Technol. Inf. Oper. Manag..

[7]  H. Askari-Nasab,et al.  A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile , 2014 .

[8]  R. Schultz,et al.  Two-stage stochastic integer programming : a survey , 1996 .

[9]  Ignacio E. Grossmann,et al.  Computational strategies for non-convex multistage MINLP models with decision-dependent uncertainty and gradual uncertainty resolution , 2013, Ann. Oper. Res..

[10]  Alexandra M. Newman,et al.  Barrick's Turquoise Ridge Gold Mine Optimizes Underground Production Scheduling Operations , 2021, INFORMS J. Appl. Anal..

[11]  Rüdiger Schultz,et al.  Dual decomposition in stochastic integer programming , 1999, Oper. Res. Lett..

[12]  Amina Lamghari,et al.  A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..

[13]  Timothy C. Coburn,et al.  Geostatistics for Natural Resources Evaluation , 2000, Technometrics.

[14]  Maurice Queyranne,et al.  A study of the Bienstock–Zuckerberg algorithm: applications in mining and resource constrained project scheduling , 2016, Comput. Optim. Appl..

[15]  Eduardo Moreno,et al.  A New Algorithm for the Open-Pit Mine Production Scheduling Problem , 2012, Oper. Res..

[16]  Gündüz Ulusoy,et al.  Project Scheduling Under Uncertainty , 2021 .

[17]  Alexandra M. Newman,et al.  Extraction and Backfill Scheduling in a Complex Underground Mine , 2014, Interfaces.

[18]  Peter A. Dowd,et al.  Strategic mine planning and design: some challenges and strategies for addressing them , 2016 .

[19]  Shabbir Ahmed,et al.  Two‐Stage Stochastic Integer Programming: A Brief Introduction , 2011 .

[20]  Graham C. Goodwin,et al.  Open-cut Mine Planning via Closed-loop Receding-horizon Optimal Control , 2007 .

[21]  Jan Karel Lenstra,et al.  Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..

[22]  W. Matthew Carlyle,et al.  Underground Planning at Stillwater Mining Company , 2001, Interfaces.

[23]  René A. Caldentey Optimal Timing of a Multi-Stage Project Under Market Uncertainty , 2018 .

[24]  Mehmet Sari,et al.  The stochastic assessment of strength and deformability characteristics for a pyroclastic rock mass , 2009 .

[25]  Alexander Shapiro,et al.  The empirical behavior of sampling methods for stochastic programming , 2006, Ann. Oper. Res..

[26]  Antonio Alonso Ayuso,et al.  Introduction to Stochastic Programming , 2009 .

[27]  Soutir Bandyopadhyay,et al.  A test for stationarity for irregularly spaced spatial data , 2017 .

[28]  Nestor Raul Ortiz Pimiento,et al.  The project scheduling problem with non-deterministic activities duration: A literature review , 2018 .

[29]  Willy Herroelen,et al.  Robust and reactive project scheduling: a review and classification of procedures , 2004 .

[30]  Bernardo K. Pagnoncelli,et al.  Better management of production incidents in mining using multistage stochastic optimization , 2019, Resources Policy.

[31]  Erik Demeulemeester,et al.  The discrete time/resource trade-off problem in project networks: a branch-and-bound approach , 2000 .

[32]  P. Moran Notes on continuous stochastic phenomena. , 1950, Biometrika.

[33]  Suvrajeet Sen,et al.  An Introduction to Two-Stage Stochastic Mixed-Integer Programming , 2017 .

[34]  Daniel Bienstock,et al.  Solving LP Relaxations of Large-Scale Precedence Constrained Problems , 2010, IPCO.

[35]  Ignacio E. Grossmann,et al.  A stochastic programming approach to planning of offshore gas field developments under uncertainty in reserves , 2004, Comput. Chem. Eng..

[36]  Roussos Dimitrakopoulos,et al.  Algorithmic approach to pushback design based on stochastic programming: method, application and comparisons , 2010 .

[37]  Majid Ataee-pour,et al.  Determination of the effect of operating cost uncertainty on mining project evaluation , 2012 .

[38]  Omid Nohadani,et al.  Optimization under Decision-Dependent Uncertainty , 2016, SIAM J. Optim..

[39]  Roussos Dimitrakopoulos,et al.  Stochastic optimisation model for open pit mine planning: application and risk analysis at copper deposit , 2007 .

[40]  Andrea J. Brickey Underground production scheduling optimization with ventilation constraints , 2015 .

[41]  Leen Stougie,et al.  On the convex hull of the simple integer recourse objective function , 1995, Ann. Oper. Res..

[42]  Alexander Shapiro,et al.  The Sample Average Approximation Method for Stochastic Discrete Optimization , 2002, SIAM J. Optim..

[43]  I M Glacken,et al.  Mineral Resource Estimation By , 2022 .

[44]  Roussos Dimitrakopoulos,et al.  Dynamically optimizing the strategic plan of mining complexes under supply uncertainty , 2019, Resources Policy.

[45]  Alexandra M. Newman,et al.  Is openpit production scheduling “easier” than its underground counterpart? , 2015 .

[46]  K. Luxbacher,et al.  Stochastic modeling of gob gas venthole production performances in active and completed longwall panels of coal mines , 2010 .

[47]  David L. Woodruff,et al.  A class of stochastic programs withdecision dependent random elements , 1998, Ann. Oper. Res..

[48]  Erik Demeulemeester,et al.  The proactive and reactive resource-constrained project scheduling problem , 2016, J. Sched..

[49]  Willy Herroelen,et al.  Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..

[50]  Lewis Ntaimo,et al.  Disjunctive Decomposition for Two-Stage Stochastic Mixed-Binary Programs with Random Recourse , 2010, Oper. Res..

[51]  R. Wets,et al.  L-SHAPED LINEAR PROGRAMS WITH APPLICATIONS TO OPTIMAL CONTROL AND STOCHASTIC PROGRAMMING. , 1969 .

[52]  Changzheng Liu,et al.  A two-stage stochastic programming model for transportation network protection , 2009, Comput. Oper. Res..

[53]  Robert Haining,et al.  Statistics for spatial data: by Noel Cressie, 1991, John Wiley & Sons, New York, 900 p., ISBN 0-471-84336-9, US $89.95 , 1993 .

[54]  Alexandra M. Newman,et al.  Using aggregation to optimize long-term production planning at an underground mine , 2007, Eur. J. Oper. Res..

[55]  Alexandra M. Newman,et al.  Consistent notation for presenting complex optimization models in technical writing , 2016 .

[56]  Erkan Topal,et al.  Implementing a Production Schedule at LKAB's Kiruna Mine , 2004, Interfaces.

[57]  Laureano F. Escudero,et al.  Medium range optimization of copper extraction planning under uncertainty in future copper prices , 2014, Eur. J. Oper. Res..

[58]  Roussos Dimitrakopoulos,et al.  Underground long-term mine production scheduling with integrated geological risk management , 2015 .