A real-time interaction platform for settlement control during shield tunnelling construction

Abstract Settlement control has always been the first concern for all the participants of shield tunnelling construction when the shield machine passes through buildings, especially in urban areas. However, owing to insufficient information communication of the participants, abnormal settlement usually results, against which reasonable settlement control measures are difficult to take. Therefore, a real-time mobile interaction and coordinated management platform was designed and developed with the instant messaging (IM) tool. The key ingredients of the platform are timely auto-sending of monitoring data and information flow in the coordinated management mechanism. The platform can inform all participants timely of the settlement as well as the tunneling situation. With this platform, problems encountered during shield tunnelling construction can be solved by IM group discussion. The real-time interaction platform has been validated and verified in the project of Nanning metro line 1 crossing beneath Nanning railway station, which realized the settlement control goal of a maximum value of −4 mm.

[1]  J. N. Shirlaw,et al.  LOCAL SETTLEMENTS AND SINKHOLES DUE TO EPB TUNNELLING , 2003 .

[2]  Chengping Zhang,et al.  An in-tunnel jacking above tunnel protection methodology for excavating a tunnel under a tunnel in service , 2013 .

[3]  Hanbin Luo,et al.  Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things , 2013 .

[4]  Shuai Li,et al.  A real-time monitoring system for lift-thickness control in highway construction , 2016 .

[5]  Berardo Naticchia,et al.  A monitoring system for real-time interference control on large construction sites , 2013 .

[6]  Silvio Savarese,et al.  Application of D4AR - A 4-Dimensional augmented reality model for automating construction progress monitoring data collection, processing and communication , 2009, J. Inf. Technol. Constr..

[7]  Nuria Forcada,et al.  A web-based system for sharing and disseminating research results: The underground construction case study , 2010 .

[8]  Bo Cui,et al.  Automatic control and real-time monitoring system for earth–rock dam material truck watering , 2013 .

[9]  Jianping Yang,et al.  Modelling analysis of the influence of shield crossing on deformation and force in a large diaphragm wall , 2018 .

[10]  Yun Bai,et al.  Key protection techniques adopted and analysis of influence on adjacent buildings due to the Bund Tunnel construction , 2014 .

[11]  Carlos Rodríguez-Domínguez,et al.  Dynamic Ontology-Based Redefinition of Events Intended to Support the Communication of Complex Information in Ubiquitous Computing , 2010, Netw. Protoc. Algorithms.

[12]  Chung Yee Kwok,et al.  Three-dimensional finite-element analysis on ground responses during twin-tunnel construction using the URUP method , 2016 .

[13]  Robert J. Mair,et al.  Tunnelling and geotechnics: new horizons , 2008 .

[14]  Hun Hee Cho,et al.  Development of a mobile safety monitoring system for construction sites , 2009 .

[15]  Wulf Schubert,et al.  The state of the art in monitoring and geotechnical safety management for shallow and deep tunnels , 2015 .

[16]  Ian F. C. Smith,et al.  Model Identification of Bridges Using Measurement Data , 2005 .

[17]  Jin-Jian Chen,et al.  Deformation Monitoring and Performance Analysis on the Shield Tunnel Influenced by Adjacent Deep Excavations , 2017 .

[18]  María Bermúdez-Edo,et al.  On the Effect of Adaptive and Nonadaptive Analysis of Time-Series Sensory Data , 2016, IEEE Internet of Things Journal.

[19]  Daniela Boldini,et al.  Tunnelling-induced deformation and damage on historical masonry structures , 2014 .

[20]  Shaoming Liao,et al.  Shield tunneling and environment protection in Shanghai soft ground , 2009 .

[21]  Robert J. Mair,et al.  SUBSURFACE SETTLEMENT PROFILES ABOVE TUNNELS IN CLAYS , 1993 .

[22]  George Zillante,et al.  Mobile Internet based construction supply chain management: A critical review , 2016 .

[23]  Simaan M. AbouRizk,et al.  A framework for an automated and integrated project monitoring and control system for steel fabrication projects , 2011 .

[24]  Lieyun Ding,et al.  Development of web-based system for safety risk early warning in urban metro construction , 2013 .

[25]  D. M. Bhalerao,et al.  MySQL and NoSQL database comparison for IoT application , 2016, 2016 IEEE International Conference on Advances in Computer Applications (ICACA).

[26]  Yubing Yang,et al.  Analysis of ground surface settlement induced by the construction of a large-diameter shield-driven tunnel in Shanghai, China , 2016 .

[27]  F Hegemann,et al.  An interaction platform for mechanized tunnelling. Application on the Wehrhahn‐Line in Düsseldorf (Germany) / Eine Interaktionsplattform für maschinelle Tunnelvortriebe. Anwendung am Beispiel der Wehrhahn‐Linie in Düsseldorf , 2014 .

[28]  Markus König,et al.  A tunnel information modelling framework to support management, simulations and visualisations in mechanised tunnelling projects , 2017 .

[29]  Stephen O. Ogunlana,et al.  A study on project success factors in large construction projects in Vietnam , 2004 .

[30]  Feng Yu,et al.  Key techniques and important issues for slurry shield under-passing embankments: A case study of Hangzhou Qiantang River Tunnel , 2013 .

[31]  Emilios M. Comodromos,et al.  Numerical Assessment of Subsidence and Adjacent Building Movements Induced by TBM-EPB Tunneling , 2014 .

[32]  Zhi-jian Chen,et al.  Settlement monitoring system of pile-group foundation , 2011 .

[33]  Xiangsheng Chen,et al.  Using Grouting of Shield Tunneling to Reduce Settlements of Overlying Tunnels: Case Study in Shenzhen Metro Construction , 2012 .

[34]  Berardo Naticchia,et al.  A proactive system for real-time safety management in construction sites , 2009 .

[35]  Albert P.C. Chan,et al.  Understanding the Determinants of Program Organization for Construction Megaproject Success: Case Study of the Shanghai Expo Construction , 2015 .

[36]  Xiaojun Li,et al.  Development of a web-based information system for shield tunnel construction projects , 2013 .

[37]  Xie Xiong-ya Deformation control of operating tunnels induced by deep excavation of overlying metro , 2014 .

[38]  Peter E.D. Love,et al.  Real time progress management: Re-engineering processes for cloud-based BIM in construction , 2015 .

[39]  Yasemin Nielsen,et al.  Wireless networking in tunnelling projects , 2007 .

[40]  Simon So,et al.  Mobile instant messaging support for teaching and learning in higher education , 2016, Internet High. Educ..

[41]  Zayyana Shehu,et al.  Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis , 2010 .

[42]  Li Xinggao,et al.  Response of a double-decked metro tunnel to shield driving of twin closely under-crossing tunnels , 2012 .

[43]  Ali Behnam,et al.  Automated progress monitoring system for linear infrastructure projects using satellite remote sensing , 2016 .

[44]  M. Chiorboli,et al.  Comparison of analytical method, 3D finite element model with experimental subsidence measurements resulting from the extension of the Milan underground , 2009 .

[45]  Tianqi Zhang,et al.  Mechanism and countermeasures of preceding tunnel distortion induced by succeeding EPBS tunnelling in close proximity , 2015 .

[46]  Harry G. Poulos,et al.  Analytical Prediction for Tunneling-Induced Ground Movements in Clays , 1998 .