DT-bottlenecks in serial production lines: theory and application

The bottleneck (BN) of a production line is a machine that impedes the system's performance in the strongest manner. It has been shown in previous work that the so-called downtime bottlenecks (DT-BNs) are of main industrial importance. In this paper, a method for DT-BN identification is developed in the framework of serial production lines with unreliable (Markovian) machines and finite buffers. The identification tool derived is based on the probabilities of machine blockages and starvations. To evaluate these probabilities, a novel aggregation technique is proposed. The results obtained are applied to the design of a production line at an automotive component plant.

[1]  J. George Shanthikumar,et al.  On optimal arrangement of stations in a tandem queueing system with blocking , 1992 .

[2]  Jong-Tae Lim,et al.  Bottlenecks in serial production lines: A system-theoretic approach , 1996 .

[3]  Semyon M. Meerkov,et al.  Bottlenecks in Markovian production lines: a systems approach , 1998, IEEE Trans. Robotics Autom..

[4]  E. Muth The Reversibility Property of Production Lines , 1979 .

[5]  D. Taghirad Ieee Transactions on Robotics and Automation 1 Robust Torque Control of Harmonic Drive Systems , 1997 .

[6]  Semyon M. Meerkov,et al.  Bottlenecks in Markovian production lines: identification and application , 1998, Proceedings of the 37th IEEE Conference on Decision and Control (Cat. No.98CH36171).

[7]  Y. C. Ho,et al.  A New Approach to Determine Parameter Sensitivities of Transfer Lines , 1983 .

[8]  Xi-Ren Cao,et al.  Perturbation analysis of discrete event dynamic systems , 1991 .

[9]  B. A. Sevast'yanov Influence of Storage Bin Capacity on the Average Standstill Time of a Production Line , 1962 .

[10]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[11]  S. Fotopoulos Stochastic modeling and analysis of manufacturing systems , 1996 .

[12]  R. Suri,et al.  Perturbation analysis: the state of the art and research issues explained via the GI/G/1 queue , 1989, Proc. IEEE.

[13]  J.-T. Lim,et al.  Homogeneous, asymptotically reliable serial production lines: theory and a case study , 1990 .

[14]  Frederick S. Hillier,et al.  On the optimal design of tandem queueing systems with finite buffers , 1995, Queueing Syst. Theory Appl..

[15]  Semyon M. Meerkov,et al.  A system-theoretic property of serial production lines: improvability , 1993, Proceedings of 32nd IEEE Conference on Decision and Control.

[16]  Bengt Lennartson,et al.  Performance modeling of automated manufacturing systems , 1995, Autom..

[17]  Xiaolan Xie,et al.  Approximate analysis of transfer lines with unreliable machines and finite buffers , 1989 .

[18]  Yves Dallery,et al.  Manufacturing flow line systems: a review of models and analytical results , 1992, Queueing Syst. Theory Appl..