Benefits of visual management in construction: cases from the transportation sector in England

Purpose The purpose of this paper is to explore the benefits of visual management (VM) systems in transportation construction projects in England. Design/methodology/approach Following a comprehensive literature review, the benefits of VM were investigated through action and case study research executed within two construction projects in England. Findings The main findings are: VM can contribute to increased self-management, better team coordination, better promises or an increasing plan percent complete, easier control for the management and improved workplace conditions in the transportation sector. It is important for the management to obtain the engagement of their workforce for VM through increased participation and show the actual benefits. However, managerial monitoring and control on the systems should not be underestimated. Originality/value The transportation sector in England has been systematically deploying Lean construction techniques in its operations for a while. One of those Lean techniques is a close-range visual communication strategy called VM. The literature on the VM implementation in construction is scarce and generally limited to the building construction context. This paper documents the benefits of VM systems for the transportation sector by using data captured through both qualitative and quantitative data collection methods. The paper also identifies a set of recommendations for similar research efforts in the transportation context in the future.

[1]  Rodney Peter Gapp,et al.  Business improvement strategy or useful tool? Analysis of the application of the 5S concept in Japan, the UK and the US , 2008 .

[2]  Iris D. Tommelein,et al.  More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .

[3]  Michael Ballé,et al.  Lean Managers Must be Teachers , 2013 .

[4]  Ake Gronlund,et al.  Handbook of Action Research Participative Inquiry and Practice , 2001 .

[5]  Brian H. Maskell,et al.  Why do we need lean accounting and how does it work , 2007 .

[6]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[7]  W. R. Seed,et al.  Lean construction. , 2010, HERD.

[8]  James A. Powell,et al.  AN EXPLORATORY STUDY ON THE APPLICABILITY OF PROCESS TRANSPARENCY IN CONSTRUCTION SITES , 2002 .

[9]  Braden R. Kattman,et al.  Visual workplace practices positively impact business processes , 2012 .

[10]  Robert Owen,et al.  Interaction of Lean and Building Information Modeling in Construction , 2010 .

[11]  Stewart Liff,et al.  Seeing is believing : how the new art of visual management can boost performance throughout your organization , 2004 .

[12]  Peter McDermott,et al.  Application of kanban in the UK construction industry by public sector clients , 2008 .

[13]  D. Coghlan,et al.  Action research for operations management , 2002 .

[14]  新郷 重夫,et al.  Zero quality control : source inspection and the poka-yoke system , 1986 .

[15]  Heng Li,et al.  Life-cycle management of construction projects based on virtual prototyping technology , 2010 .

[16]  André Perroni de Burgos,et al.  Assessment of Kanban Use on Construction Sites , 2012 .

[17]  Aguinaldo Bispo dos Santos,et al.  EXPLORING THE ROLE OF VISUAL CONTROLS ON MOBILE CELL MANUFACTURING : A CASE STUDY ON DRYWALL TECHNOLOGY , 2003 .

[18]  Glenn Ballard,et al.  LOOKAHEAD PLANNING: THE MISSING LINK IN PRODUCTION CONTROL , 1997 .

[19]  Pius Achanga,et al.  Critical success factors for lean implementation within SMEs , 2006 .

[20]  Mani Golparvar-Fard,et al.  Research in Visualization Techniques for Field Construction , 2011 .

[21]  洲崎 清,et al.  The new shop floor management : empowering people for continuous improvement , 1993 .

[22]  James P. Womack,et al.  Managing to Learn: Using the A3 Management Process to Solve Problems, Gain Agreement, Mentor and Lead , 2008 .

[23]  D. Greenwood,et al.  Why Action Research? , 2003 .

[24]  Jan Bröchner,et al.  Managing information flow in construction supply chains , 2005 .

[25]  Tariq S. Abdelhamid,et al.  The Challenge: The Impetus for Change to Lean Project Delivery , 2003 .

[26]  Nikkan Kogyo Shimbun Poka-Yoke : Improving Product Quality by Preventing Defects , 1989 .

[27]  R. Yin Case Study Research: Design and Methods , 1984 .

[28]  Lauri Koskela,et al.  Lean Production in Construction , 1993 .

[29]  S. Ho,et al.  Transplanting Japanese management techniques , 1993 .

[30]  Da Brady,et al.  Using visual management to improve transparency in planning and control in construction , 2014 .

[31]  Christine Pasquire,et al.  Exploring the implementation of the Last Planner® System through IGLC community: twenty one years of experience , 2015 .

[32]  Michel Greif,et al.  The Visual Factory: Building Participation Through Shared Information , 1991 .

[33]  Samuel K.M. Ho,et al.  5-S practice: The first step towards total quality management , 1999 .

[34]  Luiz Fernando,et al.  TRANSPARENCY IN BUILDING CONSTRUCTION: A CASE STUDY , 2002 .

[35]  Rafael Sacks,et al.  Requirements for building information modeling based lean production management systems for construction , 2010 .

[36]  Knut Aasland,et al.  An analysis of the uses and properties of the Obeya , 2012, 2012 18th International ICE Conference on Engineering, Technology and Innovation.

[37]  H. Wee,et al.  Lean supply chain and its effect on product cost and quality: a case study on Ford Motor Company , 2009 .

[38]  Ariovaldo Denis Granja,et al.  Construction Sites: Using Lean Principles to Seek Broader Implementations , 2004 .

[39]  Michael Fisher,et al.  Process improvement by poka‐yoke , 1999 .

[40]  Chris A. Ortiz,et al.  Visual Controls: Applying Visual Management to the Factory , 2010 .

[41]  Lúcia H. Fullalove Examples of Lean Techniques and Methodology Applied to Uk Road Schemes , 2013 .

[42]  Jaideep Motwani,et al.  A business process change framework for examining lean manufacturing: a case study , 2003, Ind. Manag. Data Syst..

[43]  Carlos Torres Formoso,et al.  Analysis of a safety planning and control model from the human error perspective , 2005 .

[44]  Stuart D. Green The missing arguments of lean construction , 1999 .

[45]  Stephen Emmitt,et al.  Is good enough “making do”? An investigation of inappropriate processing in a small design and build company , 2012 .

[46]  R. Kaplan Innovation Action Research: Creating New Management Theory and Practice , 1998 .

[47]  Lauri Koskela,et al.  Lean manufacturing of construction components , 1997 .

[48]  Jiju Antony,et al.  Lean Sigma [production and supply chain management] , 2003 .

[49]  D. Fillingham Can lean save lives? , 2007, Leadership in health services.

[50]  Kaoru Kobayashi,et al.  Implementing 5S within a Japanese context: an integrated management system , 2008 .

[51]  Jose Arturo Garza-Reyes,et al.  The impact of lean methods and tools on the operational performance of manufacturing organisations , 2014 .

[52]  Mark Graban,et al.  Value and Waste , 2018, Lean Hospitals.

[53]  Gwendolyn Galsworth The value of vision , 2004 .

[54]  Derek Drysdale Introducing Lean Improvement into the UK Highways Agency Supply Chain , 2013 .

[55]  Søren Munch Lindhard,et al.  Value and Waste in Lean Construction , 2016 .

[56]  K. London,et al.  An industrial organization economic supply chain approach for the construction industry: a review , 2001 .

[57]  Javier Santos,et al.  Learning 5S principles from Japanese best practitioners: case studies of five manufacturing companies , 2014 .

[58]  Sylvain Kubler,et al.  Opportunities for enhanced lean construction management using Internet of Things standards , 2016 .

[59]  Jin Woo Jang,et al.  USING THE KANBAN FOR CONSTRUCTION PRODUCTION AND SAFETY CONTROL , 2007 .

[60]  Hiroyuki Hirano,et al.  5 Pillars of the Visual Workplace , 1995 .

[61]  J. Liker,et al.  The Toyota Way in Services: The Case of Lean Product Development , 2006 .

[62]  Eric Johansen,et al.  Lean Construction: Prospects for the German construction industry , 2007, Lean Construction Journal.

[63]  Chien-Ho Ko,et al.  Making formwork construction lean , 2015 .

[64]  Hiroyuki Hirano,et al.  5 Pillars of the Visual Workplace: The Sourcebook for 5S Implementation , 1995 .

[65]  George L. Hodge,et al.  Adapting lean manufacturing principles to the textile industry , 2011 .

[66]  Michael Lewis,et al.  Lean production and sustainable competitive advantage , 2000 .

[67]  Nicola Bateman,et al.  Managing operations and teams visually , 2013 .

[68]  Yasuhiro Monden,et al.  Toyota Production System: An Integrated Approach to Just-In-Time , 1993 .

[69]  Nadia Bhuiyan,et al.  An overview of continuous improvement: from the past to the present , 2005 .

[70]  Sanjay Bhasin,et al.  Lean viewed as a philosophy , 2006 .

[71]  Lauri Koskela,et al.  Visual management in Brazilian construction companies : taxonomy and guidelines for implementation , 2015 .

[72]  Stephen Emmitt,et al.  Investigating the integration of design and construction from a “lean” perspective , 2009 .

[73]  Petra M. Bosch-Sijtsema,et al.  Visual Management in Mid-sized Construction Design Projects☆ , 2015 .

[74]  Masaaki Imai,et al.  Gemba Kaizen: A Commonsense, Low-Cost Approach to Management , 1997 .

[75]  Rafael Sacks,et al.  Visualization of Work Flow to Support Lean Construction , 2009 .

[76]  Barros Neto,et al.  Incentives and Innovation to Sustain Lean Construction Implementation , 2009 .

[77]  Christine Pasquire,et al.  Lean construction trial on a highways maintenance project , 2007 .

[78]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[79]  Glenn Parry,et al.  Application of lean visual process management tools , 2006 .

[80]  Roberto Arbul Application of Integrated Materials Management Strategies , 2008 .

[81]  Chloe Chen,et al.  Introducing Lean into the UK Highways Agency's supply chain , 2012 .

[82]  C. Eden,et al.  Action Research for Management Research , 1996 .

[83]  Isabelina Nahmens,et al.  Making safety an integral part of 5S in healthcare. , 2014, Work.

[84]  Ossama Salem,et al.  Lean Construction: From Theory to Implementation , 2006 .

[85]  Zoe J. Radnor,et al.  Transferring Lean into government , 2010 .

[86]  J. Liker The Toyota Way , 2003 .

[87]  Bruno Mota,et al.  Implementing Lean Construction Effectively in a Year in a Construction Project , 2013 .

[88]  Pascal Dennis,et al.  Lean Production Simplified : A Plain-Language Guide to the World's Most Powerful Production System , 2002 .