Heuristics for flow-shop scheduling
暂无分享,去创建一个
[1] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[2] E. S. Page. An Approach to the Scheduling of Jobs on Machines , 1961 .
[3] D. S. Palmer. Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum , 1965 .
[4] Z. A. Lomnicki. A “Branch-and-Bound” Algorithm for the Exact Solution of the Three-Machine Scheduling Problem , 1965 .
[5] Z. A. Lomnicki,et al. Some Applications of the “Branch-and-Bound” Algorithm to the Machine Scheduling Problem , 1966 .
[6] G. B. McMahon,et al. Flow-Shop Scheduling with the Branch-and-Bound Method , 1967, Oper. Res..
[7] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[8] Stephen A. Cook,et al. The complexity of theorem-proving procedures , 1971, STOC.
[9] D. A. Wismer,et al. Solution of the Flowshop-Scheduling Problem with No Intermediate Queues , 1972, Oper. Res..
[10] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[11] Maurice Bonney,et al. Solutions to the Constrained Flowshop Sequencing Problem , 1976 .
[12] N. A. J. Hastings,et al. A New Bound for Machine Scheduling , 1976 .
[13] David G. Dannenbring,et al. An Evaluation of Flow Shop Sequencing Heuristics , 1977 .
[14] Jr King. Scheduling and the problem of computational complexity , 1979 .