Optimal maintenance service contract negotiation with aging equipment

In recent years, there has been a growing trend to out-source service operations in which the equipment maintenance is carried out by an external agent rather than in-house. Often, the agent (service provider) offers more than one option and the owners of equipment (customers) are faced to the problem of selecting the optimal option, under the terms of a contract. In the current work, we develop a model and report results to determine the agent’s optimal strategy for a given type of contract. The model derives in a non-cooperative game formulation in which the decisions are taken by maximizing expected profits. This work extends previous models by considering the realistic case of equipments having an increasing failure intensity due to imperfect maintenance, instead of the standard assumption that considers failure times are exponentially distributed (constant failure intensity). We develop a model using a linear function of time to characterize the failure intensity. The main goal, for the agent, is to determine the pricing structure in the contract and the number of customers to service. On the other hand, for the clients, the main goal is to define the period between planned actions for preventive maintenance and the time to replace equipments. In order to give a complete characterization of the results, we also carry out a sensitivity analysis over some of the factors that would influence over the failure intensity. 2007 Elsevier B.V. All rights reserved.

[1]  Fan Zhang,et al.  Optimal maintenance models with minimal repair, periodic overhaul and complete renewal , 1998 .

[2]  William P. Pierskalla,et al.  A survey of maintenance models: The control and surveillance of deteriorating systems , 1976 .

[3]  D. N. P. Murthy,et al.  A stochastic model for service contract , 1998 .

[4]  A. Rubinstein Perfect Equilibrium in a Bargaining Model , 1982 .

[5]  D. N. Prabhakar Murthy,et al.  Optimal decision making in a maintenance service operation , 1999, Eur. J. Oper. Res..

[6]  L. C. Thomas,et al.  A survey of maintenance and replacement models for maintainability and reliability of multi-item systems , 1986 .

[7]  B. H. Mahon,et al.  A Proposed Improved Replacement Policy for Army Vehicles , 1975 .

[8]  D. N. P. Murthy,et al.  Modelling and analysis of maintenance service contracts , 1995 .

[9]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[10]  Che Soong Kim,et al.  WARRANTY AND PREVENTIVE MAINTENANCE , 2001 .

[11]  D. N. P. Murthy,et al.  Service contracts: A stochastic model , 2000 .

[12]  Sheldon M. Ross,et al.  Stochastic Processes , 2018, Gauge Integral Structures for Stochastic Calculus and Quantum Electrodynamics.

[13]  Carl M. Harris,et al.  Fundamentals of queueing theory , 1975 .

[14]  D. N. Prabhakar Murthy,et al.  Strategic warranty management: a life-cycle approach , 2000, IEEE Trans. Engineering Management.

[15]  D. N. Prabhakar Murthy,et al.  Product warranty logistics: Issues and challenges , 2004, Eur. J. Oper. Res..

[16]  A. Rubinstein,et al.  The Nash bargaining solution in economic modelling , 1985 .