AN INTELLIGENT ENVIRONMENT FOR SIMULATING MECHANICAL ASSEMBLY OPERATIONS
暂无分享,去创建一个
Satyandra K. Gupta | Peter F. Brown | Rajarishi Sinha | P. F. Brown | Cheng-Hua Wang | Satyandra K. Gupta | Rajarishi S. Sinha | Cheng-Hua Wang
[1] Daniel E. Whitney,et al. Aids for the design or choice of assembly sequences , 1989, Conference Proceedings., IEEE International Conference on Systems, Man and Cybernetics.
[2] Arthur C. Sanderson,et al. A correct and complete algorithm for the generation of mechanical assembly sequences , 1991, IEEE Trans. Robotics Autom..
[3] Kiam Tian Seow,et al. A temporal framework for assembly sequence representation and analysis , 1994, IEEE Trans. Robotics Autom..
[4] Arthur C. Sanderson,et al. A correct and complete algorithm for the generation of mechanical assembly sequences , 1989, Proceedings, 1989 International Conference on Robotics and Automation.
[5] Christiaan J. J. Paredis,et al. Micro planning for mechanical assembly operations , 1998, Proceedings. 1998 IEEE International Conference on Robotics and Automation (Cat. No.98CH36146).
[6] Kunwoo Lee,et al. A hierarchical data structure for representing assemblies: part I , 1985 .
[7] Jami J. Shah,et al. Assembly modeling as an extension of feature-based design , 1993 .
[8] Sukhan Lee,et al. Combining assembly planning with redesign: an approach for more effective DFA , 1993, [1993] Proceedings IEEE International Conference on Robotics and Automation.
[9] Mark H. Overmars,et al. A probabilistic learning approach to motion planning , 1995 .
[10] Stephen C. Graves,et al. Using simulated annealing to select least-cost assembly sequences , 1994, Proceedings of the 1994 IEEE International Conference on Robotics and Automation.
[11] Mark John. Jakiela. Intelligent suggestive CAD systems , 1988 .
[12] A. Diaz-Calderon,et al. Measuring the difficulty of assembly tasks from tool access information , 1995, Proceedings. IEEE International Symposium on Assembly and Task Planning.
[13] Satyandra K. Gupta,et al. Automated Manufacturability Analysis of Machined Parts , 1995 .
[14] K. Suzanne Barber,et al. APE: an experience-based assembly sequence planner for mechanical assemblies , 1995, Proceedings of 1995 IEEE International Conference on Robotics and Automation.
[15] Randall H. Wilson,et al. A framework for geometric reasoning about tools in assembly , 1996, Proceedings of IEEE International Conference on Robotics and Automation.
[16] Dinesh Manocha,et al. OBBTree: a hierarchical structure for rapid interference detection , 1996, SIGGRAPH.
[17] Geoffrey Boothroyd,et al. Product design for manufacture and assembly , 1994, Comput. Aided Des..
[18] Pradeep K. Khosla,et al. Determining the assembly sequence from a 3-D model☆ , 1989 .
[19] H.S. Cho,et al. Disassemblability analysis for generating robotic assembly sequences , 1995, Proceedings of 1995 IEEE International Conference on Robotics and Automation.
[20] Wynne Hsu,et al. Feedback evaluation of assembly plans , 1992, Proceedings 1992 IEEE International Conference on Robotics and Automation.