Integrating Standardized Work and Production Status Control to Support Location-Based Planning and Control

Standardized Work (SW) is an approach to standardize and improve the efficiency of operations cycles. SW can support the implementation of Location-Based Planning and Control (LBPC) by balancing workload between workers, synchronizing different processes and allowing early identification of deviations. Digital technologies can support the implementation of SW by providing real-time feedback to support project monitoring, communication, and information management. The aim of this research work is to propose a model that integrates SW and production status control by using existing digital technologies to support LBPC. Design Science Research (DSR) is the methodological approach adopted in this investigation. The study initially focused on the collaborative identification of critical interrelated activities to implement SW. Then the integrated control model of SW and production status was proposed with the support of visual management devices and digital technologies. As a result, it was possible to effectively synchronize and balance the resources of a set of interrelated activities, increasing the stability of those activities. Therefore, the model can be used as a mechanism to manage variability in LBPC and increase the degree of process standardization while having short cycles of feedback to promote continuous improvement.

[1]  I. Tommelein,et al.  Takt Planning: An Enabler for Lean Construction , 2022, Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC).

[2]  Olli Seppänen,et al.  How takt production contributes to construction production flow: a theoretical model , 2020, Construction Management and Economics.

[3]  Olli Seppänen,et al.  Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques , 2019 .

[4]  Marcus C. T. Fireman,et al.  The Role of Slack in Standardized Work in Construction: An Exploratory Study , 2018, 26th Annual Conference of the International Group for Lean Construction.

[5]  Markus König,et al.  Interior construction state recognition with 4D BIM registered image sequences , 2018 .

[6]  Marco Binninger,et al.  Technical Takt Planning and Takt Control in Construction. , 2017 .

[7]  Angela de Bortoli Saggin,et al.  Standardized Work: Practical Examples in a Brazilian Construction Company , 2017 .

[8]  Magdalena Hajdasz,et al.  Flexible management of repetitive construction processes by an intelligent support system , 2014, Expert Syst. Appl..

[9]  David Bryde,et al.  The project benefits of Building Information Modelling (BIM) , 2013 .

[10]  Renato Nunes Mariz,et al.  Método para aplicação do trabalho padronizado em serviços de construção , 2012 .

[11]  Silvio Savarese,et al.  Monitoring changes of 3D building elements from unordered photo collections , 2011, 2011 IEEE International Conference on Computer Vision Workshops (ICCV Workshops).

[12]  Timothy Martin,et al.  New Horizons in Standardized Work: Techniques for Manufacturing and Business Process Improvement , 2011 .

[13]  Hyojoo Son,et al.  3D structural component recognition and modeling method using color and 3D data for construction progress monitoring , 2010 .

[14]  Jan Holmström,et al.  Bridging Practice and Theory: A Design Science Approach , 2009, Decis. Sci..

[15]  Rosemary R. Fullerton,et al.  Lean Manufacturing, Non-Financial Performance Measures, and Financial Performance , 2009 .

[16]  Gregory Howell,et al.  The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.

[17]  R. Wears Resilience Engineering: Concepts and Precepts , 2006 .

[18]  Roberto dos Reis Alvarez,et al.  Takt-time: conceitos e contextualização dentro do Sistema Toyota de Produção , 2001 .

[19]  Salvatore T. March,et al.  Design and natural science research on information technology , 1995, Decis. Support Syst..

[20]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[21]  Carlos Torres Formoso,et al.  The Role of Production System Design in the Management of Complex Projects , 2006 .

[22]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[23]  K. Lukka,et al.  The constructive approach in management accounting research , 1993 .