Priority mix planning for semiconductor fabrication by fuzzy AHP ranking

[1]  C. E. SHANNON,et al.  A mathematical theory of communication , 1948, MOCO.

[2]  E. Jaynes Information Theory and Statistical Mechanics , 1957 .

[3]  Aldo de Luca,et al.  Fuzzy Sets and Decision Theory , 1973, Inf. Control..

[4]  H. Kunzi,et al.  Lectu re Notes in Economics and Mathematical Systems , 1975 .

[5]  Peter Nijkamp,et al.  Stochastic quantitative and qualitative multicriteria analysis for environmental design , 1977 .

[6]  C. Hwang Multiple Objective Decision Making - Methods and Applications: A State-of-the-Art Survey , 1979 .

[7]  Ching-Lai Hwang,et al.  Multiple Attribute Decision Making: Methods and Applications - A State-of-the-Art Survey , 1981, Lecture Notes in Economics and Mathematical Systems.

[8]  W. Pedrycz,et al.  A fuzzy extension of Saaty's priority theory , 1983 .

[9]  A. Kaufmann,et al.  Introduction to fuzzy arithmetic : theory and applications , 1986 .

[10]  Caroline M. Eastman,et al.  Response: Introduction to fuzzy arithmetic: Theory and applications : Arnold Kaufmann and Madan M. Gupta, Van Nostrand Reinhold, New York, 1985 , 1987, Int. J. Approx. Reason..

[11]  Shigeaki Mabuchi,et al.  An approach to the comparison of fuzzy subsets with an α-cut dependent index , 1988, IEEE Trans. Syst. Man Cybern..

[12]  E. Lee,et al.  Comparison of fuzzy numbers based on the probability measure of fuzzy events , 1988 .

[13]  F. A. Lootsma,et al.  Multicriteria decision analysis with fuzzy pairwise comparisons , 1989 .

[14]  Ching-Lai Hwang,et al.  Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.

[15]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[16]  R. G. Petrakian,et al.  Trade-offs in cycle time management: hot lots , 1992 .

[17]  Mao-Jiun J. Wang,et al.  Personnel selection using fuzzy MCDM algorithm , 1994 .

[18]  Don-lin Mon,et al.  Evaluating weapon system by Analytical Hierarchy Process based on fuzzy scales , 1994 .

[19]  Robert W. Atherton,et al.  Wafer Fabrication: Factory Performance and Analysis , 1995 .

[20]  Ching-Hsue Cheng,et al.  Application of fuzzy distributions on project management , 1995 .

[21]  George J. Klir,et al.  Fuzzy sets and fuzzy logic - theory and applications , 1995 .

[22]  Shyi-Ming Chen,et al.  Evaluating weapon systems using fuzzy arithmetic operations , 1996, Fuzzy Sets Syst..

[23]  D. Fronckowiak,et al.  Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing , 1996, IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings.

[24]  Ching-Hsue Cheng Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function , 1997 .

[25]  Yadati Narahari,et al.  Modeling the effect of hot lots in semiconductor manufacturing systems , 1997 .

[26]  D.A. Hodges,et al.  Benchmarking Semiconductor Manufacturing , 1997, 27th European Solid-State Device Research Conference.

[27]  Ching-Hsue Cheng,et al.  Evaluating weapon systems using ranking fuzzy numbers , 1999, Fuzzy Sets Syst..

[28]  Hsing-Pei Kao,et al.  Rating the importance of customer needs in quality function deployment by fuzzy and entropy methods , 1999 .

[29]  Umit Bititci,et al.  Quantitative models for performance measurement system , 2000 .

[30]  Umit Bititci,et al.  Strategy Management through Quantitative Modelling of Performance Measurement Systems , 2001 .

[31]  G. Liang,et al.  Application of a fuzzy multi-criteria decision-making model for shipping company performance evaluation , 2001 .

[32]  R. J. Kuo,et al.  A decision support system for selecting convenience store location through integration of fuzzy AHP and artificial neural network , 2002, Comput. Ind..

[33]  Chian-Son Yu,et al.  A GP-AHP method for solving group decision-making fuzzy AHP problems , 2002, Comput. Oper. Res..

[34]  Wen Lea Pearn,et al.  Job order releasing and throughput planning for multi-priority orders in wafer fabs , 2003 .

[35]  C K Kwong,et al.  Determining the Importance Weights for the Customer Requirements in QFD Using a Fuzzy AHP with an Extent Analysis Approach , 2003 .

[36]  Ching-Hsue Cheng,et al.  Selecting IS personnel use fuzzy GDSS based on metric distance method , 2005, Eur. J. Oper. Res..

[37]  Wen Lea Pearn,et al.  Analytic network process (ANP) approach for product mix planning in semiconductor fabricator , 2005 .

[38]  Chen-Fu Chien,et al.  An AHP-based approach to ERP system selection , 2005 .

[39]  Amy Hsin-I Lee,et al.  Analysis of priority mix planning for semiconductor fabrication under uncertainty , 2006 .

[40]  Sang Joon Kim,et al.  A Mathematical Theory of Communication , 2006 .