Assembly system design and operations for product variety

Abstract Assembly is the capstone process for product realization where component parts and subassemblies are integrated together to form the final products. As product variety increases due to the shift from mass production to mass customization, assembly systems must be designed and operated to handle such high variety. In this paper we first review the state of the art research in the areas of assembly system design, planning and operations in the presence of product variety. Methods for assembly representation, sequence generation and assembly line balancing are reviewed and summarized. Operational complexity and the role of human operators in assembly systems are then discussed in the context of product variety. Challenges in disassembly and remanufacturing in the presence of high variety are presented. We then conjecture a future manufacturing paradigm of personalized products and production and discuss the assembly challenge for such a paradigm. Opportunities for assembly system research are summarized at the end of the paper.

[1]  Andreas Nobs,et al.  Modular design of after-sales service provision systems; 3rd International Conference on Changeable, Agile, Reconfigurable and Virtual (CARV 2009); ; 3rd International Conference on Changeable, Agile, Reconfigurable and Virtual Production (CARV 2009), Munich, Germany, October 5th-7th, 2009 : Book of , 2009 .

[2]  Jyh-Cheng Yu,et al.  The structure representation for the concurrent analysis of product assembly and disassembly , 2005, Proceedings of the Ninth International Conference on Computer Supported Cooperative Work in Design, 2005..

[3]  Hsi-Mei Hsu,et al.  Dynamic programming for delayed product differentiation , 2004, Eur. J. Oper. Res..

[4]  Peter Nyhuis,et al.  Changeable Manufacturing - Classification, Design and Operation , 2007 .

[5]  Oleg Yurievitch Gusikhin,et al.  Optimization of workcell layouts in a mixed-model assembly line environment , 2005 .

[6]  Yoram Koren,et al.  The Global Manufacturing Revolution: Product-Process-Business Integration and Reconfigurable Systems , 2010 .

[7]  Glen Mullineux,et al.  CIRP International seminar on manufacturing systems , 2006 .

[8]  Hoda A. ElMaraghy,et al.  Assembly sequences planning for simultaneous engineering applications , 1994 .

[9]  Jaime A. Camelio,et al.  Multiple Fault Diagnosis for Sheet Metal Fixtures Using Designated Component Analysis , 2004 .

[10]  George Chryssolouris,et al.  Quantifying the flexibility of a manufacturing system by applying the transfer function , 2007, Int. J. Comput. Integr. Manuf..

[11]  Patrick R. McMullen,et al.  A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations , 1997 .

[12]  Ningjian Huang,et al.  Modelling and analysis of a multiple product manufacturing system with split and merge , 2005 .

[13]  Hau L. Lee,et al.  Design for Postponement , 2003, Supply Chain Management.

[14]  C. A. van Luttervelt,et al.  The Use of Heuristics in Assembly Sequence Planning , 1989 .

[15]  Sittichai Matanachai,et al.  Balancing mixed-model assembly lines to reduce work overload , 2001 .

[16]  Hadi Gökçen,et al.  A goal programming approach to mixed-model assembly line balancing problem , 1997 .

[17]  Yoram Koren,et al.  Impact of Manufacturing System Configuration on Performance , 1998 .

[18]  P. Radhakrishnan,et al.  Collaborative product structure management for assembly modeling , 2008, Comput. Ind..

[19]  B. Nickolay,et al.  Image based 3D surveillance for flexible man-robot-cooperation , 2005 .

[20]  Ming Zhou,et al.  A parallel station heuristic for the mixed-model production line balancing problem , 1997 .

[21]  Hadi Gökçen,et al.  Binary integer formulation for mixed-model assembly line balancing problem , 1998 .

[22]  Timothy W. Simpson,et al.  Product family design knowledge representation, aggregation, reuse, and analysis , 2007, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[23]  Christopher S. Tang,et al.  On postponement strategies for product families with multiple points of differentiation , 1997 .

[24]  Christine Solnon,et al.  The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem , 2008, Eur. J. Oper. Res..

[25]  Sotiris Makris,et al.  Supply chain modeling and control for producing highly customized products , 2008 .

[26]  Sotiris Makris,et al.  A toolbox approach for flexibility measurements in diverse environments , 2007 .

[27]  Helmut Bley,et al.  Variant-oriented Assembly Planning , 2006 .

[28]  Hoda A. ElMaraghy A Complexity Code for Manufacturing Systems , 2006 .

[29]  Maurizio Faccio,et al.  Balancing–sequencing procedure for a mixed model assembly system in case of finite buffer capacity , 2009 .

[30]  E A Duplaga,et al.  Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis , 1998 .

[31]  George Chryssolouris,et al.  Modelling the complexity of manufacturing systems using nonlinear dynamics approaches , 2009 .

[32]  Hui Wang,et al.  Manufacturing complexity in assembly systems with hybrid configurations and its impact on throughput , 2010 .

[33]  Timothy W. Simpson,et al.  Product platform design and customization: Status and promise , 2004, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[34]  Yoram Koren,et al.  Design of reconfigurable manufacturing systems , 2010 .

[35]  Mitchell M. Tseng,et al.  Product family modeling for mass customization , 1998 .

[36]  Emanuel Falkenauer,et al.  Line Balancing in the Real World , 2005 .

[37]  T. K. Lien,et al.  Hybrid Automatic-manual Assembly Systems , 2001 .

[38]  Tianyuan Xiao,et al.  Mixed model assembly line balancing problem with fuzzy operation times and drifting operations , 2008, 2008 Winter Simulation Conference.

[39]  Bruno Agard,et al.  Improvement of earliness and lateness by postponement on an automotive production line , 2007 .

[40]  Hon-Shiang Lau,et al.  A balancing problem for mixed model assembly lines with a paced moving conveyor , 2004 .

[41]  A. Noorul Haq,et al.  A hybrid genetic algorithm approach to mixed-model assembly line balancing , 2006 .

[42]  Sotiris Makris,et al.  Customer's behaviour modelling for manufacturing planning , 2010, Int. J. Comput. Integr. Manuf..

[43]  S. David Wu,et al.  A new heuristic method for mixed model assembly line balancing problem , 2003 .

[44]  Arthur C. Sanderson,et al.  AND/OR graph representation of assembly plans , 1986, IEEE Trans. Robotics Autom..

[45]  Ana S. Simaria,et al.  A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II , 2004, Comput. Ind. Eng..

[46]  M. Slipitalni,et al.  Practical Number of Paths in Reconfigurable Manufacturing Systems With Crossovers , 2004 .

[47]  W. S. Lau,et al.  ON THE AUTOMATIC GENERATION OF PRODUCT ASSEMBLY SEQUENCES , 1998 .

[48]  Michel Tollenaere,et al.  Modular and platform methods for product family design: literature analysis , 2005, J. Intell. Manuf..

[49]  Armin Jabbarzadeh,et al.  A new approach to solve a mixed-model assembly line with a bypass subline sequencing problem , 2011 .

[50]  H. Bley,et al.  Risikoreduzierte Endmontageplanung am Beispiel der Automobilindustrie , 2010 .

[51]  Alexander Verl,et al.  Cooperation of human and machines in assembly lines , 2009 .

[52]  Hoda A. ElMaraghy,et al.  Flexible and reconfigurable manufacturing systems paradigms , 2005 .

[53]  Yoram Koren,et al.  Product variety and manufacturing complexity in assembly systems and supply chains , 2008 .

[54]  W. Zinn Should you assemble products before an order is received , 1990 .

[55]  Kazem Abhary,et al.  Assembly sequence planning and optimisation using genetic algorithms: Part I. Automatic generation of feasible assembly sequences , 2003, Appl. Soft Comput..

[56]  George Chryssolouris,et al.  A virtual reality-based experimentation environment for the verification of human-related factors in assembly processes , 2000 .

[57]  Pradeep K. Khosla,et al.  Determining the assembly sequence from a 3-D model☆ , 1989 .

[58]  Li Tang,,et al.  Concurrent Line-Balancing, Equipment Selection and Throughput Analysis for Multi-Part Optimal Line Design , 2004 .

[59]  Norbert Leopold Ein Planungsverfahren zur Kapazitätsabstimmung für Modell-Mix-Montagelinien am Beispiel einer Automobil-Endmontage , 1997 .

[60]  Ahmed Azab,et al.  Mathematical Modeling for Reconfigurable Process Planning , 2007 .

[61]  Yossi Bukchin,et al.  A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs , 2006, Eur. J. Oper. Res..

[62]  Alin Albu-Schäffer,et al.  The DLR lightweight robot: design and control concepts for robots in human environments , 2007, Ind. Robot.

[63]  Nils Boysen,et al.  A classification of assembly line balancing problems , 2007, Eur. J. Oper. Res..

[64]  Kyoung-Yun Kim,et al.  Mereotopological assembly joint information representation for collaborative product design , 2008 .

[65]  Roger Jianxin Jiao,et al.  A methodology of developing product family architecture for mass customization , 1999, J. Intell. Manuf..

[66]  Ashok Kumar,et al.  From mass customization to mass personalization: a strategic transformation , 2007 .

[67]  Oleg Gusikhin,et al.  Optimization of workcell layouts in mixed-model assembly line environment , 2007 .

[68]  S. Jack Hu,et al.  Productivity of parallel production lines with unreliable Machines and material handling , 2004, IEEE Transactions on Automation Science and Engineering.

[69]  Moshe Shpitalni,et al.  An approach to the automatic assembly planning problem , 1990 .

[70]  Bernd Scholz-Reiter,et al.  CIRP Annals - Manufacturing Technology , 2010 .

[71]  Arthur C. Sanderson,et al.  A correct and complete algorithm for the generation of mechanical assembly sequences , 1991, IEEE Trans. Robotics Autom..

[72]  Yoram Koren,et al.  Co-Evolution of Product Families and Assembly Systems , 2007 .

[73]  S. N. Samy,et al.  A model for measuring complexity of automated and hybrid assembly systems , 2012 .

[74]  T N Dhamala,et al.  A BRIEF SURVEY OF JUST-IN-TIME SEQUENCING FOR MIXEDMODEL SYSTEMS , 2005 .

[75]  Anna Maria Coves Moreno,et al.  The United States industrial organization pattern in mixed-model-assembly-line , 2005 .

[76]  West Midlands,et al.  SPECIES—Co-evolution of products, processes and production systems , 2010 .

[77]  Joaquín Bautista,et al.  MINIMIZING WORK OVERLOAD IN MIXED-MODEL ASSEMBLY LINES , 2008 .

[78]  Blaine Lilly,et al.  Mechanical Assemblies: their Design, Manufacture, and Role in Product Development , 2013 .

[79]  Hoda A. ElMaraghy,et al.  Assessing the structural complexity of manufacturing systems configurations , 2007 .

[80]  Christian Zenner,et al.  Durchgängiges Variantenmanagement in der Technischen Produktionsplanung , 2006 .

[81]  Helmut Bley,et al.  Appropriate Human Involvement in Assembly and Disassembly , 2004 .

[82]  P. Spicer *,et al.  Scalable reconfigurable equipment design principles , 2005 .

[83]  Li Chen,et al.  Internet-enabled real-time collaborative assembly modeling via an e-Assembly system: status and promise , 2004, Comput. Aided Des..

[84]  J.U. Turner,et al.  Constraint representation and reduction in assembly modeling and analysis , 1992, IEEE Trans. Robotics Autom..

[85]  Alain Delchambre,et al.  An assembly-oriented product family representation for integrated design , 2003, IEEE Trans. Robotics Autom..

[86]  Jayashankar M. Swaminathan,et al.  Managing broader product lines through delayed differentiation using vanilla boxes , 1998 .

[87]  Beatrice Lazzerini,et al.  Generation of Optimized Assembly Sequences Using Genetic Algorithms , 1999 .

[88]  George L. Nemhauser,et al.  Handbooks in operations research and management science , 1989 .

[89]  Issachar Gilad,et al.  About the Efficiency and Cost Reduction of Parallel Mixed-Model Assembly Lines , 2007 .

[90]  Hui Wang,et al.  Automatic generation of assembly system configuration with equipment selection for automotive battery manufacturing , 2011 .

[91]  Thomas L. DeFazio,et al.  An integrated computer aid for generating and evaluating assembly sequences for mechanical products , 1991, IEEE Trans. Robotics Autom..

[92]  Moshe M. Barash,et al.  Complexity in manufacturing systems, Part 1: Analysis of static complexity , 1998 .

[93]  Thomas L. DeFazio,et al.  Simplified generation of all mechanical assembly sequences , 1987, IEEE Journal on Robotics and Automation.

[94]  Hmh Herman Hegge,et al.  Generic bill-of-material: a new product model , 1991 .

[95]  Saurabh Gupta,et al.  Product family-based assembly sequence design methodology , 1998 .

[96]  Sai Cheong Fok,et al.  Integrated intelligent design and assembly planning: A survey , 1998 .

[97]  R. Hyman Stimulus information as a determinant of reaction time. , 1953, Journal of experimental psychology.

[98]  Suh Nam-pyo,et al.  Complexity: Theory and Applications , 2005 .

[99]  Roger Jianxin Jiao,et al.  Product family design and platform-based product development: a state-of-the-art review , 2007, J. Intell. Manuf..

[100]  Mei Zhang,et al.  A Product and Process Modeling Based Approach to Study Cost Implications of Product Variety in Mass Customization , 2007, IEEE Transactions on Engineering Management.

[101]  Yoram Koren,et al.  Convertibility Measures for Manufacturing Systems , 2003 .

[102]  Rolf Drechsler,et al.  Applications of Evolutionary Computing, EvoWorkshops 2008: EvoCOMNET, EvoFIN, EvoHOT, EvoIASP, EvoMUSART, EvoNUM, EvoSTOC, and EvoTransLog, Naples, Italy, March 26-28, 2008. Proceedings , 2008, EvoWorkshops.

[103]  Mikell P. Groover,et al.  Automation, Production Systems, and Computer-Integrated Manufacturing , 1987 .

[104]  Satoshi Kanai,et al.  ASPEN: Computer-Aided Assembly Sequence Planning and Evaluation System Based on Predetermined Time Standard , 1996 .

[105]  G. Seliger,et al.  Development of Hybrid Assembly Workplaces , 2007 .

[106]  H. Fujimoto,et al.  Entropic evaluation of assemblability in concurrent approach to assembly planning , 2001, Proceedings of the 2001 IEEE International Symposium on Assembly and Task Planning (ISATP2001). Assembly and Disassembly in the Twenty-first Century. (Cat. No.01TH8560).

[107]  W. H. Elmaraghy,et al.  Integrating asembly planning and scheduling - CAPP-related issues , 1992 .

[108]  Hisayoshi Sato,et al.  Development of Silica Polyvinyl Alcohol Wheels for Wet Mirror Grinding of Silicon Wafer , 2007 .

[109]  Sudarsan Rachuri,et al.  An ontology for assembly representation , 2007 .

[110]  Anders Thorstenson,et al.  A procedure-oriented generic bill of materials , 1997 .

[111]  Kathryn E. Stecke,et al.  Analysis of automotive body assembly system configurations for quality and productivity , 2009, Int. J. Manuf. Res..

[112]  Jörg Krüger,et al.  Intelligent Assist Systems for Flexible Assembly , 2006 .

[113]  S. Jack Hu,et al.  Productivity of Paced Parallel-Serial Manufacturing Lines With and Without Crossover , 2004 .

[114]  Jeonghan Ko,et al.  Manufacturing System Design Considering Stochastic Product Evolution and Task Recurrence , 2009 .

[115]  J. Miltenberg,et al.  Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .

[116]  Christopher S. Tang,et al.  Modelling the Costs and Benefits of Delayed Product Differentiation , 1997 .

[117]  Jeonghan Ko,et al.  Balancing of manufacturing systems with complex configurations for delayed product differentiation , 2008 .

[118]  Katsuhisa Ohno,et al.  Modeling and analysis of a mixed‐model assembly line with stochastic operation times , 2007 .

[119]  Waguih ElMaraghy,et al.  Modelling of Manufacturing Systems Complexity , 2003 .

[120]  H. ElMaraghy,et al.  A model for measuring products assembly complexity , 2010, Int. J. Comput. Integr. Manuf..

[121]  George Chryssolouris,et al.  Oscillator analogy for modelling the manufacturing systems dynamics , 2008 .

[122]  Jörg Krüger,et al.  Robust control of force-coupled human-robot-interaction in assembly processes , 2008 .

[123]  Alf Kimms,et al.  Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints , 2001, Manag. Sci..

[124]  Andrew Y. C. Nee,et al.  Virtual Reality and Augmented Reality Applications in Manufacturing , 2004 .

[125]  Waldo C. Kabat,et al.  Job-shop scheduling using automated reasoning: A case study of the car-sequencing problem , 2004, Journal of Automated Reasoning.

[126]  George Chryssolouris,et al.  A simulation-based hybrid backwards scheduling framework for manufacturing systems , 2006, Int. J. Comput. Integr. Manuf..

[127]  Gunther Reinhart,et al.  Flexible Automation for the Assembly in Motion , 2007 .

[128]  Christine Solnon,et al.  A Study of Greedy, Local Search, and Ant Colony Optimization Approaches for Car Sequencing Problems , 2003, EvoWorkshops.

[129]  Derek Yip-Hoi,et al.  Design Principles for Machining System Configurations , 2002 .

[130]  Jörg Roscher Bewertung von Flexibilitätsstrategien für die Endmontage in der Automobilindustrie , 2008 .

[131]  Sotiris Makris,et al.  Dynamic job rotation for workload balancing in human based assembly systems , 2010 .

[132]  Marc Gravel,et al.  Review and comparison of three methods for the solution of the car sequencing problem , 2005, J. Oper. Res. Soc..

[133]  Pedro M. Vilarinho,et al.  ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations , 2006 .

[134]  Brahim Rekiek,et al.  Assembly Line Design: The Balancing of Mixed-Model Hybrid Assembly Lines with Genetic Algorithms , 2005 .

[135]  Charles Møller,et al.  ERP II: a conceptual framework for next-generation enterprise systems? , 2005, J. Enterp. Inf. Manag..

[136]  Yoram Koren,et al.  Stream-of-Variation Theory for Automotive Body Assembly , 1997 .

[137]  S. Sakakibara,et al.  A new cell production assembly system with human-robot cooperation , 2010 .

[138]  John Paul Macduffie,et al.  Product variety and manufacturing performance: evidence from the international automotive assembly plant study , 1996 .

[139]  A Thesis,et al.  BALANCING MIXED-MODEL ASSEMBLY LINE TO REDUCE WORK OVERLOAD IN A MULTI-LEVEL PRODUCTION SYSTEM , 2006 .

[140]  Jingshan Li,et al.  Throughput analysis of production systems: recent advances and future topics , 2009 .

[141]  Heungsoon Felix Lee,et al.  A line-balancing strategy for designing flexible assembly systems , 1991 .

[142]  Bhaba R. Sarker,et al.  Designing a mixed-model, open-station assembly line using mixed-integer programming , 2001, J. Oper. Res. Soc..

[143]  Diwakar Gupta,et al.  Make-to-order, make-to-stock, or delay product differentiation? A common framework for modeling and analysis , 2004 .

[144]  S. Jack Hu,et al.  Modeling of Manufacturing Complexity in Mixed-Model Assembly Lines , 2008 .

[145]  Hideo Fujimoto,et al.  Assembly Process Design for Managing Manufacturing Complexities Because of Product Varieties , 2003 .

[146]  S. Graves,et al.  Supply chain management : design, coordination and operation , 2003 .

[147]  Hoda A. ElMaraghy,et al.  Design of single assembly line for the delayed differentiation of product variants , 2010 .

[148]  R.H. Wilson,et al.  On constraints in assembly planning , 1998, IEEE Trans. Robotics Autom..

[149]  Tamio Arai,et al.  Assessment of operator stress induced by robot collaboration in assembly , 2010 .

[150]  Haixia Wang,et al.  Generation of Assembly Sequences with k-ary Operations , 2007, 2007 IEEE International Symposium on Assembly and Manufacturing.

[151]  Sigrid Wenzel,et al.  Simulation in der Automobilproduktion , 2003 .

[152]  Michael F. Zäh,et al.  Safety Aspects in a Human-Robot Interaction Scenario: A Human Worker Is Co-operating with an Industrial Robot , 2009, FIRA.

[153]  Rolf Dieter Schraft,et al.  Robot-Dummy Crash Tests for Robot Safety Assessment , 2007, Proceedings 2007 IEEE International Conference on Robotics and Automation.

[154]  Mitchell M. Tseng,et al.  Design for mass customization , 1996 .

[155]  Angel B. Ruiz,et al.  Balancing assembly lines: an industrial case study , 2004, J. Oper. Res. Soc..

[156]  Arthur C. Sanderson,et al.  A correct and complete algorithm for the generation of mechanical assembly sequences , 1989, Proceedings, 1989 International Conference on Robotics and Automation.

[157]  H. Bley,et al.  Automated Assembly Planning Based on Skeleton Modelling Strategy , 2006, IPAS.

[158]  Armin Scholl,et al.  Simple assembly line balancing—Heuristic approaches , 1997, J. Heuristics.

[159]  George Chryssolouris,et al.  DESYMA: assessing flexibility for the lifecycle of manufacturing systems , 2007 .

[160]  Jaime A. Camelio,et al.  Modeling Variation Propagation of Multi-Station Assembly Systems With Compliant Parts , 2003 .

[161]  Hiromu Nakazawa,et al.  Process planning based on information concept , 1984 .

[162]  Dimitris Mavrikios,et al.  A Hybrid Approach to the Verification and Analysis of Assembly and Maintenance Processes Using Virtual Reality and Digital Mannequin Technologies , 2004 .

[163]  Arthur C. Sanderson,et al.  Representations of mechanical assembly sequences , 1991, IEEE Trans. Robotics Autom..

[164]  J. Wind,et al.  Customerization: The next revolution in mass customization , 2001 .

[165]  He-Yau Kang,et al.  Dynamic programming approach for analyzing delayed product differentiation , 2006 .

[166]  John Miltenburg,et al.  Balancing and Scheduling Mixed-Model U-Shaped Production Lines , 2002 .

[167]  H. Lorenz,et al.  Jena Research Papers in Business and Economics Sequencing Mixed-Model Assembly Lines : Survey , Classification and Model Critique , 2007 .

[168]  S. Kotha Mass Customization: The New Frontier in Business Competition , 1992 .

[169]  C. Richard Liu,et al.  Design for Manufacturing , 2007 .

[170]  S. Jack Hu,et al.  Automated generation of assembly system-design solutions , 2005, IEEE Transactions on Automation Science and Engineering.

[171]  Avraham Shtub,et al.  SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH , 1994 .

[172]  Jeonghan Ko,et al.  Design of multi-product manufacturing lines with the consideration of product change dependent inter-task times, reduced changeover and machine flexibility , 2010 .

[173]  Tullio Tolio,et al.  A Decomposition Method to Support the Configuration / Reconfiguration of Production Systems , 2005 .

[174]  Dongbo Li,et al.  A novel process planning schema based on process knowledge customization , 2009 .

[175]  Sudarsan Rachuri,et al.  A Model for Capturing Product Assembly Information , 2006, J. Comput. Inf. Sci. Eng..

[176]  John K. Gershenson,et al.  Representation of similarity and dependency for assembly modularity , 2008 .

[177]  Mitchell M. Tseng,et al.  Understanding product family for mass customization by developing commonality indices , 2000 .