Optimization and control of nitrogen removal activated sludge processes: A review of recent developments
暂无分享,去创建一个
Jurg Keller | Paul Lant | Zhiguo Yuan | Zhiguo Yuan | J. Keller | P. Lant
[1] Hiroki Nakamura,et al. High rate and compact single sludge pre-denitrification process for retrofit , 1994 .
[2] Hallvard Ødegaard,et al. Nitrogen removal from dilute wastewater in cold climate using moving‐bed biofilm reactors , 1995 .
[3] On-line estimation of the maximum specific growth rate of nitrifiers in activated sludge systems. , 1999 .
[4] W. Gujer,et al. Activated sludge model No. 3 , 1995 .
[5] Giorgio Bertanza,et al. Simultaneous nitrification-denitrification process in extended aeration plants: Pilot and real scale experiences , 1997 .
[6] Gustaf Olsson,et al. Simultaneous DO Control and Respiration Estimation , 1989 .
[7] Karel J. Keesman,et al. Identification of activated sludge and wastewater characteristics using respirometric batch-experiments , 1998 .
[8] A. Tilche,et al. Phosphate uptake under anoxic conditions and fixed-film nitrification in nutrient removal activated sludge system , 1996 .
[9] S. Takizawa,et al. Nitrogen removal from domestic wastewater using immobilized bacteria , 1996 .
[10] S. Tabata,et al. Development of the Intermittent Cyclic Process for simultaneous nitrogen and phosphorus removal , 1997 .
[11] Koji Mishima,et al. Characteristics of nitrification and denitrification of the media-anaerobic-anoxic-oxic process , 1996 .
[12] Ghislain Vansteenkiste,et al. Carbon dosage control for predenitrification processes , 1997, 1997 European Control Conference (ECC).
[13] J. Londong,et al. Six years of practical experience with the operation of on-line analysers , 1996 .
[14] U. Nyberg,et al. Long-term experiences with external carbon sources for nitrogen removal , 1996 .
[15] J. J. Heijnen,et al. Biological phosphorus removal from wastewater by anaero-bic-anoxic sequencing batch reactor , 1993 .
[16] pH-controlled reject-water-treatment , 1998 .
[17] J. Londong. Strategies for Optimized Nitrate Reduction with Primary Denitrification , 1992 .
[18] Ruey-Fang Yu,et al. Applying real-time control to enhance the performance of nitrogen removal in the continuous-flow SBR system , 1998 .
[19] Sara Hallin,et al. METABOLIC PROPERTIES OF DENITRIFYING BACTERIA ADAPTING TO METHANOL AND ETHANOL IN ACTIVATED SLUDGE , 1998 .
[20] Thomas Welander,et al. Nitrification of landfill leachate using suspended-carrier biofilm technology , 1997 .
[21] I. Al-Ghusain,et al. Use of pH as Control Parameter for Aerobic/Anoxic Sludge Digestion , 1995 .
[22] K. Svardal,et al. Nitrification inhibition – a method for the estimation of actual maximum autotrophic growth rates in activated sludge systems , 1994 .
[23] Klaus L. Andersen,et al. Nutrient Removal: On-Line Measurements and Control Strategies , 1993 .
[24] Mogens Henze,et al. External carbon source addition as a means to control an activated sludge nutrient removal process , 1994 .
[25] S. Zeghal,et al. Process control for nutrients removal using lamella sedimentation and floating media filtration , 1998 .
[26] M. Loosdrecht,et al. Microbiological conversions in nitrogen removal. , 1998 .
[27] J. Wanner,et al. New Process Design for Biological Nutrient Removal , 1992 .
[28] W. Rulkens,et al. Environmental engineering series: Wastewater treatment, M. Henze, P. Harremoës, J. de la Cour, E. Arvin. , 1995 .
[29] J. Charpentier,et al. Oxidation-reduction potential (ORP) regulation as a way to optimize aeration and C, N, and P removal: experimental basis and various full-scale examples , 1989 .
[30] Henrik A. Thomsen,et al. N and P on-line meters: Requirements, maintenance and stability , 1996 .
[31] P. Kos. Short SRT (solids retention time) nitrification process/flowsheet , 1998 .
[32] S. Schlegel,et al. Application of process control for improved nitrogen removal , 1998 .
[33] Marinus K. Nielsen,et al. Improvement of a recirculating plant by introducing star control , 1995 .
[34] M. Kümmel,et al. A novel control strategy for improved nitrogen removal in an alternating activated sludge process—part I. Process analysis , 1994 .
[35] Peter A. Vanrolleghem,et al. Control of External Carbon Addition to Predenitrifying Systems , 1997 .
[36] G. Bortone,et al. Biological nitrogen and phosphorus removal in an anaerobic/anoxic sequencing batch reactor with separated biofilm nitrification , 1994 .
[37] Mogens Henze,et al. Controlled Carbon Source Addition to an Alternating Nitrification-Denitrification Wastewater Treatment Process Including Biological P Removal , 1995 .
[38] D. Thornberg,et al. Rule based control of a periodic activated sludge process , 1998 .
[39] M. Matsumura. Rapid nitrification with immobilized cell using macro-porous cellulose carrier , 1997 .
[40] L. Lukasse,et al. Control and identification in activated sludge processes , 1999 .
[41] H. D. Stensel,et al. Design and retrofit of wastewater treatment plants for biological nutrient removal , 1992 .
[42] Bram Klapwijk,et al. Feedforward control of nitrification by manipulating the aerobic volume in activated sludge plants , 1998 .
[43] M. Kümmel,et al. A novel control strategy for improved nitrogen removal in an alternating activated sludge process—part II. Control development , 1994 .
[44] Paul Lant,et al. Multivariable control of nutrient-removing activated sludge systems , 1999 .
[45] A. Lynggaard-Jensen,et al. Nutrient sensor based real-time on-line process control of a wastewater treatment plant using recirculation , 1996 .
[46] J. la Cour Jansen,et al. Optimum operation of a small sequencing batch reactor for bod and nitrogen removal based on on-line our-calculation , 1997 .
[47] J. J. Heijnen,et al. Phosphorus and nitrogen removal with minimal COD requirement by integration of denitrifying dephosphatation and nitrification in a two-sludge system , 1996 .
[48] G. Olsson. State of the Art in Sewage Treatment Plant Control , 1976 .
[49] Gustaf Olsson,et al. Self-Tuning Control of the Dissolved Oxygen Concentration in Activated Sludge Systems , 1985 .
[50] Oliver J. Hao,et al. Alternating aerobic-anoxic process for nitrogen removal : process evaluation , 1996 .
[51] John Sørensen. Optimization of a nutrient-removing wastewater treatment plant using on-line monitors , 1996 .
[52] Hallvard Ødegaard,et al. Nitrification of municipal wastewater in moving-bed biofilm reactors , 1995 .
[53] Willy Verstraete,et al. Reducing the size of a nitrogen removal activated sludge plant by shortening the retention time of inert solids via sludge storage , 2000 .
[54] Peter A. Vanrolleghem,et al. Practical Identifiability of a Biokinetic Model of Activated-sludge Respiration , 1995 .
[55] Peter A. Vanrolleghem,et al. NDBEPR process optimization in SBRs: reduction of external carbon-source and oxygen supply , 1994 .
[56] S. Traynor,et al. Enhanced nutrient removal by oxidation-reduction potential (ORP) controlled aeration in a laboratory scale extended aeration treatment system , 1994 .
[57] B. Ahring,et al. Anaerobic Degradation of PCP and Phenol in Fixed-Film Reactors: The Influence of an Additional Substrate , 1991 .
[58] V. Alonso,et al. Biological anoxic phosphorus removal - the dephanox process , 1996 .
[59] K. Jönsson,et al. Increasing substrate for polyphosphate‐accumulating bacteria in municipal wastewater through hydrolysis and fermentation of sludge in primary clarifiers , 1998 .
[60] G. Bortone,et al. Verification of anoxic phosphate uptake as the main biochemical mechanism of the “dephanox” process , 1997 .
[61] M. Nielsen,et al. Optimization of a nitrogen-removing biological wastewater treatment plant using on-line measurements , 1994 .
[62] C. Ouyang,et al. Effects of SRT and DO on nutrient removal in a combined AS-biofilm process , 1997 .
[63] Graham C. Goodwin,et al. Adaptive control and identification of the dissolved oxygen process , 1982, Autom..
[64] K. Hoen,et al. Control of nitrogen removal in wastewater treatment plants with predenitrification, depending on the actual purification capacity , 1996 .
[65] W. Gujer,et al. A general model for single-sludge wastewater treatment systems , 1987 .
[66] J. Heijnen,et al. Nitrogen removal using nitrifying biofilm growth and denitrifying suspended growth in a biofilm airlift suspension reactor coupled with a chemostat , 1998 .
[67] Hallvard Ødegaard,et al. Nitrification in a moving bed biofilm reactor , 1994 .
[68] W. Gujer,et al. Parameters affecting nitrifying biofilm reactors , 1994 .
[69] Daniel A. Nolasco,et al. The use of mathematical modeling and pilot plant testing to develop a new biological phosphorus and nitrogen removal process , 1998 .
[70] H. Ødegaard,et al. Denitrification in a packed bed biofilm reactor (BIOFOR) — Experiments with different carbon sources , 1998, Water Research.
[71] D. Lumley,et al. Upgrading for nitrogen removal under severe site restrictions , 1998 .
[72] Mauro Majone,et al. Aerobic storage under dynamic conditions in activated sludge processes. The state of the art , 1999 .
[73] Erik Bundgaard,et al. BIO-DENITRO and BIO-DENIPHO Systems – Experiences and Advanced Model Development: The Danish Systems for Biological N and P Removal , 1989 .
[74] E. J. Leeuw,et al. Process selection, design and operation of the EDE WWTP , 1996 .
[75] M. Florentz,et al. Oxidation-Reduction Potential (ORP) Regulation: A Way to Optimize Pollution Removal and Energy Savings in the Low Load Activated Sludge Process , 1987 .
[76] Carl-Fredrik Lindberg. Multivariable modeling and control of an activated sludge process , 1998 .
[77] J. Heijnen,et al. Nitrogen Removal in Intermittently Aerated Biofilm Airlift Reactor , 1998 .
[78] C. W. Randall,et al. Performance of fixed film media integrated in activated sludge reactors to enhance nitrogen removal , 1994 .
[79] Peter A. Vanrolleghem,et al. Respirometry in Control of the Activated Sludge Process: Principles , 1998 .
[80] C. W. Randall,et al. Full-scale evaluation of an integrated fixed-film activated sludge (IFAS) process for enhanced nitrogen removal , 1996 .
[81] C. Ouyang,et al. Nutrient removal using a combined process with activated sludge and fixed biofilm , 1996 .
[82] J. Heijnen,et al. Microbiology and biochemistry of the enhanced biological phosphate removal process , 1998 .
[83] S. Takizawa,et al. Factors affecting nitrogen removal from domestic wastewater using immobilized bacteria , 1998 .
[84] P. Vanrolleghem,et al. Estimating (combinations of) Activated Sludge Model No. 1 parameters and components by respirometry , 1999 .
[85] Mogens Henze,et al. An adaptive algorithm for external carbon addition to an alternating activated sludge process for nutrient removal from waste water , 1995 .
[86] Bengt Carlsson,et al. Adaptive control of external carbon flow rate in an activated sludge process , 1996 .
[87] Magnus Christensson,et al. A comparison between ethanol and methanol as carbon sources for denitrification , 1994 .
[88] A Klapwijk,et al. Control of intermittently aerated nitrogen removal plants by detection endpoints of nitrification and denitrification using respirometry only , 1998 .
[89] Thomas Welander,et al. Biological nitrogen removal from municipal landfill leachate in a pilot scale suspended carrier biofilm process , 1998 .
[90] Raimund Haberl,et al. Development of a new system for control and optimization of small wastewater treatment plants using oxidation-reduction potential (ORP) , 1998 .
[91] Ghislain Vansteenkiste,et al. Sludge storage for countering nitrogen shock loads and toxicity incidents , 1998 .
[92] Cheng-Nan Chang,et al. Monitoring and control using on-line orp on the continuous-flow activated sludge batch reactor system , 1997 .
[93] B. Hultman,et al. Nitrification reactions in treatment of supernatant from dewatering of digested sludge , 1997 .
[94] Oliver J. Hao,et al. USING pH AS A REAL-TIME CONTROL PARAMETER FOR WASTEWATER TREATMENT AND SLUDGE DIGESTION PROCESSES , 1994 .
[95] S. Svoronos,et al. Optimization of a Periodic Biological Process for Nitrogen Removal from Wastewater , 1996 .
[96] K. Tsumura,et al. Development of 2-reactor intermittent-aeration activated sludge process for simultaneous removal of nitrogen and phosphorus , 1996 .
[97] M.C.M. van Loosdrecht,et al. Upgrading of waste water treatment processes for integrated nutrient removal-the BCFS® process , 1998 .
[98] M. Morper. Upgrading of activated sludge systems for nitrogen removal by application of the LINPOR®-CN process , 1994 .
[99] Ken J. Hall,et al. Sludge digestion using ORP-regulated aerobic-anoxic cycles , 1994 .
[100] Stefano Marsili-Libelli,et al. Modelling, Identification and Control of the Activated Sludge Process , 1989, Lignocellulosic Materials.
[101] B. Capdeville,et al. Real-time control of nitrogen removal using three orp bending-points: Signification, control strategy and results , 1996 .
[102] L. Hem. Effect of volatile fatty acids and trimethylamine of nitrification in activated sludge , 1994 .
[103] J. Audic,et al. REAL-TIME CONTROL OF NITROGEN REMOVAL AT FULL-SCALE USING OXIDATION REDUCTION POTENTIAL , 1994 .
[104] Glen T. Daigger,et al. Wastewater solids fermentation for volatile acid production and enhanced biological phosphorus removal , 1995 .
[105] H. Deguchi,et al. Study on nitrified liquor recycling process operations using polyurethane foam sponge cubes as a biomass support medium , 1994 .
[106] Kazuhiro Tanaka,et al. Development of novel anaerobic/aerobic filter process for nitrogen removal using immobilized nitrifier pellets , 1997 .
[107] M. K. Nielsen,et al. Advanced computer control based on real and software sensors , 1996 .
[108] C. Filipe,et al. Characterization of the denitrifying fraction of phosphate accumulating organisms in biological phosphate removal , 1999 .
[109] Bengt Carlsson,et al. Microbial adaptation, process performance and a suggested control strategy in a pre-denitrifying system with ethanol dosage. , 1996 .
[110] L.J.S. Lukasse,et al. Optimal control of N-removal in ASPs , 1998 .
[111] Michel Perrier,et al. Respirometric control of the anaerobic period duration of an SBR bio-P process , 1997 .
[112] Ken J. Hall,et al. Real-Time Control of Wastewater Treatment Systems Using ORP , 1993 .
[113] J. J. Heijnen,et al. The sharon process: an innovative method for nitrogen removal from ammonium-rich waste water , 1998 .
[114] J. Tay,et al. Coke plant wastewater treatment by fixed biofilm system for COD and NH3-N removal , 1998 .
[115] Gustaf Olsson,et al. The dissolved oxygen profile—A valuable tool for control of the activated sludge process , 1978 .
[116] B. Rusten,et al. Upgrading to nitrogen removal with the kmt moving bed biofilm process , 1994 .