Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments
暂无分享,去创建一个
Patricio A. Vela | Manu Venugopal | Tao Cheng | Jochen Teizer | P. Vela | M. Venugopal | J. Teizer | T. Cheng
[1] Tetsuo Tomiyama,et al. Advanced Engineering Informatics , 2007, Adv. Eng. Informatics.
[2] Ronie Navon,et al. Monitoring labor inputs: automated-data-collection model and enabling technologies , 2003 .
[3] Saiedeh Razavi,et al. An implementation model for automated construction materials tracking and locating , 2010 .
[4] J. Barney,et al. Commercialization of an ultra wideband precision asset location system , 2003, IEEE Conference on Ultra Wideband Systems and Technologies, 2003.
[5] John M. Evans,et al. Automation in construction , 1986, Robotics.
[6] Zeljko M. Durovic,et al. Robust estimation with unknown noise statistics , 1999, IEEE Trans. Autom. Control..
[7] Miroslaw J. Skibniewski,et al. Simulation of Accuracy Performance for Wireless Sensor-Based Construction Asset Tracking , 2009, Comput. Aided Civ. Infrastructure Eng..
[8] A. Ameti,et al. Recent advances in ultra wideband communications systems , 2002, 2002 IEEE Conference on Ultra Wideband Systems and Technologies (IEEE Cat. No.02EX580).
[9] Burcu Akinci,et al. Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS , 2007 .
[10] B. R. Badrinath,et al. DV Based Positioning in Ad Hoc Networks , 2003, Telecommun. Syst..
[11] Carlos H. Caldas,et al. A proximity-based method for locating RFID tagged objects , 2007, Adv. Eng. Informatics.
[12] Lucio Soibelman,et al. Shape-Based Retrieval of Construction Site Photographs , 2008 .
[13] Rafael Sacks,et al. Relative Productivity in the AEC Industries in the United States for On-Site and Off-Site Activities , 2008 .
[14] Jeffrey S. Bohn,et al. Construction Project Monitoring Using High-Resolution Automated Cameras , 2010 .
[15] G. G. Stokes. "J." , 1890, The New Yale Book of Quotations.
[16] Jochen Teizer,et al. LEVERAGING PASSIVE RADIO FREQUENCY IDENTIFICATION TECHNOLOGY IN HIGH-RISE RENOVATION PROJECTS , 2010 .
[17] Martin T. Pietrucha,et al. FIELD STUDIES OF PEDESTRIAN WALKING SPEED AND START-UP TIME , 1996 .
[18] Ronie Navon,et al. An automated model for materials management and control , 2006 .
[19] Jie Gong,et al. Computer Vision-Based Video Interpretation Model for Automated Productivity Analysis of Construction Operations , 2010 .
[20] Jimmie Hinze,et al. Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system , 2010 .
[21] Paul M. Goodrum,et al. Assessing the impact of materials tracking technologies on construction craft productivity , 2009 .
[22] Carlos H. Caldas,et al. Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources , 2007 .
[23] R.J. Fontana,et al. Recent system applications of short-pulse ultra-wideband (UWB) technology , 2004, IEEE Transactions on Microwave Theory and Techniques.
[24] Jochen Teizer,et al. Visibility-related fatalities related to construction equipment , 2011 .
[25] J. Teizer,et al. Madras RAPID AUTOMATED MONITORING OF CONSTRUCTION SITE ACTIVITIES USING ULTRA-WIDEBAND , 2007 .
[26] Carlos H. Caldas,et al. Tracking the Location of Materials on Construction Job Sites , 2006 .
[27] P. R. Bevington,et al. Data Reduction and Error Analysis for the Physical Sciences , 1969 .
[28] Vineet R. Kamat,et al. Evaluation of position tracking technologies for user localization in indoor construction environments , 2009 .
[29] Rafael Sacks,et al. Building Project Model Support for Automated Labor Monitoring , 2003 .
[30] Burcu Akinci,et al. Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects , 2006 .
[31] Patricio A. Vela,et al. Personnel tracking on construction sites using video cameras , 2009, Adv. Eng. Informatics.
[32] Dong Zhai,et al. Model to Predict the Impact of a Technology on Construction Productivity , 2011 .
[33] Dong Zhai,et al. Relationship between Changes in Material Technology and Construction Productivity , 2009 .
[34] Kamel S. Saidi,et al. Static and dynamic performance evaluation of a commercially-available ultra wideband tracking system , 2011 .
[35] Paul M. Goodrum,et al. Analysis of Observed Skill Affinity Patterns and Motivation for Multiskilling among Craft Workers in the U.S. Industrial Construction Sector , 2009 .
[36] Yong K. Cho,et al. Error modeling for an untethered ultra-wideband system for construction indoor asset tracking , 2010 .
[37] Manu Venugopal,et al. Ultrawideband for Automated Real-Time Three-Dimensional Location Sensing for Workforce, Equipment, and Material Positioning and Tracking , 2008 .
[38] Yvan J. Beliveau,et al. Automated Lay-Down Yard Control System—ALYC , 1989 .
[39] Paramvir Bahl,et al. RADAR: an in-building RF-based user location and tracking system , 2000, Proceedings IEEE INFOCOM 2000. Conference on Computer Communications. Nineteenth Annual Joint Conference of the IEEE Computer and Communications Societies (Cat. No.00CH37064).
[40] Rafael Sacks,et al. Assessing research issues in Automated Project Performance Control (APPC) , 2007 .
[41] Chimay J. Anumba,et al. Editorial - Sensors in Construction and Infrastructure Management , 2008, J. Inf. Technol. Constr..
[42] Abdelhakim Hafid,et al. High accuracy localization method using AoA in sensor networks , 2009, Comput. Networks.
[43] Kamel S. Saidi,et al. Methods for Static and Dynamic Performance Evaluation of Commercially-Available Ultra Wideband Tracking Systems | NIST , 2010 .
[44] Jan M. Rabaey,et al. PicoRadio Supports Ad Hoc Ultra-Low Power Wireless Networking , 2000, Computer.
[45] John D. Borcherding,et al. Improving Productivity in Industrial Construction , 1976 .
[46] Carlos H. Caldas,et al. Methodology for Automating the Identification and Localization of Construction Components on Industrial Projects , 2009 .
[47] Jochen Teizer,et al. Automating the blind spot measurement of construction equipment , 2010 .
[48] I. Iervolino,et al. Computer Aided Civil and Infrastructure Engineering , 2009 .