Sequencing and scheduling: algorithms and complexity
暂无分享,去创建一个
Eugene L. Lawler | Jan Karel Lenstra | David B. Shmoys | Ahg Alexander Rinnooy Kan | E. Lawler | J. Lenstra | D. Shmoys
[1] L. G. Mitten. Sequencing n Jobs on Two Machines with Arbitrary Time Lags , 1959 .
[2] Michael Pinedo,et al. Optimal policies in stochastic shop scheduling , 1984, Ann. Oper. Res..
[3] Michael Pinedo,et al. Stochastic Shop Scheduling: A Survey , 1982 .
[4] W. Maxwell. On Sequencing n Jobs on One Machine to Minimize the Number of Late Jobs , 1970 .
[5] Ronald L. Graham,et al. Performance Guarantees for Scheduling Algorithms , 1978, Oper. Res..
[6] Selmer Martin Johnson,et al. Discussion: Sequencing n Jobs on Two Machines with Arbitrary Time Lags , 1959 .
[7] A.H.G. Rinnooy Kan,et al. Single‐machine scheduling subject to stochastic breakdowns , 1990 .
[8] James R. Jackson,et al. An extension of Johnson's results on job IDT scheduling , 1956 .
[9] Jeffrey M. Jaffe,et al. Efficient Scheduling of Tasks without Full Use of Processor Resources , 1980, Theor. Comput. Sci..
[10] J. M. Tamarit,et al. Project scheduling with resource constraints: A branch and bound approach , 1987 .
[11] Edward G. Coffman,et al. Preemptive Scheduling of Real-Time Tasks on Multiprocessor Systems , 1970, JACM.
[12] Jan Karel Lenstra,et al. Approximation algorithms for scheduling unrelated parallel machines , 1987, 28th Annual Symposium on Foundations of Computer Science (sfcs 1987).
[13] Esther Frostig,et al. A Stochastic Scheduling Problem with Intree Precedence Constraints , 1988, Oper. Res..
[14] Harold N. Gabow,et al. Scheduling UET Systems on Two Uniform Processors and Length Two Pipelines , 1988, SIAM J. Comput..
[15] Edward G. Coffman,et al. On the Expected Relative Performance of List Scheduling , 1985, Oper. Res..
[16] M. T. Kaufman,et al. An Almost-Optimal Algorithm for the Assembly Line Scheduling Problem , 1974, IEEE Transactions on Computers.
[17] Jane W.-S. Liu,et al. Bounds on Scheduling Algorithms for Heterogeneous Comnputing Systems , 1974, IFIP Congress.
[18] E. Lawler. A “Pseudopolynomial” Algorithm for Sequencing Jobs to Minimize Total Tardiness , 1977 .
[19] Charles U. Martel,et al. Preemptive Scheduling of Two Uniform Machines to Minimize the Number of Late Jobs , 1989, Oper. Res..
[20] Greg N. Frederickson,et al. Scheduling Unit-Time Tasks With Integer Release Times and Deadlines , 1983, Inf. Process. Lett..
[21] Chris N. Potts,et al. A decomposition algorithm for the single machine total tardiness problem , 1982, Oper. Res. Lett..
[22] Jeremy P. Spinrad,et al. Incremental modular decomposition , 1989, JACM.
[23] Jeffrey M. Jaffe. An Analysis of Preemptive Multiprocessor Job Scheduling , 1980, Math. Oper. Res..
[24] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[25] M. Garey,et al. Minimizing expected makespans on uniform processor systems , 1987, Advances in Applied Probability.
[26] Shimon Even,et al. Bounds for the Optimal Scheduling of n Jobs on m Processors , 1964 .
[27] Jan Karel Lenstra,et al. Recent developments in deterministic sequencing and scheduling: a survey : (preprint) , 1981 .
[28] Edward P. C. Kao,et al. On Dynamic Programming Methods for Assembly Line Balancing , 1982, Oper. Res..
[29] Richard Loulou,et al. Tight Bounds and Probabilistic Analysis of Two Heuristics for Parallel Processor Scheduling , 1984, Math. Oper. Res..
[30] Barbara B. Simons,et al. Multiprocessor Scheduling of Unit-Time Jobs with Arbitrary Release Times and Deadlines , 1983, SIAM J. Comput..
[31] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[32] Jeffrey D. Ullman,et al. NP-Complete Scheduling Problems , 1975, J. Comput. Syst. Sci..
[33] I. Meilijson,et al. Minimizing Flow Time on Parallel Identical Processors with Variable Unit Processing Time , 1984, Oper. Res..
[34] Manfred K. Warmuth,et al. A Fast Algorithm for Multiprocessor Scheduling of Unit-Length Jobs , 1989, SIAM J. Comput..
[35] Michael Pinedo,et al. Scheduling Jobs with Exponentially Distributed Processing Times on Two Machines with Resource Constraints , 1984 .
[36] Michael Pinedo,et al. The "Largest Variance First" Policy in Some Stochastic Scheduling Problems , 1987, Oper. Res..
[37] Michael A. Langston,et al. Bounds for Multifit Scheduling on Uniform Processors , 1983, SIAM J. Comput..
[38] J. Erschler,et al. Applying new dominance concepts to job schedule optimization , 1982 .
[39] Seiki Kyan,et al. DETERMINISTIC SCHEDULING IN COMPUTER SYSTEMS: A SURVEY , 1988 .
[40] M. Fujii,et al. Optimal Sequencing of Two Equivalent Processors , 1969 .
[41] E. Nowicki,et al. A note on minimizing maximum lateness in a one-machine sequencing problem with release dates , 1986 .
[42] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[43] B. J. Lageweg,et al. Computer-Aided complexity classification of combinational problems , 1982, CACM.
[44] E. L. Lawler,et al. Computing Maximal "Polymatroidal" Network Flows , 1982, Math. Oper. Res..
[45] T. S. Abdul-Razaq,et al. Dynamic Programming State-Space Relaxation for Single-Machine Scheduling , 1988 .
[46] Mihalis Yannakakis,et al. Towards an architecture-independent analysis of parallel algorithms , 1990, STOC '88.
[47] Edward G. Coffman,et al. Scheduling independent tasks to reduce mean finishing time , 1974, CACM.
[48] Jeffrey B. Sidney,et al. A Decomposition Algorithm for Sequencing with General Precedence Constraints , 1981, Math. Oper. Res..
[49] Joseph Y.-T. Leung,et al. Bin Packing with Restricted Piece Sizes , 1989, Inf. Process. Lett..
[50] Tibor Fiala. An Algorithm for the Open-Shop Problem , 1983, Math. Oper. Res..
[51] L. Gelders,et al. Coordinating Aggregate and Detailed Scheduling Decisions in the One-Machine Job Shop: Part I. Theory , 2015, Oper. Res..
[52] Oscar H. Ibarra,et al. Bounds for LPT Schedules on Uniform Processors , 1977, SIAM J. Comput..
[53] J. Lenstra,et al. Job-Shop Scheduling by Implicit Enumeration , 1977 .
[54] Sartaj Sahni,et al. Algorithms for Scheduling Independent Tasks , 1976, J. ACM.
[55] Greg N. Frederickson,et al. Sequencing Tasks with Exponential Service Times to Minimize the Expected Flow Time or Makespan , 1981, JACM.
[56] J. Piehler,et al. Ein Beitrag zum Reihenfolgeproblem , 1960, Unternehmensforschung.
[57] J. M. Moore,et al. A Functional Equation and its Application to Resource Allocation and Sequencing Problems , 1969 .
[58] C. Y. Liu,et al. On the complexity of preemptive open-shop scheduling problems , 1985 .
[59] Jerzy Kyparisis,et al. Single machine scheduling research , 1987 .
[60] L. G. H. Cijan. A polynomial algorithm in linear programming , 1979 .
[61] Chris N. Potts,et al. An algorithm for single machine sequencing with release dates to minimize total weighted completion time , 1983, Discret. Appl. Math..
[62] Ellis Horowitz,et al. Exact and Approximate Algorithms for Scheduling Nonidentical Processors , 1976, JACM.
[63] C. N. Potts,et al. Technical Note - Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times , 1980, Oper. Res..
[64] Gideon Weiss,et al. Multiserver Stochastic Scheduling , 1982 .
[65] L. V. Wassenhove,et al. Algorithms for scheduling a single machine to minimize the weighted number of late jobs , 1988 .
[66] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .
[67] Sartaj Sahni,et al. Preemptive Scheduling of Independent Jobs with Release and Due Times on Open, Flow and Job Shops , 1981, Oper. Res..
[68] Joseph Y.-T. Leung,et al. Minimizing Total Tardiness on One Machine is NP-Hard , 1990, Math. Oper. Res..
[69] Graham McMahon,et al. On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness , 1975, Oper. Res..
[70] Teofilo F. Gonzalez,et al. Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..
[71] Jeffrey B. Sidney,et al. The Two-Machine Maximum Flow Time Problem with Series Parallel Precedence Relations , 1979, Oper. Res..
[72] G. S. Lueker,et al. Asymptotic Methods in the Probabilistic Analysis of Sequencing and Packing Heuristics , 1988 .
[73] J. Carlier. The one-machine sequencing problem , 1982 .
[74] E. L. Lawler,et al. A fully polynomial approximation scheme for the total tardiness problem , 1982, Oper. Res. Lett..
[75] Jeffrey B. Sidney,et al. Decomposition Algorithms for Single-Machine Sequencing with Precedence Relations and Deferral Costs , 1975, Oper. Res..
[76] Francis Y. L. Chin,et al. On J-maximal and J-minimal Flow-Shop Schedules , 1981, JACM.
[77] J. K. Lenstra,et al. Combinatorial optimization : annotated bibliographies , 1985 .
[78] Rolf H. Möhring,et al. Computationally Tractable Classes of Ordered Sets , 1989 .
[79] Stanislaw Zdrzalka,et al. An algorithm for single machine sequencing with release dates to minimize maximum cost , 1989, Discret. Appl. Math..
[80] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .
[81] David S. Johnson,et al. The NP-Completeness Column: An Ongoing Guide , 1982, J. Algorithms.
[82] Rolf H. Möhring,et al. Introduction to Stochastic Scheduling Problems , 1985 .
[83] Michael Pinedo,et al. On Minimizing the Expected Makespan and Flow Time in Stochastic Flow Shops with Blocking , 1986, Math. Oper. Res..
[84] J. J. Brennan,et al. An Improved Algorithm for Scheduling Jobs on Identical Machines , 1977 .
[85] Lucio Bianco,et al. Scheduling of a single machine to minimize total weighted completion time subject to release dates , 1982 .
[86] Oscar H. Ibarra,et al. Heuristic Algorithms for Scheduling Independent Tasks on Nonidentical Processors , 1977, JACM.
[87] Eugene L. Lawler,et al. On Preemptive Scheduling of Unrelated Parallel Processors by Linear Programming , 1978, JACM.
[88] Clyde L. Monma,et al. Sequencing with Series-Parallel Precedence Constraints , 1979, Math. Oper. Res..
[89] Michael H. Rothkopf,et al. Scheduling Independent Tasks on Parallel Processors , 1966 .
[90] Shui Lam,et al. A Level Algorithm for Preemptive Scheduling , 1977, J. ACM.
[91] Gideon Weiss,et al. Stochastic scheduling problems II-set strategies- , 1985, Z. Oper. Research.
[92] Imre Bárány,et al. A Vector-Sum Theorem and its Application to Improving Flow Shop Guarantees , 1981, Math. Oper. Res..
[93] J. Blaswicz. Selected topics in scheduling theory , 1987 .
[94] Ram Mohan V. Rachamadugu,et al. Technical Note - A Note on the Weighted Tardiness Problem , 1987, Oper. Res..
[95] Robert E. Tarjan,et al. A linear-time algorithm for a special case of disjoint set union , 1983, J. Comput. Syst. Sci..
[96] C. N. Potts,et al. Analysis of a linear programming heuristic for scheduling unrelated parallel machines , 1985, Discret. Appl. Math..
[97] P Dileepan,et al. Bicriterion static scheduling research for a single machine , 1988 .
[98] Chris N. Potts,et al. An adaptive branching rule for the permutation flow-shop problem , 1980 .
[99] R. Haupt,et al. A survey of priority rule-based scheduling , 1989 .
[100] C. N. Potts,et al. An algorithm for the single machine sequencing problem with precedence constraints , 1980 .
[101] Egon Balas,et al. The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .
[102] Manfred Kunde,et al. First fit decreasing scheduling on uniform multiprocessors , 1985, Discret. Appl. Math..
[103] G. Thompson,et al. Algorithms for Solving Production-Scheduling Problems , 1960 .
[104] Pierre N. Robillard,et al. Scheduling with earliest start and due date constraints on multiple machines , 1975 .
[105] Teofilo F. Gonzalez,et al. Optimal Preemptive Scheduling of Two Unrelated Processors , 1990, INFORMS J. Comput..
[106] Teofilo F. Gonzalez,et al. A New Algorithm for Preemptive Scheduling of Trees , 1980, JACM.
[107] J. Walrand,et al. Individually optimal routing in parallel systems , 1985 .
[108] Rolf H. Möhring,et al. Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time , 1984, Oper. Res..
[109] Thom J. Hodgson,et al. Note---A Note on Single Machine Sequencing with Random Processing Times , 1977 .
[110] Edward G. Coffman,et al. An Application of Bin-Packing to Multiprocessor Scheduling , 1978, SIAM J. Comput..
[111] Linus Schrage,et al. Dynamic Programming Solution of Sequencing Problems with Precedence Constraints , 1978, Oper. Res..
[112] David S. Johnson,et al. Two-Processor Scheduling with Start-Times and Deadlines , 1977, SIAM J. Comput..
[113] Eugene Levner,et al. Fast approximation algorithm for job sequencing with deadlines , 1981, Discret. Appl. Math..
[114] Michael A. Langston,et al. Evaluation of a MULTIFIT-Based Scheduling Algorithm , 1986, J. Algorithms.
[115] Seiki Kyan,et al. Worst Case Bound of an LRF Schedule for the Mean Weighted Flow-Time Problem , 1986, SIAM J. Comput..
[116] John M. Charlton,et al. A Generalized Machine-Scheduling Algorithm , 1970 .
[117] Donald K. Friesen,et al. Tighter Bounds for LPT Scheduling on Uniform Processors , 1987, SIAM J. Comput..
[118] Ravi Sethi,et al. On the Complexity of Mean Flow Time Scheduling , 1977, Math. Oper. Res..
[119] David G. Dannenbring,et al. An Evaluation of Flow Shop Sequencing Heuristics , 1977 .
[120] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[121] W. A. Horn. Some simple scheduling algorithms , 1974 .
[122] E. L. Lawler,et al. Recent Results in the Theory of Machine Scheduling , 1982, ISMP.
[123] Teofilo F. Gonzalez,et al. Open Shop Scheduling to Minimize Finish Time , 1976, JACM.
[124] Robert E. Tarjan,et al. Scheduling Unit-Time Tasks with Arbitrary Release Times and Deadlines , 1981, SIAM J. Comput..
[125] Francis Y. L. Chin,et al. Scheduling the Open Shop to Minimize Mean Flow Time , 1982, SIAM J. Comput..
[126] Clyde L. Monma,et al. Optimal Sequencing Via Modular Decomposition: Characterization of Sequencing Functions , 1987, Math. Oper. Res..
[127] Rolf H. Möhring,et al. A Fast Algorithm for the Decomposition of Graphs and Posets , 1983, Math. Oper. Res..
[128] Robert L. Bulfin,et al. Scheduling a Single Machine to Minimize the Weighted Number of Tardy Jobs , 1983 .
[129] H. Mine,et al. PERFORMANCE ANALYSIS OF SIX APPROXIMATION ALGORITHMS FOR THE ONE-MACHINE MAXIMUM LATENESS SCHEDULING PROBLEM WITH READY TIMES , 1979 .
[130] Oscar H. Ibarra,et al. Approximation Algorithms for Certain Scheduling Problems , 1978, Math. Oper. Res..
[131] F G Forst. A REVIEW OF THE STATIC STOCHASTIC SEQUENCING LITERATURE , 1973 .
[132] Edward G. Coffman,et al. Optimal Preemptive Scheduling on Two-Processor Systems , 1969, IEEE Transactions on Computers.
[133] Danny Dolev,et al. Scheduling Precedence Graphs of Bounded Height , 1984, J. Algorithms.
[134] Clyde L. Monma. The Two-Machine Maximum Flow Time Problem with Series-Parallel Precedence Constraints: An Algorithm and Extensions , 1979, Oper. Res..
[135] R. A. Blau. N-Job, One Machine Sequencing Problems Under Uncertainty , 1973 .
[136] Jeffrey B. Sidney,et al. An Extension of Moore’s Due Date Algotithm , 1973 .
[137] Gregory Dobson,et al. Scheduling Independent Tasks on Uniform Processors , 1984, SIAM J. Comput..
[138] R. Möhring. Scheduling Problems with a Singular Solution , 1982 .
[139] Jan Karel Lenstra,et al. Complexity of Scheduling under Precedence Constraints , 1978, Oper. Res..
[140] Kenneth Alan Pasch,et al. Heuristics for job-shop scheduling , 1988 .
[141] B. J. Lageweg,et al. A General Bounding Scheme for the Permutation Flow-Shop Problem , 1978, Oper. Res..
[142] G. G. Stokes. "J." , 1890, The New Yale Book of Quotations.
[143] E. Ignall,et al. Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems , 1965 .
[144] Michael Pinedo,et al. Stochastic Scheduling with Release Dates and Due Dates , 1983, Oper. Res..
[145] SahniSartaj,et al. Scheduling Independent Tasks with Due Times on a Uniform Processor System , 1980 .
[146] Eugene L. Lawler,et al. Minimizing Maximum Lateness in a Two-Machine Open Shop , 1979, Math. Oper. Res..
[147] Stephen A. Cook,et al. The complexity of theorem-proving procedures , 1971, STOC.
[148] J. B. G. Frenk,et al. The rate of convergence to optimality of the LPT rule , 1986, Discret. Appl. Math..
[149] Jeffrey M. Jaffe,et al. Algorithms for Scheduling Tasks on Unrelated Processors , 1981, JACM.
[150] Gideon Weiss,et al. Stochastic scheduling problems I — General strategies , 1984, Z. Oper. Research.
[151] C. Monma,et al. A concise survey of efficiently solvable special cases of the permutation flow-shop problem , 1983 .
[152] Kevin Mahon,et al. Deterministic and Stochastic Scheduling , 1983 .
[153] Michael Pinedo,et al. Scheduling Jobs with Exponentially Distributed Processing Times and Intree Precedence Constraints on Two Parallel Machines , 1985, Oper. Res..
[154] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[155] Ludo Gelders,et al. Coordinating Aggregate and Detailed Scheduling in the One-Machine Job Shop: II - Computation and Structure , 1975, Oper. Res..
[156] Richard M. Karp,et al. On the Computational Complexity of Combinatorial Problems , 1975, Networks.
[157] G. Weiss,et al. Scheduling Stochastic Jobs with a Two-Point Distribution on Two Parallel Machines , 1989, Probability in the Engineering and Informational Sciences.
[158] Victor J. Rayward-Smith,et al. The Complexity of Preemptive Scheduling Given Interprocessor Communication Delays , 1987, Inf. Process. Lett..
[159] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[160] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[161] David S. Johnson,et al. Complexity Results for Multiprocessor Scheduling under Resource Constraints , 1975, SIAM J. Comput..
[162] David B. Shmoys,et al. A Polynomial Approximation Scheme for Machine Scheduling on Uniform Processors: Using the Dual Approximation Approach , 1986, FSTTCS.
[163] Sartaj Sahni,et al. Nearly On Line Scheduling of a Uniform Processor System with Release Times , 1979, SIAM J. Comput..
[164] J. B. G. Frenk,et al. The Asymptotic Optimality of the LPT Rule , 1987, Math. Oper. Res..
[165] Barbara B. Simons,et al. A fast algorithm for single processor scheduling , 1978, 19th Annual Symposium on Foundations of Computer Science (sfcs 1978).
[166] George Steiner,et al. Optimal Sequencing by Modular Decomposition: Polynomial Algorithms , 1986, Oper. Res..
[167] Mark M. Klein,et al. Scheduling project networks , 1967, CACM.
[168] Wlodzimierz Szwarc. On some sequencing problems , 1968 .
[169] Michael Pinedo,et al. Scheduling tasks with exponential service times on non-identical processors to minimize various cost functions , 1980, Journal of Applied Probability.
[170] C. L. Liu,et al. On a Class of Scheduling Algorithms for Multiprocessors Computing Systems , 1974, Sagamore Computer Conference.
[171] T RheeW,et al. First Fit Decreasingアルゴリズムの完全収束 , 1989 .
[172] Marc E. Posner,et al. Minimizing Weighted Completion Times with Deadlines , 1985, Oper. Res..
[173] David B. Shmoys,et al. Using dual approximation algorithms for scheduling problems: Theoretical and practical results , 1985, 26th Annual Symposium on Foundations of Computer Science (sfcs 1985).
[174] S. S. Panwalkar,et al. Flowshop sequencing problem with ordered processing time matrices: A general case , 1976 .
[175] David S. Johnson,et al. Scheduling Equal-Length Tasks Under Treelike Precedence Constraints to Minimize Maximum Lateness , 1977, Math. Oper. Res..
[176] D. S. Palmer. Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near Optimum , 1965 .
[177] T. C. Hu. Parallel Sequencing and Assembly Line Problems , 1961 .
[178] Joseph Y.-T. Leung,et al. Scheduling Chain-Structured Tasks to Minimize Makespan and Mean Flow Time , 1991, Inf. Comput..
[179] Pedro G. Gazmuri. Probabilistic Analysis of a Machine Scheduling Problem , 1985, Math. Oper. Res..
[180] E. L. Lawler. Efficient implementation of dynamic programming algorithms for sequencing problems : (preprint) , 1979 .
[181] Sartaj Sahni,et al. Bounds for List Schedules on Uniform Processors , 1980, SIAM J. Comput..
[182] Salah E. Elmaghraby,et al. On the Scheduling of Jobs on a Number of Identical Machines. , 1972 .
[183] C. N. Potts. Analysis of Heuristics for Two-Machine Flow-Shop Sequencing Subject to Release Dates , 1985, Math. Oper. Res..
[184] J. Grabowski. A New Algorithm of Solving the Flow — Shop Problem , 1982 .
[185] Teofilo F. Gonzalez,et al. A Note on Open Shop Preemptive Schedules , 1979, IEEE Transactions on Computers.
[186] Ronald L. Graham,et al. Bounds on Multiprocessing Timing Anomalies , 1969, SIAM Journal of Applied Mathematics.
[187] I. Adiri,et al. An Efficient Optimal Algorithm for the Two-Machines Unit-Time Jobshop Schedule-Length Problem , 1982, Math. Oper. Res..
[188] B. J. Lageweg,et al. Minimizing maximum lateness on one machine : Computational experience and some applications , 1976 .
[189] William L. Maxwell,et al. Single machine sequencing with random processing times and random due-dates† , 1969 .
[190] David S. Johnson,et al. Scheduling Tasks with Nonuniform Deadlines on Two Processors , 1976, J. ACM.
[191] Joseph Y.-T. Leung,et al. Scheduling Tree-Structured Tasks with Restricted Execution Times , 1988, Inf. Process. Lett..
[192] Francis Y. L. Chin,et al. Bounds on Schedules for Independent Tasks with Similar Execution Times , 1981, JACM.
[193] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[194] Jeffrey R. Barker,et al. Scheduling the General Job-Shop , 1985 .
[195] Sartaj Sahni,et al. Complexity of Scheduling Shops with No Wait in Process , 1979, Math. Oper. Res..
[196] C. Potts. A Lagrangean Based Branch and Bound Algorithm for Single Machine Sequencing with Precedence Constraints to Minimize Total Weighted Completion Time , 1985 .
[197] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[198] E. Lawler. Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints , 1978 .
[199] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[200] S. L. van deVelde. Minimizing total completion time in the two-machine flow shop by Langrangian relaxation , 1988 .
[201] Oscar H. Ibarra,et al. On Two—Processor Scheduling of One— or Two—Unit Time Tasks with Precedence Constraints , 1975 .
[202] Joseph Y.-T. Leung,et al. Minimizing Mean Flow Time with Release Time Constraint , 1990, Theor. Comput. Sci..
[203] L. V. Wassenhove,et al. An algorithm for single machine sequencing with deadlines to minimize total weighted completion time , 1983 .
[204] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[205] Edward G. Coffman,et al. Expected Makespans for Largest-First Multiprocessor Scheduling , 1984, Performance.
[206] Michael Pinedo. A note on the two machine job shop with exponential processing times , 1981 .
[207] Joseph Y.-T. Leung,et al. Minimizing Total Tardiness on a Single Machine with Precedence Constraints , 1990, INFORMS J. Comput..
[208] A.H.G. Rinnooy Kan,et al. New directions in scheduling theory , 1984 .
[209] Robert McNaughton,et al. Scheduling with Deadlines and Loss Functions , 1959 .
[210] David S. Johnson,et al. Scheduling Opposing Forests , 1983 .
[211] John L. Bruno,et al. Probabilistic Bounds on the Performance of List Scheduling , 1986, SIAM J. Comput..
[212] Toshihide Ibaraki,et al. A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times , 1978, Oper. Res..
[213] B. J. Lageweg,et al. Minimizing Total Costs in One-Machine Scheduling , 1975, Oper. Res..
[214] J. Erschler,et al. A New Dominance Concept in Scheduling n Jobs on a Single Machine with Ready Times and Due Dates , 1983, Oper. Res..
[215] Ravi Sethi,et al. Scheduling Graphs on Two Processors , 1976, SIAM J. Comput..
[216] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[217] W. A. Horn. Single-Machine Job Sequencing with Treelike Precedence Ordering and Linear Delay Penalties , 1972 .
[218] Teofilo F. Gonzalez,et al. Unit Execution Time Shop Problems , 1982, Math. Oper. Res..
[219] Rhonda Righter,et al. Job scheduling to minimize expected weighted flowtime on uniform processors , 1988 .
[220] Matteo Fischetti,et al. Worst-case analysis of the differencing method for the partition problem , 1987, Math. Program..
[221] R. Foley,et al. Scheduling n nonoverlapping jobs and two stochastic jobs in a flow shop , 1986 .
[222] Shui Lam,et al. Worst Case Analysis of Two Scheduling Algorithms , 1977, SIAM J. Comput..
[223] Clyde L. Monma,et al. Linear-Time Algorithms for Scheduling on Parallel Processors , 1982, Oper. Res..
[224] Victor J. Rayward-Smith,et al. UET scheduling with unit interprocessor communication delays , 1987, Discret. Appl. Math..
[225] J. Edmonds. Minimum partition of a matroid into independent subsets , 1965 .
[226] Hamilton Emmons,et al. One-Machine Sequencing to Minimize Certain Functions of Job Tardiness , 1969, Oper. Res..
[227] D. A. Wismer,et al. Solution of the Flowshop-Scheduling Problem with No Intermediate Queues , 1972, Oper. Res..
[228] C. V. Ramamoorthy,et al. On the Flow-Shop Sequencing Problem with No Wait in Process † , 1972 .
[229] J. Walrand,et al. Scheduling jobs with stochastically ordered processing times on parallel machines to minimize expected flowtime , 1986, Journal of Applied Probability.
[230] Chris N. Potts,et al. A Branch and Bound Algorithm for the Total Weighted Tardiness Problem , 1985, Oper. Res..
[231] Sartaj Sahni,et al. Scheduling Independent Tasks with Due Times on a Uniform Processor System , 1980, JACM.
[232] O. J. Boxma,et al. Minimizing the expected weighted number of tardy jobs in stochastic flow shops , 1986 .
[233] Richard M. Karp,et al. The Differencing Method of Set Partitioning , 1983 .
[234] J. K. Lenstra,et al. Computational complexity of discrete optimization problems , 1977 .
[235] Donald K. Friesen,et al. Tighter Bounds for the Multifit Processor Scheduling Algorithm , 1984, SIAM J. Comput..
[236] Charles U. Martel,et al. Preemptive Scheduling with Release Times, Deadlines, and Due Times , 1982, JACM.
[237] Teofilo F. Gonzalez,et al. Preemptive Scheduling of Uniform Processor Systems , 1978, JACM.
[238] C. Potts,et al. Algorithms for two-machine flow-shop sequencing with precedence constraints , 1984 .
[239] B. J. Lageweg,et al. Computer aided complexity classification of deterministic scheduling problems , 1981 .
[240] Michael Pinedo,et al. A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and Repair , 1988, Probability in the Engineering and Informational Sciences.
[241] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[242] Manfred Kunde,et al. Nonpreemptive LP-Scheduling on Homogeneous Multiprocessor Systems , 1981, SIAM J. Comput..
[243] Dan Gusfield,et al. Bounds for Naive Multiple Machine Scheduling with Release Times and Deadlines , 1984, J. Algorithms.
[244] Marshall L. Fisher,et al. Analysis of a linearization heuristic for single-machine scheduling to maximize profit , 1984, Math. Program..
[245] Gerd Finke,et al. New trends in machine scheduling , 1988 .
[246] David S. Johnson,et al. `` Strong '' NP-Completeness Results: Motivation, Examples, and Implications , 1978, JACM.