A bi-objective coordination setup problem in a two-stage production system
暂无分享,去创建一个
Paolo Detti | Carlo Meloni | Marco Pranzo | Michele Ciavotta | M. Pranzo | M. Ciavotta | C. Meloni | P. Detti
[1] Thomas Stützle,et al. Stochastic Local Search: Foundations & Applications , 2004 .
[2] Jean-Charles Billaut,et al. Multicriteria scheduling , 2005, Eur. J. Oper. Res..
[3] Alessandro Agnetis,et al. Set-Up Coordination between Two Stages of a Supply Chain , 2001, Ann. Oper. Res..
[4] Matthias Ehrgott,et al. Multicriteria Optimization , 2005 .
[5] David L. Woodruff,et al. Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .
[6] GILBERT LAPORTE,et al. Exact algorithms for the job sequencing and tool switching problem , 2002 .
[7] Jonathan F. Bard,et al. Heuristics for the flow line problem with setup costs , 1998, Eur. J. Oper. Res..
[8] Christopher S. Tang,et al. Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches , 1988, Oper. Res..
[9] Helena Ramalhinho Dias Lourenço,et al. Iterated Local Search , 2001, Handbook of Metaheuristics.
[10] Chris N. Potts,et al. Scheduling with batching: A review , 2000, Eur. J. Oper. Res..
[11] Geraint W Owen,et al. Changeover improvement: A maintenance perspective , 2001 .
[12] Alessandro Agnetis,et al. A heuristic approach to batching and scheduling a single machine to minimize setup costs , 2004, Comput. Ind. Eng..
[13] H. Kunzi,et al. Lectu re Notes in Economics and Mathematical Systems , 1975 .
[14] Leyuan Shi,et al. Optimal buffer allocation in production lines , 2003 .
[15] Mitsuo Gen,et al. Parts loading scheduling in a flexible forging machine using an advanced genetic algorithm , 1999, J. Intell. Manuf..
[16] Ching-Jong Liao,et al. A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chain , 2009 .
[17] Michele Dassisti,et al. A hybrid approach to the single line scheduling problem with multiple products and sequence-dependent time , 2003, Comput. Ind. Eng..
[18] Paolo Detti,et al. Minimizing and balancing setups in a serial production system , 2007 .
[19] Jatinder N. D. Gupta,et al. A review of scheduling research involving setup considerations , 1999 .
[20] F. Glover,et al. Handbook of Metaheuristics , 2019, International Series in Operations Research & Management Science.
[21] Shokri Z. Selim,et al. A sequencing problem in the weaving industry , 1993 .